| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Original EMD and Hard copy Not submitted |
Tender Value
₹6.6 L
EMD Value
₹6,700
Closing Date
20 Jul 2023, 3:00 pmClosed
Block Development Officer (VP)
BDO Office, Kadayampatti Panchayat Union
Salem District - Kadayampatti Block - Construction of 50 meters of cement road and 50 meters of Compound Wall at Samatthu Burial ground in Kalarkadu H/O Deevattipatti Panchayat. - AGAMT - II 2023-2024 Work No.05
2023_RDTN_334897_5
Roc.No.427/2023/T1
Open Tender
Civil Works
Item Wise
120 days
BDO Office, Kadayampatti Panchayat Union
As per tender Document
3 documents required · 3 mandatory
₹0
₹6,700
4 Aug 2023
3 Jul 2023
20 Jul 2023
3 Jul 2023
20 Jul 2023
3 Jul 2023
Amount
Construction of 50 meters of cement road and 50 meters of Compound Wall at Samatthu Burial ground in Kalarkadu H/O Deevattipatti Panchayat.
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erecting shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footings, column, pedestals, plinth beam, grade beams, raft slabs, staircase steps, bed blocks, critical pier etc.
Bellow ground level
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Provision for Bitumen pad
Compound wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erecting shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footings, column, pedestals, plinth beam, grade beams, raft slabs, staircase steps, bed blocks, critical pier etc.
Bellow ground level
Above ground level
Supplying fabricating and placing in position mild steel or nibbled for steel for all reinforced cement concrete works as per the desing given including cost of steel and binding wire in all floors etc. complete complying with standard specification (MS rods or RTS bars will be supplied department sally at section stores and cost will be recovered at issue rate). The binding wire shall be supplied by the Contractor.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"and conveyance of all materials to site and all labour charges etc complete
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Periyasamy P
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .