Tender Value
Refer Docs
EMD Value
₹6,235
Closing Date
28 Jun 2023, 9:00 amClosed
Block Development Officer,Kottur Block
Block Development Office,Kottur Block (v.pt)
Construction of two class room building for Panchayat Union Middle School at Nochiyur in Nochiyur Panchayat, Kottur block under the scheme SIDS 2022-23 -P6
2023_RDTN_330316_1
Rc.No.973/2023/a2 date 14.06.2023-SIDS - P6
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kottur Block
As per Tender Document
3 documents required · 3 mandatory
₹0
₹6,235
Yes
30 Jun 2023
21 Jun 2023
28 Jun 2023
21 Jun 2023
28 Jun 2023
21 Jun 2023
Amount
1.Renovation of PUE school building (SSA-RCC Building) Kilarveli at Nochiyur Panchayat
Dismantaling of Cement Concrete Surface Including all labour Charges and removing depris from the work site etc, complete.,…
Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,…
Supplying and filling in foundation and basement with filling sand including water consolidating etc., Including all labour Charges. As per standard Specification
PCC 1:4:8 using 40mm HBGs jelly for foundation concrete complete complying with standard specifications and as directed by the departmental officers.
Ceiling Plastering with CM 1:3,10mm thick. complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental off
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Distempering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over Old Wood works such as Wood doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta
BLACK BOARD Painting Two Coats Approved ready mixed Paint with one coat primer old surface including cost and conveyance of materials and labour charges etc complete.
Provision for Teacher cub board
Provision for Cheppal track
Provision for Drinking arrangement
Provision for Student cub board
Provision for Picture Painting
Provision for Sponge Roller
Provision for Display Notification Box
Electrical Work Arrangement
Service Pipe Connection
Service Wire Connection
Ceiling Fan
2.Renovation of PUE school Toilet building South Facing in Nochiyur at Nochiyur Panchayat
Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,…
Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental off
Floor finishing with Ceromic Tiles of size 20cmx20cm including all cost and convenyence to Site and all labour charges etccomplete,.
Dadooing of walls with glazed tiles of size 15cm x 15cm x 6mm laid in cm1:2,10mm thick & pointing with cement using 0.4kg/cm2
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Distempering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over Old Wood works such as Wood doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta
Supply and Fixing of PVC Pipe 110mm for sanitary arrangements
Provision for New iron Door
Septic Tank
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Supplying and filling in foundation and basement with filling sand including water consolidating etc.,
PCC 1:4:8 using 40mm HBGs jelly for foundation concrete including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Brick work in cement mortar 1:5 using country bricks of size 83/4"x41/4"x23/4" etc., complete
Plastering with CM 1:5,12mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Supplying and fabricating and placing in position MS or RTS reinforcement works
Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly including cost and conveyence of all materials to site and all labour charges etc., complete
Supply and Fixing of Soakpit pit arrangements for cover slab and Rcc rings etc
3.Renovation of PUE school Toilet building in Kilarveli at Nochiyur Panchayat
Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,…
Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,…
Ceiling Plastering with CM 1:3,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental off
Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental off
PCC 1:4:8 using 40mm HBGs jelly for foundation concrete including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Floor finishing with Ceromic Tiles of size 20cmx20cm including all cost and convenyence to Site and all labour charges etccomplete,.
Dadooing of walls with glazed tiles of size 15cm x 15cm x 6mm laid in cm1:2,10mm thick & pointing with cement using 0.4kg/cm2
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Distempering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over Old Wood works such as Wood doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta
4.Providing OF 140MM DIA BORE WELL AND ERECTION OF Sintex tank @ PUE School in Seruvamani Panchayat
Drilling of borewell anywhere in thiruvarur dist including Transportation from one place to another with in thiruvarur dist in alluvial soil sedimendary strata of clay and sand or sand stone shala pepples bouldrs etc by first taking a bilot bore of 140mm/150mm Dia and taen enlar ginng to requred dia by direct or reverse rotry mud circulation mathod using contractors rig fuvl labour driling bendonit mud and water requdi for diling including construction of mud bit only glaxy drills are to be used
upto 60m depth ending below GL
Reaming of 140m Dia bore to 300mm dia bore
Upto 60mm deth ending belo G.L
Labour charges for inserting PVC casing ipe assembly with silot or without silot in the drilled holle including joinding the pipe with PVC copler with cement past compliet and supplying and packing and annulur space with pepples os size and qulity 140mm OD PVC Casing ipe assembly
supply and delevery of flowing PVC casing pipe
140mm OD PVC Casing Pipe Plain
140mm OD PVC Casing Pipe Slot
140mm OD PVC End Cap
Charges for developing the Borewell By required air compressor of 600CFM capasaty including fuval transport cres etc . Complet.
connstruction of pedasatal for MS Kiosk of size 0.75mx0.45mx0.75m made up of MS angle of size 50mmx50mmx4mm in B.W in cm 1:6 Plastering with cm 1:3 mix of suitaple size and construction of Pcc platform around the petstal 2m dia as per TWAD board dype design .
supply and delevery of Monoblock pumbset 2HP single phase with isi mart and suidaple for the installation in 140mm dia borewell and the pumpset should be suppliet with 5m cable 2.5mm.(15x100)
supply and delevery of panal Poard with isi mart and suitaple for 1hp sigl phase sumbersible Pumpset.
Cost and supply of 32 mm dia HDPE pipes for submersible pump in borewell.
supply and delevery of following G.I Pipes and specials.
supply and delevery of 50mm GI Pipe (For tenk connection).
50mm GI copleing
50mm GI Elbow
50mm GI Flange set
50mm G.I Clamp set
Bore cover 5''
cost of 2.5sqmm flat cable
supply and delevery of 1000litter capacity HDPE tank as per is 12701/1996 including lodading and unloading trasportatio fixning pipe connection works and fiinng charges etc .
Labour charges erection of submersible pump set in borewell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves errection clamps,pressure gagues upto the exterior wall of pump room and errection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot lamps capacitor single phasing preventer, water level guard and laying and joining the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days.
GST Amount for providing Service to Government Contract Works for the above works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
B.Mathialagan
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .