| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.8 CrAccepted-AOC | ₹25.8 Cr | L1 | Accepted-AOC L1 Bidder - Accepted |
| 2 | L2₹27.8 CrRejected-AOC 2 E FRONT BLOCK 283 OLD NO 188 B P H ROAD KILPAUK CHENNAI 600010 | CHENNAI | TAMIL NADU | 600010 | ₹27.8 Cr | L2 | Rejected-AOC L2 Bidder - Rejected |
| 3 | L3₹29.7 CrRejected-AOC NO 5 2 28B RAMAN NAGAR SALEM MAIN ROAD METTUR DAM SALEM DISTRICT 636 403 | SALEM | TAMIL NADU | 636403 | ₹29.7 Cr | L3 | Rejected-AOC L3 Bidder - Rejected |
| 4 | L4₹31.9 CrRejected-AOC | ₹31.9 Cr | L4 | Rejected-AOC L4 Bidder - Rejected |
| Sl No | Description | Qty | Unit | Rajam Engineering Contractors L3 | R.Krishnamurthy & Co L2 | MKMS Builders L4 | shanmathi constructions private limited L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Sectioning and Levelling clearing light jungle | 1,175 | 1m2 | 100 ₹1,17,500 | 5 ₹5,875 Lowest | 120 ₹1,41,000 | 6 ₹7,050 |
| 2.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 3,887 | 1 m3 | 300 ₹11,66,100 | 888 ₹34,51,656 | 350 ₹13,60,450 | 240 ₹9,32,880 Lowest |
| 3.00 | Supplying and Filling of Plain sand from approved quarry including all cost and conveyance etc as per Standard Specification | 1,329.36 | 1m3 | 1,800 ₹23,92,848 Lowest | 1,800 ₹23,92,848 Lowest | 2,400 ₹31,90,464 | 2,200 ₹29,24,592 |
| 4.00 | Cement Concrete 1:5:10 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 1,352.36 | 1m3 | 6,000 ₹81,14,160 | 7,000 ₹94,66,520 | 6,200 ₹83,84,632 | 5,300 ₹71,67,508 Lowest |
| 5.00Cement Concrete 1:1-1/2:3 (One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | |||||||
| 5.10 | Foundation & Basement | 1,927 | 1m3 | 9,000 ₹1,73,43,000 | 9,000 ₹1,73,43,000 | 7,800 ₹1,50,30,600 Lowest | 11,300 ₹2,17,75,100 |
| 5.20 | Ground Floor | 225 | 1m3 | 9,500 ₹21,37,500 | 9,000 ₹20,25,000 | 8,000 ₹18,00,000 Lowest | 11,000 ₹24,75,000 |
| 6.00 | Brick Work in Cement Mortar 1: 5 Mix using well burnt country bricks of size 8 3/4"x4 1/4" x 2 1/4" including all cost and convenyonce for foundation and basement etc complete as per standard specification | 361.08 | 1m3 | 8,500 ₹30,69,180 | 6,500 ₹23,47,020 Lowest | 8,250 ₹29,78,910 | 6,780 ₹24,48,122.4 |
| 7.00 | Collection and Supply of Screened Gravel from Apporoved quarry incluiding cost and conveyance etc complete as per standard specification | 4,326.5 | 1m3 | 1,200 ₹51,91,800 | 1,300 ₹56,24,450 | 1,750 ₹75,71,375 | 1,100 ₹47,59,150 Lowest |
| 8.00Cement Concrete 1:2:4 (One Cement, Two Sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | |||||||
Tender Value
₹34.9 Cr
EMD Value
₹35 L
Closing Date
1 Dec 2025, 3:00 pmClosed
Chief Mission Director, TNCRM
Office of the Chief Mission Director, Tamil Nadu Coastal Restoration Mission, 9th Floor, No.327, Metros, Anna Salai, Nandanam, Chennai - 600 035
Construction of International Dugong Conservation Centre at Manora, Thanjavur District, Tamil Nadu
2025_TNCRM_619384_1
IN-TNSHORE-520569-CW-RFB
Open Tender
Civil Works
Works
730 days
Manora, Thanjavur District
Please refer RFB
9 documents required · 9 mandatory
₹0
₹35 L
Office of the Chief Mission Director
4 Mar 2026
1 Nov 2025
1 Dec 2025
1 Nov 2025
1 Dec 2025
27 Nov 2025
1 Nov 2025 - 13 Nov 2025
11 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sectioning and Levelling clearing light jungle | |||||
| 2Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | |||||
| 3 | Supplying and Filling of Plain sand from approved quarry including all cost and conveyance etc as per Standard Specification | 1 | 1m3 | - | - |
| 4 | Cement Concrete 1:5:10 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 1 | 1m3 | - | - |
| 5Cement Concrete 1:1-1/2:3 (One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | |||||
| 5.1 | Foundation & Basement | - | 1m3 | - | - |
| 5.2 | Ground Floor | - | 1m3 | - | - |
| 6 | Brick Work in Cement Mortar 1: 5 Mix using well burnt country bricks of size 8 3/4"x4 1/4" x 2 1/4" including all cost and convenyonce for foundation and basement etc complete as per standard specification | 1 | 1m3 | - | - |
| 7Collection and Supply of Screened Gravel from Apporoved quarry incluiding cost and conveyance etc complete as per standard specification | |||||
| 8Cement Concrete 1:2:4 (One Cement, Two Sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | |||||
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.13 MB
FinalRFB_DugongCC_20251101.pdf
Tender Documents • 8.95 MB
DugongCC_AllDrawings.pdf
Additional Documents • 22.65 MB
TechnicalSpecifications.pdf
Additional Documents • 1.51 MB
BOQ_740504.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].