Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.4 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹35.4 L+₹13.0 L (57.9%)Rejected-AOC B 301 TRIVENI S V ROAD SANTACRUZ WEST MUMBAI MAHARASHTRA 400054 | MUMBAI SUBURBAN | MAHARASHTRA | 400054 | L2 | Rejected-AOC L2 | |
| 3 | L3₹62.7 L+₹40.3 L (179.6%)Rejected-AOC T 305 TF TIRUPATI PLAZA SECTOR XI MLU PKT 4 PLOT NO 11 DWARKA NEW DELHI 110075 | SOUTH WEST | DELHI | 110075 | L3 | Rejected-AOC L3 | |
| 4 | L4₹72.2 L+₹49.8 L (222.1%)Rejected-AOC NO 400 ABC TOWERS 13TH STREET SIDCO INDUSTRIAL ESTATE AMBATTUR CHENNAI TAMIL NADU 600098 | 600098 | L4 | Rejected-AOC L4 | |
| 5 | Rejected-Technical 5TH FLOOR KAILASH BUILDING 26 K G MARG CANAUGHT PLACE CENTRAL DELHI DELHI 110001 | NEW DELHI | DELHI | 110001 | - | Rejected-Technical Bid Security (EMD) not remitted |
Tender Value
Refer Docs
EMD Value
₹44,000
Closing Date
6 Jun 2022, 2:00 pmClosed
Chief Engineer/Civil DRIP,Chennai - 600002.
O/o Chief Engineer/Civil DRIP TANGEDCO, IIIrd Floor, Eastern wing, NPKRR Maaligai, 144, Anna Salai, Chennai-2
TANGEDCO Dam Rehabilitation and Improvement works DRIP Conducting Environmental and Social Impact Assessment Study and preparation of Environmental and Social Management Plans ESMP for Papanasam Diversion Weir Desilting works Package IV.
2022_EBMDB_231108_1
CE/ C/ DRIP/ PD/ SPMU/ NCB No.01 /2022-23
Open Tender
Civil Works - Others
Works
180 days
Tirunelveli Generation Circle
As per SPECIFICATION
5 documents required · 5 mandatory
₹0
₹44,000
15 Mar 2023
6 May 2022
6 Jun 2022
6 May 2022
6 Jun 2022
7 May 2022
7 May 2022 - 13 May 2022
Amount
Conducting Baseline Study of the Project Site to assess the overview of the project such as , Geophysical Characteristics of project site, Study of topography and geological settings of the project site, Exploration of cultural heritage site, archaeological places, historical monuments and other ecological sensitive area etc., in and around the project site, Identifying reserve forest, wildlife sanctuaries in and around the project site, Identifying of key performance Indicators of the proposed desilting project, identifying the sensitive receptors in around the project area. Land use/ Land cover study, Visual and digital interpretation of satellite imageries to prepare a map based on spectral/tone/texture homogeneity, including cost of all men, materials,T&Ps used for the study, all lead, lift, transport etc complete.
Conducting Environmental Impact Assessment through Hydro - Meteorology of the project viz., Climate and Weather, Wind speed, Wind Direction, Temperature, Relative Humidity, Rainfall etc. Study on run off, discharge, water availability, flow rate, sedimentation rate and Silt Density Index, Monitoring of Air Environment (SPM - Suspended Particulatte Matter, PM 10, PM 2.5, S02, NO3 and Ammonia), Monitoring of Water Environment of both surface and ground water analysis, Physical parameters (pH, Electrical Conductivity, Total Dissolved Solids (TDS), Chemical parameters (Alkalinity, Hardness, BOD, COD, NO3, PO4, Na, K, Ca, Mg, Silica, Oil and grease, phenolic compounds, residual sodium carbonate), Bacteriological parameters (MPN, Total coliform) and Heavy metals (Pb, As, Hg, Cd, Cr-6, Total Cr, Cu, Zn, Fe), Monitoring of Land Environment- Physical parameters (viz. Texture, Porosity, Hydraulic Conductivity, Bulk Density and Water Holding Capacity) and Chemical parameters (viz. PH, Electrical Conductivity, Magnesium, Calcium, Total Alkalinity, Chlorides, Sodium, Potassium, Organic Carbon, Available Potassium, Available Phosphorus,, SAR, Nitrogen and Salinity) Noise Environment (Noise analysis in the essential locations during day hours and night hours), including cost of all men, materials,T&Ps used for the study, all lead, lift, transport etc complete.
Conducting Social Impact Assessment for Assessment of Socio-economic status in and around the proposed project site (Population, human health, occupational patterns, housing, land holding, business activity, employment, incomes and expenditure, social behavior, castes form a part of this survey. Amenities survey like education, medical facilities, Water supply, sanitation, marketing facilities, transport, roads, banks, post offices also will be collected through secondary data and verified through sample door- to door survey, Analysis of people’s perception of the project and (relocation options, if any are required assistance offered) that will enable them to cope with displacement or loss of livelihoods- temporary or permanent in nature, if any, assessment of the current socio-cultural life style of the tribal/indigenous communities in line with the World Bank’s ESS 7 and ascertain required measures, Assessment of strengths, weaknesses and opportunities for capacity enhancement to address social and gender issues, Preparation of Labour Management Procedure to be followed during project phase, including cost of all men, materials,T&Ps used for the study, all lead, lift, transport etc complete.
Conducting Ecology and Biodiversity Survey, to assess the flora and fauna present in the core zone (3 km radius) and buffer zone (10 km radius) of the project site, to identify the diversity, density, species richness, species evenness, population index, frequency and abundance of flora and fauna, data collection of threatened species, endangered species and critically endangered species in and around the project site, Study of Aquatic ecology (micro invertebrate, zooplankton, phytoplankton, benthos and fish diversity etc., Assessment of species specific legislation ( for Rare, endangered, critically endangered, endemic and vulnerable) to identify designated, habitats and features of ecological significance, including cost of all men, materials,T&Ps used for the study, all lead, lift, transport etc complete.
Preparing Mitigation Measures to identify environmental problem and to find its solution, Identify the measures to protect the physical, biological and human environments. Identify appropriate measure to reduce the health and safety impacts of hazards on workers and vulnerable populations to anticipate and avoid risks and impacts; Minimize or reduce risks and impacts to acceptable levels, if not avoidable; Where significant residual impacts remain, compensate for or offset them, where technically and financially feasible options, to identify differentiated impacts on the disadvantaged or vulnerable and to identify differentiated measures to mitigate such impacts, wherever applicable to assess the relevance and applicability of environmental and social framework, systems, laws, regulations and procedures in the assessment, whenever appropriate and to detail specific actions deemed necessary to assist in mitigating the environmental impact of the project and Preparing Environmental Management Plan, to restrict and regulate the exploitation and utilization of natural resources provide appropriate instructions to Project personnel such as Board staff and contractors about procedures for protecting the environment and minimizing environmental impact, to establish a method of monitoring and environmental management practices, to formulate laws for the implementation of environmental protection and conservation programs, to identify unpredicted impacts and appropriate management Plan, Preparation of following management plans, Pollution Prevention Control Plan, Air Quality Management Plan, Noise, Vibration Management Plan, Water Quality Management Plan, Emergency Response Plan, Vegetation Management Plan, Traffic Management Plan, Waste Management Plan, Dredging, De-Silting & Dumping Management Plan, Archaeological and Heritage Resources Management Plan, Health and Safety Management Plan, Flood Management Plan, Biodiversity Conservation and Sustainable Management Plan, Community / Workers Health and Safety Management Plan, Resettlement Plan if required and Tribal/ Indigenous People Development Plan if required. Interim report, Draft Report and Final Report of EIA study and EMP preparation and submission of one soft copy and 4 hard copies, including cost of all men, materials,T&Ps used for the study, all lead, lift, transport etc complete.
GST for bidders within TamilNadu Note : Bidders within Tamil Nadu shall enter values separately for SGST and CGST and shall enter the value as "Zero" for IGST.
GST for bidders outside TamilNadu Note: Bidders outside Tamil Nadu shall enter value only for IGST and shall enter the value as "Zero" for SGST and CGST .
TERRACON ECOTECH PVT LTD
Egis India Consulting Engineers Pvt. Ltd.
ABC TECHNO LABS INDIA PRIVATE LIMITED
Bidder Name
ABC TECHNO LABS INDIA PRIVATE LIMITED
Enviro Care India Private Limited
TERRACON ECOTECH PVT LTD
Egis India Consulting Engineers Pvt. Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .