| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹2.5 L+₹182.80 (0.07%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | YAMUNA INFRA L1 | S.P BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00 | Desilting the existing drain etc complete as per direction of departmental officers. | 5 | M3 | 112 ₹560 Lowest | 113 ₹565 |
| 2.00 | Dismantling the existing damaged Reinforced Cement Concerete slab etc., complete direction of departmental officers. | 1 | M3 | 4,307 ₹4,307 Lowest | 4,308 ₹4,308 |
| 3.00 | Dismantling the existing damaged Cement Concerete wall etc., complete direction of departmental officers. | 6 | M3 | 485 ₹2,910 Lowest | 486 ₹2,916 |
| 4.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 16 | M3 | 202 ₹3,232 Lowest | 203 ₹3,248 |
| 5.00 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 10 | M3 | 5,337 ₹53,370 Lowest | 5,338 ₹53,380 |
| 6.00Centering with steel centering for revetment, drain and culvert Above 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr (above 4 Feet) | |||||
| 6.01 | Side wall | 61 | M2 | 336 ₹20,496 Lowest | 337 ₹20,557 |
| 6.02 | Culvert | 27 | M2 | 1,268 ₹34,236 Lowest | 1,269 ₹34,263 |
| 7.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 9 | M3 | 6,036 ₹54,324 Lowest | 6,037 ₹54,333 |
| 8.00 | Plastering with cement mortar 1:5(one cement and five sand) 12mm thick in all floors complying with standard specifications. | 10 | M2 | 289 ₹2,890 Lowest | 290 ₹2,900 |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
26 Jun 2025, 3:00 pmClosed
Assistant Commisssioner,West Zone
West Zone, Coimbatore Corporation
Reconstruction of Storm Water Drain and Providing Precast Slab at Maa.Poo.See Street in Ward no 38 of West Zone
2025_MAWS_571307_13
E2/WestZone/2025
Open Tender
Civil Works
Works
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹3,000
15 Oct 2025
20 Jun 2025
27 Jun 2025
20 Jun 2025
26 Jun 2025
20 Jun 2025
Amount
Desilting the existing drain etc complete as per direction of departmental officers.
Dismantling the existing damaged Reinforced Cement Concerete slab etc., complete direction of departmental officers.
Dismantling the existing damaged Cement Concerete wall etc., complete direction of departmental officers.
Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge.
Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification.
Centering with steel centering for revetment, drain and culvert Above 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr (above 4 Feet)
Side wall
Culvert
Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
Plastering with cement mortar 1:5(one cement and five sand) 12mm thick in all floors complying with standard specifications.
Conveying the excavated earth,desilting materials dismantling concrete from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers
Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying etc.
Supply and fixing of 600mm RCC manhole cover with frame SFRC pipe IS 12592
Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete.
Supply of RCC precast slab 100mm thick in C.C. 1:2:4 mix using 20m baby jelly including water curing, moulding charges etc., complete
Fixing Cut Stone Slab / RCC Cover Slab etc complete as per direction of departmental officers.
S.P BUILDERS (BID ID -1381287)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_682903.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .