Tender Value
₹38.5 L
EMD Value
₹77,500
Closing Date
31 Aug 2026, 6:00 pm2d left
Executive Engineer IFCD Handwara
Irrigation and FC Division Handwara
Anti-Erosion work by way of Gabion crate revertment at RD 16600 m 4200 for length of 86.4 mtrs on R/S at Sultanpora, Gundmomin
2026_IFC_320857_3
10.IFCDHND.2026.27
Open Tender
Civil Works
Percentage
30 days
Executive Engineer IFCD Handwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Chief Engineer Kashmir Irrigation and FloodControl
₹77,500
13 Aug 2026
13 Aug 2026
1 Sept 2026
13 Aug 2026
31 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | 1 | Cum | 256.85 | ₹256.59 |
| 2 | Hand-packing stones in wire crates , excluding cost of crates and stones | - | Cum | 371.15 | - |
| 3 | Extra for every additional lift of 1.5 m or part there of beyond 1.5 m height for hand-packing of stones in wire-crates | - | Cum | 81.4 | - |
| 4 | Supply of stone boulders (Nallah) (Stack measurements reduced by 15%) | - | Cum | 931 | - |
| 5 | Supply of 4mm GI wire crates 4"*4" mesh 16'16' size | - | Kgs | 26 | - |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | - | Cum | 218.4 | - |
| 7Carriage of materials by M/T incld. Loading, unloading and stacking. | |||||
| 7.1 | Nallah Stone boulder by an avg. lead of 7 kms. | - | Cum | 273.02 | - |
| 7.2 | GI wire cratess by an avg lead of 60kms | 1 | MT | 2,270.35 | ₹2,268.08 |
| 8Carriage of materials by Manual means incld. Loading, unloading and stacking.by lead of 50m | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.87 MB
BOQ_1068127.xls
BOQ • 0.31 MB
corr2.pdf
PDF • 0.35 MB
corri.pdf
PDF • 0.41 MB
corri.pdf
PDF • 0.41 MB
corr1.pdf
PDF • 0.47 MB
corr1.pdf
PDF • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].