| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC | ₹9.8 L | L1 | Accepted-AOC For Less Rate is Quated |
| 2 | L2₹9.8 LRejected-AOC | ₹9.8 L | L2 | Rejected-AOC For More Rate is Quated |
| Sl No | Description | Qty | Unit | Durai Builders And Agencies L2 | SELVARAJ K L1 |
|---|---|---|---|---|---|
| 1.01Construction of Public Distribution Shop Building at T.Edaiyar Panchayat | |||||
| 1.02 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations . | 30.56 | m3 | 265 ₹8,098.4 | 263 ₹8,037.28 Lowest |
| 1.03 | Refilling basement with excavated earth other than sand complying the standard specification | 9.39 | m3 | 50 ₹469.5 | 45 ₹422.55 Lowest |
| 1.04 | Filling in basement with M.Sand including and all cost and conveyance to the site and all labour charges for filling to standard specification | 6.15 | m3 | 2,100 ₹12,915 | 2,051 ₹12,613.65 Lowest |
| 1.05 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and Conveyance of all etc. | 6.79 | m3 | 5,790 ₹39,314.1 | 5,781 ₹39,252.99 Lowest |
| 1.06 | Brick work in Cm mix using country bricks ground moulded of size 23x11x7 Cm for the following including curing etc., complete complying with standard specificatons | 4.41 | m3 | 7,050 ₹31,090.5 | 7,016 ₹30,940.56 Lowest |
| 1.07 | Brick work in Cm mix using country bricks ground moulded of size 23x11x7 Cm for the following including curing etc., complete complying with standard specificatons | 14.41 | m3 | 7,120 ₹1,02,599.2 | 7,103 ₹1,02,354.23 Lowest |
| 1.08 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing etc., complete., | 36.51 | m2 | 550 ₹20,080.5 | 547 ₹19,970.97 Lowest |
| 1.09 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing etc., complete., | 90.93 | m2 | 547 ₹49,738.71 Lowest | 547 ₹49,738.71 Lowest |
| 1.10 | Supplying and Fabrication and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete the compolying with standard specification | 1.75 | MT | 91,932 ₹1,60,881 Lowest | 91,932 ₹1,60,881 Lowest |
Tender Value
Refer Docs
EMD Value
₹9,850
Closing Date
6 Aug 2026, 3:00 pmClosed
BDO(BP)
BDO(BP) BDO Office Thiruvennainallur
VPM/TVN/MPLAD/26-27/T.EDAIYAR
2026_RDTN_687263_1
VPM/TVN/MPLAD/26-27/T.EDAIYAR
Open Tender
Civil Works
Works
120 days
Thiruvennainallur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,850
22 Aug 2026
21 Jul 2026
6 Aug 2026
21 Jul 2026
6 Aug 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Construction of Public Distribution Shop Building at T.Edaiyar Panchayat | - | - | - | - |
| 1.02 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations . | 30.56 | m3 | 263.78 | ₹8,061.12 |
| 1.03 | Refilling basement with excavated earth other than sand complying the standard specification | 9.39 | m3 | 45.85 | ₹430.53 |
| 1.04 | Filling in basement with M.Sand including and all cost and conveyance to the site and all labour charges for filling to standard specification | 6.15 | m3 | 2,051.8 | ₹12,618.57 |
| 1.05 | C.C 1:4:8 mix using 40mm ISS HBG metal including cost and Conveyance of all etc. | 6.79 | m3 | 5,781.79 | ₹39,258.35 |
| 1.06 | Brick work in Cm mix using country bricks ground moulded of size 23x11x7 Cm for the following including curing etc., complete complying with standard specificatons | 4.41 | m3 | 7,016.26 | ₹30,941.71 |
| 1.07 | Brick work in Cm mix using country bricks ground moulded of size 23x11x7 Cm for the following including curing etc., complete complying with standard specificatons | 14.41 | m3 | 7,103.05 | ₹1,02,354.95 |
| 1.08 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing etc., complete., | 36.51 | m2 | 547.39 | ₹19,985.21 |
| 1.09 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing etc., complete., | 90.93 | m2 | 547.39 | ₹49,774.17 |
| 1.1 | Supplying and Fabrication and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete the compolying with standard specification | - | MT | 91,932.1 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_826082.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].