Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-Finance | ₹2.3 Cr | L1 | Accepted-Finance Lowest Bid |
| 2 | L2₹2.3 Cr+₹17,698.88 (0.08%)Accepted-Finance | ₹2.3 Cr+₹17,698.88 (0.08%) | L2 | Accepted-Finance Higher Bid |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-EMD not submitted |
| Sl No | Description | Qty | Unit | MS LRR ENTERPRISE L1 | M/s Lindum Taying L2 |
|---|---|---|---|---|---|
| 1.00SH:- LAND DEVELOPMENT FOR PLAY GROUND | |||||
| 1.01 | Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. | 7,141.6 | Cum | 316 ₹22,56,745.6 Lowest | 316 ₹22,56,745.6 Lowest |
| 1.02 | Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.) | 12,160.02 | Cum | 450 ₹54,72,009 Lowest | 450 ₹54,72,009 Lowest |
| 2.00SH:- SCHOOL BUILDING a) Building | |||||
| 2.01 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. | 291.43 | Cum | 545.82 ₹1,59,068.32 Lowest | 545.82 ₹1,59,068.32 Lowest |
| 2.02 | Dry rubble Flooring | 101.34 | Cum | 4,125 ₹4,18,027.5 Lowest | 4,125 ₹4,18,027.5 Lowest |
| 2.03 | Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete. | 291.43 | Cum | 247.4 ₹72,099.78 Lowest | 247.4 ₹72,099.78 Lowest |
| 2.04 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 60.43 | Cum | 1,331.22 ₹80,445.62 Lowest | 1,331.22 ₹80,445.62 Lowest |
| 2.05 | Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in:
a) Foundations and plinth | 67.46 | Cum | 8,648.24 ₹5,83,410.27 Lowest | 8,648.24 ₹5,83,410.27 Lowest |
| 2.06 | Providing and laying damp proof course 50 mm thick with cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size). | 41.57 | Sqm | 594 ₹24,692.58 Lowest | 594 ₹24,692.58 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
23 Mar 2026, 9:00 amClosed
Executive Engineer, PWD, Tali Division
Office of the Executive Engineer, PWD, Tali Division
C/o infrastructure Development at KGBV Tali.
2026_PWDAP_3166_1
TD/W-12/EDN/2025-26/03
Open Tender
Civil Works
Item Rate
730 days
Kra Daadi
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Executive Engineer, PWD, Tali Division
₹2.3 L
16 Apr 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SH:- LAND DEVELOPMENT FOR PLAY GROUND | |||||
| 1.01 | Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. | 7,141.6 | Cum | 1.25 | ₹8,927 |
| 1.02 | Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.) | 12,160.02 | Cum | - | - |
| 2SH:- SCHOOL BUILDING a) Building | |||||
| 2.01 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. | 291.43 | Cum | 100 | ₹29,143 |
| 2.02 | Dry rubble Flooring | 101.34 | Cum | 53 | ₹5,371.02 |
| 2.03 | Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete. | 291.43 | Cum | 10 | ₹2,914.3 |
| 2.04 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 60.43 | Cum | 11 | ₹664.73 |
| 2.05 | Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in:
a) Foundations and plinth | 67.46 | Cum | 1.25 | ₹84.32 |
| 2.06 | Providing and laying damp proof course 50 mm thick with cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size). | 41.57 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_3364.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
SBD_KGBV.pdf
Tender Documents • 1.32 MB
BOQ_3364.xls
BOQ • 0.39 MB
Drawing.rar
Additional Documents • 4.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .