Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-Finance RUPCHANDPUR MIRSHADPUR BADLAPUR JAUNPUR | JAUNPUR | UTTAR PRADESH | L1 | Accepted-Finance L1 | |
| 2 | L2₹3.6 Cr+₹55.8 L (18.6%)Rejected-Finance 00 0 FATEHPUR NEAR SAHARA FARM BAKKAS LUCKNOW LUCKNOW UTTAR PRADESH 226002 | LUCKNOW | UTTAR PRADESH | 226002 | L2 | Rejected-Finance L2 | |
| 3 | L3₹3.6 Cr+₹60.3 L (20.1%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹3.7 Cr+₹68.9 L (23.0%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹3.7 Cr+₹70.2 L (23.4%)Rejected-Finance RAMSEVAKPURAM COLONY HARIHARPUR NILGAYA LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S ARYA ENTERPRISES L2 | M/s Rai Construction L5 | NAGENDRA PRATAP SINGH L1 | SHREEASHOK PRIVATE LIMITED L3 | RAM NARAYAN YADAV L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | E/W in Making coffer dam etc in all types of soil with all leads & lifts and dressing including cost of all T&P,Labour etc required for proper completion of work. | 3,562.5 | M³ | 100 ₹3,56,250 | 70 ₹2,49,375 | 70 ₹2,49,375 | 69 ₹2,45,812.5 Lowest | 100 ₹3,56,250 |
| 2.00 | E/W in excavation of foundation in all type of soil including lead up to 30m lift up to 1.50m and its proper disposal and back filling as per direction by engineer in charge required for proper complection of work including cost of all T&P,Labour etc. | 31,050.94 | M³ | 100 ₹31,05,094 | 105 ₹32,60,348.7 | 80 ₹24,84,075.2 Lowest | 88 ₹27,32,482.72 | 115 ₹35,70,858.1 |
| 3.00 | Laying C.C- A 40 M-10 in foundation of all structures with Cement O.P.C.,43 grade coarse sand of F.M. not less than 2.0 and hard stone ballest (20-40mm size) including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T&P. etc. | 75 | M³ | 11,500 ₹8,62,500 | 12,020 ₹9,01,500 | 9,500 ₹7,12,500 Lowest | 12,015 ₹9,01,125 | 11,800 ₹8,85,000 |
| 4.00 | Laying R.C.C, A-20, M-25 with cement coarse sand of F.M not less than 2.5 and crushed hard stone grit of size 4.75 to 20mm, including lead up to 60m lift up to 3m, mechnical mixing & mechnical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc. | 313.95 | M³ | 11,800 ₹37,04,610 | 12,770 ₹40,09,141.5 | 10,500 ₹32,96,475 Lowest | 12,774 ₹40,10,397.3 | 12,500 ₹39,24,375 |
| 5.00 | Centering & Shuttering for C.C & R.C.C work with all lead & lift reqired for proper completion of work including cost of all material and scafolding labour, T&P etc. | 2,164.56 | M² | 950 ₹20,56,332 | 1,000 ₹21,64,560 | 600 ₹12,98,736 Lowest | 999 ₹21,62,395.44 | 980 ₹21,21,268.8 |
| 6.00 | Cutting bending binding and placing TMT steel bar for reinforcement with cost of binding wire with required for proper compltion of work including cost of all material, labour, T&P etc | 40.18 | MT | 79,000 ₹31,74,220 | 81,190 ₹32,62,214.2 | 65,000 ₹26,11,700 Lowest | 81,150 ₹32,60,607 | 81,000 ₹32,54,580 |
| 7.00 | Dewatering with all cost of power POL machine pump, well point system & operator with assembling & dismantling of equipment etc/kwh. | 65,349.6 | Kwh | 35 ₹22,87,236 | 41 ₹26,79,333.6 | 20 ₹13,06,992 Lowest | 40 ₹26,13,984 | 39 ₹25,48,634.4 |
| 8.00 | Filling of local sand with all lead lift, including excavation, loading, unloading, with all cost of labour T&P etc. complete in all respects. | 1,514.1 | Cum | 500 ₹7,57,050 Lowest | 705 ₹10,67,440.5 | 1,200 ₹18,16,920 | 700 ₹10,59,870 | 550 ₹8,32,755 |
| 9.00 | Providing & Supplying of I.S.I. Marked H.D.P.E. Pipe confirming to I.S. 4984:2016 or its latest HDPE Pipe dia 200mm/PN-6. | 300 | RM | 1,000 ₹3,00,000 | 1,005 ₹3,01,500 | 900 ₹2,70,000 Lowest | 1,000 ₹3,00,000 | 1,003 ₹3,00,900 |
| 10.00 | Brick work in sub-structure with cement 1:4 including cost of material labour T&P etc. | 214.7 | M³ | 7,450 ₹15,99,515 | 7,460 ₹16,01,662 | 6,800 ₹14,59,960 Lowest | 7,450 ₹15,99,515 | 7,460 ₹16,01,662 |
Tender Value
Refer Docs
EMD Value
₹7.8 L
Closing Date
6 Nov 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Superintending Engineer, Rapti Nahar Nirman Mandal-2,Basti (U.P.)
Construction work of wells at different places in between Km. 51.000 to km. 62.106 of Campierganj Branch in District Maharajganj.
2026_UPIDC_1200558_1
Tender Notic 05/SE/2026-27
Open Tender
Civil Works
Item Wise
180 days
Mahrajganj
Construction work of wells at different places in between Km. 51.000 to km. 62.106 of Campierganj Branch in District Maharajganj.
2 documents required · 2 mandatory
₹7,327
₹7.8 L
10 Nov 2026
26 Oct 2026
6 Nov 2026
26 Oct 2026
6 Nov 2026
26 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in Making coffer dam etc in all types of soil with all leads & lifts and dressing including cost of all T&P,Labour etc required for proper completion of work. | 3,562.5 | M³ | - | - |
| 2 | E/W in excavation of foundation in all type of soil including lead up to 30m lift up to 1.50m and its proper disposal and back filling as per direction by engineer in charge required for proper complection of work including cost of all T&P,Labour etc. | 31,050.94 | M³ | - | - |
| 3 | Laying C.C- A 40 M-10 in foundation of all structures with Cement O.P.C.,43 grade coarse sand of F.M. not less than 2.0 and hard stone ballest (20-40mm size) including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T&P. etc. | 75 | M³ | - | - |
| 4 | Laying R.C.C, A-20, M-25 with cement coarse sand of F.M not less than 2.5 and crushed hard stone grit of size 4.75 to 20mm, including lead up to 60m lift up to 3m, mechnical mixing & mechnical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc. | 313.95 | M³ | - | - |
| 5 | Centering & Shuttering for C.C & R.C.C work with all lead & lift reqired for proper completion of work including cost of all material and scafolding labour, T&P etc. | 2,164.56 | M² | - | - |
| 6 | Cutting bending binding and placing TMT steel bar for reinforcement with cost of binding wire with required for proper compltion of work including cost of all material, labour, T&P etc | 40.18 | MT | - | - |
| 7 | Dewatering with all cost of power POL machine pump, well point system & operator with assembling & dismantling of equipment etc/kwh. | 65,349.6 | Kwh | - | - |
| 8 | Filling of local sand with all lead lift, including excavation, loading, unloading, with all cost of labour T&P etc. complete in all respects. | 1,514.1 | Cum | - | - |
| 9 | Providing & Supplying of I.S.I. Marked H.D.P.E. Pipe confirming to I.S. 4984:2016 or its latest HDPE Pipe dia 200mm/PN-6. | 300 | RM | - | - |
| 10 | Brick work in sub-structure with cement 1:4 including cost of material labour T&P etc. | 214.7 | M³ | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
Lot-01well.pdf
Tender Documents • 1.74 MB
BOQ_2271416.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .