| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC NO 430B ARAKKONAM TIRUTHANI ROAD ARAKKONAM RANIPET DISTRICT | ARAKKONAM | RANIPET | TAMIL NADU | ₹7.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.7 LRejected-Finance | ₹7.7 L | L2 | Rejected-Finance Second Less Amount |
| Sl No | Description | Qty | Unit | R PANDU L2 | MPANDCO L1 |
|---|---|---|---|---|---|
| 1.00Construction of New Kitchen shed room at PUM school in Kilandur panchayat | |||||
| 2.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 6.88 | cum | 265 ₹1,823 | 263.78 ₹1,815 |
| 3.00 | Collection and supply of Gritty gravel from approved quarry inclunding cost and charges etc | 7.7 | cum | 290 ₹2,233 | 280.34 ₹2,159 |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 5.62 | cum | 6,100 ₹34,282 | 6,068.02 ₹34,102 |
| 5.00 | Up to Basement | 3.03 | cum | 6,300 ₹19,089 | 6,299.13 ₹19,086 |
| 6.00 | Above Basement | 13.84 | cum | 6,500 ₹89,960 | 6,392 ₹88,465 |
| 7.00 | Column Below | 4.58 | cum | 10,000 ₹45,800 | 9,224.69 ₹42,249 |
| 8.00 | Column Above | 6.9 | cum | 9,365.76 ₹64,624 | 9,365.76 ₹64,624 |
| 9.00 | Below GL | 15.93 | cum | 600 ₹9,558 | 545 ₹8,682 |
| 10.00 | Above GL | 55.64 | cum | 1,100 ₹61,204 | 1,095 ₹60,926 |
Tender Value
₹7.6 L
EMD Value
₹7,560
Closing Date
6 Nov 2025, 3:00 pmClosed
BDO BP
Panchayat Union Arakkonam
Construction of New Kitchen shed room at PUE school in Kilandur panchayat
2025_RDTN_618545_1
A6/4819/2025
Open Tender
Civil Works
180 days
Arakkonam
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹7,560
Yes
16 Dec 2025
30 Oct 2025
6 Nov 2025
30 Oct 2025
6 Nov 2025
30 Oct 2025
Amount
Construction of New Kitchen shed room at PUM school in Kilandur panchayat
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Collection and supply of Gritty gravel from approved quarry inclunding cost and charges etc
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Up to Basement
Above Basement
Column Below
Column Above
Below GL
Above GL
Supply and fabrication of steel including cost and conveyance and all labour charges etc. complete.
Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc.
Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers inclunding preparation of surface curing etc
Providing granolithic floor finish Cement Concrete 1:2:4 mix using 10-12mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Weathering coarse concrete using 20mm size broken brick jelly with in pure slaked the RCC Roof in the proportion of 32:12 1/2 by volume laid in layer beating the concrete with the wooden batters etc are as per standard etc
Finishing the top of roof with one course of pressed tiles conveyance of all materials and all labour charges etc
Towards the cost of steel door of size 0.90mx2.10 m including all charges etc.
Towards the cost of steel window of size 1.20mx1.3 m including all charges etc.
Painting two coat with approved quality of oil bound distemper with colour over one coat of white cement for primier coat for the base including preparing surface and all materials cost labour etc
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc complete.
Painting two coats using Ist quality readymix enamel paint of approved colour including cost and conveyance and all labour charges etc.
LIGHT POINT SD 20
Plug point
Exhaust Fan
Bulk head fitting (SD83)
Tube light
Cost & Supply of Cudappah Slab including cost and conveyance of all materials to work site and labor charges etc complete.
Providing and fixing PVC Rain water down fall pipes of 100mm dia with necessary shoes bends and other specials clamps screws nails teakwood plugs etc
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
R PANDU (BID ID -1503557)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_739367.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid