Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹3,600
Closing Date
24 Aug 2021, 2:00 pmClosed
SE/GCC/Madurai
SE/GCC/MADURAI
Entrusting House keeping Cleaning Sweeping Conservancy works CO samayanallur, Mdu
2021_EB_208218_1
SE-GCC-MDU SPEC.NO.014/2021-22
Open Tender
Civil Works - Others
Works
90 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
Yes
THE SUPERINTENDING ENGINEER/GCC/MADURAI
₹3,600
Yes
24 Sept 2021
17 Aug 2021
25 Aug 2021
17 Aug 2021
24 Aug 2021
17 Aug 2021
Amount
Sweeping and mopping of the office floors (Flooring with ceramic / marble / granite tiles) steps, stair cases, handrails with scented cleaning agents including clearing and disposal of waste papers daily, dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceilings (Brick, Wooden & Aluminium, Glazed) stair case, hand rails, doors, windows, blinds, name boards, electrical fittings viz., Tube lights, fans, electrical fixtures, switch boxes, etc., removal of cobweb once in a month collecting and disposing all the waste to outside of the office complex, with all general cleaning inside the office floors etc., complete as directed by the engineer at site including the cost of all labour, labour uniforms, lead, lift, T & P, cost of all consumable materials such as cleaning powder, Broom Sticks, Cob web sticks, Bamboo baskets, swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc., complete.
Sweeping and mopping of the office floors (Flooring with cement mortar) steps, stair cases, handrails with scented cleaning agents including clearing and disposal of waste papers and debris daily, dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceilings (Brick, Wooden & Aluminium, Glazed) stair case, hand rails, doors, windows, blinds, name boards, electrical fittings viz., Tube lights, fans, electrical fixtures, switch boxes, etc., removal of cobweb once in a month collecting and disposing all the waste to outside of the office complex, with all general cleaning inside the office floors etc., complete as directed by the engineer at site including the cost of all labour, labour uniforms, lead, lift, T & P, cost of all consumable materials such as cleaning powder, Broom Sticks, Cob web sticks, Bamboo baskets, swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc., complete. (To be carried out daily)
Sweeping of open area around office buildings collection and removal of garbage and wastes from campus to outside office complex daily, all general outdoor cleaning with sprinkling of water, including removal of weeds and unwanted materials as directed by the engineer at site including the cost of all labour, labour uniforms, lead, lift, T & P, cost of all materials such as Coconut Brooms, Bamboo baskets, cost of all consumables etc., complete. (To be carried out all working days)
Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt / refuge and cob webs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odour or foul smell. (3 times in a day) Toilet floors (includes cleaning of wall tiles and doors / ventilators, removal of cobweb)
Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt / refuge and cob webs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odour or foul smell. (3 times in a day) Water closets (IWC / EWC)
Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt / refuge and cob webs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odour or foul smell. (3 times in a day) Urinals cleaning and providing scented urinal screen, coloured naphthalene balls
Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt / refuge and cob webs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odour or foul smell. (3 times in a day) Wash basins
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .