Executive Engineer
HPPWD Division Nadaun
C/O Building Portion Including W.S. ,S.I., Rain Water Harvesting Tank, Septic Tank, Site Development, etc.).
2026_PWD_141789_1
NIT No. 5958-97 dated 29-07-2026
Open Tender
Civil Works - Buildings
Percentage
270 days
Nadaun
Please refer Tender documents.
17 documents required · 17 mandatory
₹5,000
₹3.6 L
22 Aug 2026
22 Aug 2026
28 Aug 2026
22 Aug 2026
28 Aug 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains for all kinds of soil and ordinary rocks including dressing of sides and ramming of bottoms upto all lifts including getting out the excavated soil and disposal and transportation of surplus excavated soil / unuseful material for disposing at dumping site( to be arranged by the contractor) within all leads and lifts including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | - | Per Cubic Metre | 209 | - |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 1 | Per Cubic Metre | 1,205.3 | ₹1,204.09 |
| 3 | Centering and shuttering including strutting, propping etcetera and removal of form work Foundations, footings, bases for columns complete upto all floor level including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 1 | Per Square Metre | 243.1 | ₹242.86 |
| 4 | Centering and shuttering including strutting, propping etcetera and removal of form work Suspended floors, roofs, landings, balconies and access plat form complete upto all floor level including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 1 | Per Square Metre | 603.2 | ₹602.6 |
| 5 | Centering and shuttering including strutting, propping etcetera and removal of form work Lintels, beams, plinth beams, girders, bressumers and cantilevers complete upto all floor level including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 1 | Per Square Metre | 489.1 | ₹488.61 |
| 6 | Centering and shuttering including strutting, propping etcetera and removal of form work Stairs, (excluding landings) except spiral staircases complete upto all floor level including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 1 | Per Square Metre | 562.8 | ₹562.24 |
| 7 | Centering and shuttering including strutting, propping etcetera and removal of form work Columns, piers, abutments, pillars, posts and struts complete upto all floor level including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | - | Per Square Metre | 622 | - |
| 8 | Centering and shuttering including strutting, propping etcetera and removal of form work Retaining walls, return walls, walls (any thickness) including attached pilasters,buttresses, plinth and string courses fillets, kerbs and steps etc. complete upto all floor level including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 1 | Per Square Metre | 511.5 | ₹510.99 |
| 9 | Providing and laying in position cement concrete of specified grade 1:4:8 (one cement : four coarse sand : eight graded stone aggregate) 40mm ( forty millimetre) nominal size graded stone aggregate upto plinth level excluding the cost of centering and shuttering including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | - | Per Cubic Metre | 4,353.4 | - |
| 10 | Providing and laying damp-proof course 40mm (Forty millimetre) thick with cement concrete 1:2:4 (One cement : Two coarse sand) : Four graded stone aggregate 20mm (twenty millimetre) nominal size complete including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | - | Per Square Metre | 319.5 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.67 MB
Tendernotice_2.pdf
PDF • 0.49 MB
SBD.pdf
Tender Documents • 5.35 MB
BOQ_210461.xls
BOQ • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].