Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹58.4 L | ₹58.4 L |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
28 Apr 2026, 12:00 pmClosed
END PART (EMU TC, AUTO DOOR, SWAP)
02261262
02261262
Limited - Indigenous
Chennai, Unknown (Unspecified Location)
₹0
₹1.1 L
13 Apr 2026
13 Apr 2026
Description :ONE COACH SET OF END PART FOR AIR CONDITIONED EMU TRAILER COACHES TO DRG. NOS. EMU/C/AC-1-1-002, COL-III, ALT 'd' -1 NO, EMU/C/AC-1-1-003, COL-I, ALT 'c' -1 NO. Special Condit ion : SPECIAL CONDITION: i) THE MANUFACTURING FACILITY REQUIREMENT AS PER ICF/MD/SPEC-147, ISSUE STATUS-01,REV-02, AMENDMENT NO.02. ii) BODY BOLSTER TO DRG.NO.ICF/MRVC/C/SS-1-1-005, ALT 'h', COL.I TO BE PROVIDED WITHOUT a)SIDE BEARERS TO DRG.NO.EMU/M-1-1-027,ALT 'z' COL-II. b)GRUBSCREWS TO DRG.NO.ICF/MRVC/C/SS-1-1-005, ALT 'h' ITEM-8, AND c)SIDE BEARER COVERS TO DRG.NO.EMU/M-1-1-027, ALT 'z' ITEM-1. iii)THE UNDER FRAME END PART SHOULD BE SUPPLIED WITH NORMAL SIDE UP AND SIDE BEARER SIDE DOWN. DETAILS FOR SATGE INSPECTION. (a) Raw Material S tage # Ensure the raw material used using portable spectrometer (b) Jig Stage # Assembly of sole bar with cross members. # Assembly of Body bolster arrangement. # Welding of ribs with sole bar. # Placing & welding of top sheet arrangement. # Dimensional & Visual checks. # Punching of Serial No & ensuring proper traceability. (c) Surface preparation and painting stage. # Short/Sand blast to the r equirements. # Painting process as per the specification. # Final product Inspection. Note: Application of Aluminium welding coat to RCF spec MDTS-28272 latest revision on top surface of cross members s hall be ensured before welding the trough floor with cross members to avoid bi-metallic corrosion. SUI TABLE PACKING TO BE DONE TO PREVENT DAMAGE DURING TRANSIT, UNLOADING AND RUST PREVEN TION DURING STORAGE. [SAFETY ITEM] [ Warranty Period: 30 Months after the date of delivery ] [Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitt ed: Max 8 lacs ] ] Consignee Shell Depot/ICF,Chennai, ICF Tamil Nadu 8.00 Set Product Inspection:Stage 1: Raw Material Stage (Ref:Description) (100% of PO Qty ), Inspection Stage 2: Jig Stage (Ref:Description) (100% of PO Qty ), Stage 3: Surface preparation and Details painting stage (Ref:Desc) (100% of PO Qty )
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5716380.pdf
ATTACHMENT
5716381.pdf
ATTACHMENT
5716373.pdf
ATTACHMENT
5716389.pdf
ATTACHMENT
5716383.pdf
ATTACHMENT
5716386.pdf
ATTACHMENT
5716374.pdf
ATTACHMENT
Download all tender documents and submit your bid