| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 CrAccepted-AOC 42 141C KRISHNA KUNJ HALWAI KI BAGHICHI AGRA | AGRA | AGRA | UTTAR PRADESH | ₹4.6 Cr | L1 | Accepted-AOC Preparation Bond for Rs. 45657186.41 Only |
| 2 | L2₹4.6 Cr+₹7.0 L (1.53%)Rejected-Finance 7C GOVIND NAGAR MATHURA | MATHURA | ₹4.6 Cr+₹7.0 L (1.53%) | L2 | Rejected-Finance Rejected due to higher Rates |
| 3 | L3₹5.2 Cr+₹59.9 L (13.1%)Rejected-Finance PLOT NO 91 ELLORA ENCLAVE DAYALBAGH AGRA | AGRA | UTTAR PRADESH | 282001 | ₹5.2 Cr+₹59.9 L (13.1%) | L3 | Rejected-Finance Rejected due to higher Rates |
| 4 | L4₹5.3 Cr+₹69.7 L (15.3%)Rejected-Finance | ₹5.3 Cr+₹69.7 L (15.3%) | L4 | Rejected-Finance Rejected due to higher Rates |
| 5 | L5₹5.6 Cr+₹98.8 L (21.6%)Rejected-Finance | ₹5.6 Cr+₹98.8 L (21.6%) | L5 | Rejected-Finance Rejected due to higher Rates |
| Sl No | Description | Qty | Unit | M/s Akash Deep Construction Compnay L2 | HARIBHAN SINGH CONTRACTOR L1 | M/S SHREE RAM CONSTRUCTION L6 | MUNNA LAL GUPTA CONTRACTOR L4 | SJI INFRABUILD PRIVATE LIMITED L3 | M/S G.G. INFRATECH L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Scarifying existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lift and leads upto 1000 m as per Technical Specification Clause 305.4.3 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 7,000 | Sqm | 4 ₹28,000 | 1 ₹7,000 Lowest | 30 ₹2,10,000 | 3.6 ₹25,200 | 2 ₹14,000 | 5 ₹35,000 |
| 2.00 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. As per MORT&H Specification No. 301 (3.6). (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 3,500 | Cum | 50 ₹1,75,000 | 20 ₹70,000 Lowest | 25 ₹87,500 | 54 ₹1,89,000 | 30 ₹1,05,000 | 50 ₹1,75,000 |
| 3.00 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.6 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 4,000 | Cum | 50 ₹2,00,000 | 20 ₹80,000 Lowest | 44 ₹1,76,000 | 49.48 ₹1,97,920 | 30 ₹1,20,000 | 50 ₹2,00,000 |
| 4.00 | Construction of Embankment with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 7,000 | Cum | 50 ₹3,50,000 | 50 ₹3,50,000 | 50 ₹3,50,000 | 139.3 ₹9,75,100 | 30 ₹2,10,000 Lowest | 150 ₹10,50,000 |
| 5.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 2,250 | Cum | 50 ₹1,12,500 | 140 ₹3,15,000 | 50 ₹1,12,500 | 144.13 ₹3,24,292.5 | 30 ₹67,500 Lowest | 150 ₹3,37,500 |
| 6.00 | Construction of granular sub-base by providing granular material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. As per MoRT&H clause 401(b). (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 3,400 | Cum | 1,900 ₹64,60,000 Lowest | 2,010 ₹68,34,000 | 2,500 ₹85,00,000 | 2,319.72 ₹78,87,048 | 2,200 ₹74,80,000 | 2,299 ₹78,16,600 |
| 7.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H Specification 406.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 4,200 | Cum | 1,900 ₹79,80,000 Lowest | 2,010 ₹84,42,000 | 3,350 ₹1,40,70,000 | 2,403.92 ₹1,00,96,464 | 2,400 ₹1,00,80,000 | 2,600 ₹1,09,20,000 |
| 8.00 | Providing & applying Primer Coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spreading primer at the rate of 0.70 Kg./Sqm. Using machanical means. Before Applying prime coat, the surface will be cleaned with Mechanical broom and water will also be sprinkled with water tanker to keep the surface Moist. The Prime coat will be applied 24 hrsbefore the application of bituminous course including all Taxes, Material, Labour, T&P etc required for proper completion of the work.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 28,600 | Sqm | 13 ₹3,71,800 | 8 ₹2,28,800 Lowest | 15 ₹4,29,000 | 28.16 ₹8,05,376 | 18 ₹5,14,800 | 15 ₹4,29,000 |
| 9.00 | Providing and laying Dense Graded Bituminous Macadam with 100-120TPH HMP using crushed aggregates of specified grading premixed with bituminous binder @ 4.50% by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled vibratory & tandem rollers to achieve the desired compaction as per MORT&H specification clause 505 complete in all respects.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 1,430 | Cum | 7,900 ₹1,12,97,000 | 7,700 ₹1,10,11,000 Lowest | 9,000 ₹1,28,70,000 | 8,000 ₹1,14,40,000 | 8,100 ₹1,15,83,000 | 9,000 ₹1,28,70,000 |
| 10.00 | Providing and applying tack coat with bitumen VG-10 using Bitumen Pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 28,600 | Sqm | 8 ₹2,28,800 | 7 ₹2,00,200 Lowest | 12 ₹3,43,200 | 10 ₹2,86,000 | 7 ₹2,00,200 Lowest | 10 ₹2,86,000 |
Tender Value
₹6.9 Cr
EMD Value
₹13.8 L
Closing Date
16 Dec 2025, 12:00 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Widening and strengthening of the road from Baman to Balot of Agra district
2025_CEAGR_1097764_1
5260/14M-AC/2025-26 dated 11-11-2025
Open Tender
Civil Works
Item Wise
365 days
Agra
Widening and strengthening
2 documents required · 2 mandatory
₹2,360
₹13.8 L
Yes
Agra
28 Jan 2026
9 Dec 2025
16 Dec 2025
9 Dec 2025
16 Dec 2025
9 Dec 2025
11 Dec 2025
Amount
Scarifying existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lift and leads upto 1000 m as per Technical Specification Clause 305.4.3 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. As per MORT&H Specification No. 301 (3.6). (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.6 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Construction of Embankment with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Construction of granular sub-base by providing granular material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. As per MoRT&H clause 401(b). (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H Specification 406.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing & applying Primer Coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spreading primer at the rate of 0.70 Kg./Sqm. Using machanical means. Before Applying prime coat, the surface will be cleaned with Mechanical broom and water will also be sprinkled with water tanker to keep the surface Moist. The Prime coat will be applied 24 hrsbefore the application of bituminous course including all Taxes, Material, Labour, T&P etc required for proper completion of the work.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing and laying Dense Graded Bituminous Macadam with 100-120TPH HMP using crushed aggregates of specified grading premixed with bituminous binder @ 4.50% by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled vibratory & tandem rollers to achieve the desired compaction as per MORT&H specification clause 505 complete in all respects.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing and applying tack coat with bitumen VG-10 using Bitumen Pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing and laying bituminous concrete with 100-120TPH hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.40% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Construction of un-reinforced, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.SI No- 12.1 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing and laying cement concrete in 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) as per DSR 6.1.1 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Laying and fixing of N.P.-3 600mm dia Hume pipe in proper position as directed by E/I including cartage of pipes/collars upto 30m distance (labour only) excluding cost of pipes/collars. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Pointing with cement mortar (1:3) on brick work in substructure as per drawing anas Technical specification Clause 1300 & 2200 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Plain Cement Concrete (PCC Grade M15) in Open Foundation complete as per Drawing and Technical Specifications. Clause 1500, 1700 & 2100 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Plastering with cement mortar 1:3 on brick work in substructure as per drawing anas Technical specification Clause 1300 & 2200 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Reinforced Cement Concrete (M-20) in sub-structure complete as per Drawing and Technical Specifications Clause 1500, 1700 & 2100 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth/Above level (Thermo-Mechanically Treated bars of grade Fe-500D or more.). As per DSR S.I. No. 5.22.6 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Part-B Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. including royalty on materials. GST shall be paid extra as applicable at the time of payment.
Part-B Maintainance of First Year (@ 0.00% of Total Work Amount of 1 to 21)
Part-B Maintainance of Second Year (@0.25% of Total Work Amount of 1 to 21)
Part-B Maintainance of Third Year (@0.50% of Total Work Amount of 1 to 21)
Part-B Maintainance of Fourth Year (@0.75% of Total Work Amount of 1 to 21)
Part-B Maintainance of Fifth Year (@1% of Total Work Amount of 1 to 21)
M/s Akash Deep Construction Compnay (BID ID -5746006)
SJI INFRABUILD PRIVATE LIMITED (BID ID -5762116)
MUNNA LAL GUPTA CONTRACTOR (BID ID -5749324)
M/S G.G. INFRATECH (BID ID -5748637)
M/S SHREE RAM CONSTRUCTION (BID ID -5761612)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.77 MB
BOQ_2021516.xls
BOQ • 0.30 MB
SBDAddendumBAMANBELOT.pdf
Tender Documents • 2.38 MB
SBD_BAMANBELOT.pdf
Tender Documents • 2.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .