| # | Company | Rank | Status |
|---|---|---|---|
| 1 | L1Rejected-Finance | L1 | Rejected-Finance Reject |
Tender Value
₹25.9 L
EMD Value
₹52,000
Closing Date
3 Jan 2020, 5:00 pmClosed
Executive Engineer
O/o Executive Engineer, Provisional Division No.1, PWD BnR Branch, Rohtak, Nirman Sadan PWD BnR Office, Ground floor
Pdg. and laying 20MM Thick Premix Carpet on Old DHS road to Bhaini Bharaon road from Km. 0.400 to 4.320 in Rohtak Distt. (Road ID-1829) Re-invited
2019_HRY_112715_2
16934-17234
Open Tender
Civil Works
Item-rate/Agreement basic
180 days
Rohtak
Please refer tender documents.
2 documents required · 2 mandatory
₹5,000
E.E., Provincial Division No.1, PWD BnR Br. Rohtak
₹52,000
Yes
Rohtak
4 Mar 2022
14 Dec 2019
6 Jan 2020
14 Dec 2019
3 Jan 2020
14 Dec 2019
20 Dec 2019
Amount
Milling of distress bituminous layer upto 20mm depth in a single pass with suitable milling machine (capable of milling @ 200-300 sqm area per Hr.) fitted with loading conveyor for loading the milled material directly on the trucks for safe disposal with all leads and lifts complete in all respects. Note: - The quantity of milled bituminous mix material shall be a recovery item as mention in BOQ item No. 7.
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg per sqm. on the prepared bitumen/granular surface cleaned with mechanical broom including cost of bitumen as per clause No. 503 (5th edition) 2013 as per MoRT&H specification (N.S)
Providing and laying 20mm thick premix carpet (PC) excluding cost of tack coat, with mixed material brought from drum type hot mix plant and laying with paver finisher and compacting with road roller to achieve specified value of compaction and direction of Engineer including cost of lighting arrangement, sign board and night watch, complete in all respect. i/c cost of Bitumen VG-10 grade as per clause 510 MoRT&H specification (5th edition) 2013 (NS). Note: - Before carrying out bituminous work, coating & stripping of bitumen aggregate mis is to be performed in accordance with IS-6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti-stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. Note: - Before laying PC on existing black top all cracks shall be sealed as MoRT&H specification (5th edition) clause No. 3004.3 which may consists of (i)Fog seal/or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2 and 3004.3.3 of MoRT&H specification (5th edition) 2013 respectively. Proper measurement and consumption shall be entered in MB for fog seal/or crack filling/ or patch work but no payment on this account shall be made as fog seal/or crack filling/ or patch work is/are incidental to work.
Providing and laying 'B' type seal coat with VG-10 grade bitumen excluding cost of tack coat, with mixed material brought from hot mix plant and laying with paver finisher and compacting with road roller to achieve specified/desirable value of compaction as per direction of Engineer including cost of lighting arrangement, sign board and night watch, complete in all respect as per clause 511 and 510.1.3 of MoRT&H specification (5th edition) 2013 (NS)
Preparation of berms including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift and including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305 and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and other specification 1990 Ist edition. As per X-section attached at DNIT at Section-9. Note: - No earth work will be allowed to be taken from PWD B&R/ROW except for surplus earth after approval from Engineer.
Providing & marking center line/ side line 2.5mm thick (minimum) with hot applied thermo-plastic road marking paint 10 cms wide/15cm wide complete in all respect such as furnishing all labour, materials, tolls equipments including all incidental costs necessary for carrying out in work at site confirming to the technical specification as clause No. 803 of MoRT&H specification for road and bridge works (5th revision) of 2013/ Latest edition. Each container of the thermoplastic material shall have the name trademark or other means of identification of manufacturer, batch number, date of manufacture, color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian Paint-Apcomark/ Berger-Sigmarc/Prismo.The glass beads shall be of Potters/Sovitec/Fleolite. The thermoplastic material shall be sampled and tested in accordance with appropriate ASTM/BS method. The contractor shall furnish to the Engineer – in – charge a copy of certified test reports from the manufacturer of the thermoplastic material meet all requirements of the specifications. The reflector zing Glass beads shall meet the requirement of clause – 803.4.2 and test methods mentioned in clause – 803.4.2.4 shall be meticulously followed. The minimum thickness specified is exclusive of surface of glass beads the method of thickness measurement shall be in accordance with appendix B and C of BS : 3262 (Part – 3). Note: - Before start of work the contractor shall give brand, batch number, manufacturing date of the material to be used along with a photocopy of bill duly signed by the contractor and get approved the same from Engineer-In-Charge before use.
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Materials obtained from dismantling of existing bituminous layer have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- (i) Bituminous mix material @ Rs.1279/- P. Cum. Note: - All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price. Note: - 1)In case of any difference in the unit & nomenclature of any of the HSR items depicted in this DNIT and that given in HSR, the unit and Nomenclature given in HSR shall be applicable. 2) In case of any difference in the unit of any Non-schedule item depicted in this DNIT and the conventional unit of that N.S. item as per practice in this department, the conventional unit as per Practice shall be applicable.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .