| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹23.3 L+₹1.8 L (8.42%)Admitted-Finance 25 1ST FLOOR TRIVENI SANGAM BLDG BHAWANI SHANKAR ROAD DADAR WEST MUMBAI MAHARASHTRA 400028 | MUMBAI | MAHARASHTRA | 400028 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Purva Engineers & Contractors L2 | K J ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Annual cleaning, inspection and Certification for use of Boilers MR-9900 and MR-13842: The work includes isolation of steam circuit & flue gas ducting, dismantling of boiler mountings & doors, Internal & external mechanical cleaning of carbon soot & scale, Descaling/ Chemical cleaning of water drum of boiler, replacement of asbestos rope of doors, overhauling, lapping & hydro testing of all IBR approved valves, payment of IBR fees, Hydro testing and inspection of boilers from IBR competent authority & obtaining the “Certificate for use of Boilers", refitting/ reassembly of mountings & doors, refractory work of boilers, box-up work of the boilers and disposal of removed carbon soot.
All consumables & materials required for completion of work such as asbestos rope, lapping paste, bags for packing of carbon soot, descaling chemical, refractory materials, industrial safety wears for workers, etc. are under the scope of contractor. | 2 | No. | 3,25,000 ₹6,50,000 | 2,57,625 ₹5,15,250 Lowest |
| 2.00 | Bare inspection and Certification for use of Boilers MR-9836 and MR-13841:
The work includes removal of existing insulation from steam boiler & safe disposal, isolation of steam circuit & flue gas ducting, dismantling of boiler mountings & doors, Internal & external mechanical cleaning of carbon soot & scale, Descaling/ Chemical cleaning of water drum of boiler, replacement of asbestos rope of doors, overhauling, lapping & hydro testing of all IBR approved valves, Cleaning of entire boiler surface from outside, thickness measurement of boiler by UT test for shell, furnace, reversing chamber, front & back tube sheet as per IBR guidelines for BARE inspection and LPT of all butt & fillet weld joints on the boiler shell, nozzles, furnace & tube sheet joints with shell and submitting report to the IBR competent authority, payment of IBR fees, Offering of boilers for bare inspection and Hydro testing to IBR competent authority & obtaining the “Certificate for use of Boilers".
Painting of entire surface with black antirust paint and heat resistant paint. 100 MM thick Thermal insulation of LRB/ Rockwool , GI wire-22G, Self-taping screw, parker, cladding of Aluminum sheet-22G, refitting/ reassembly of mountings & doors, refractory work of boilers, box-up work of the boilers and disposal of removed carbon soot.
All consumables & materials required for completion of work such as UT instrument, LPT materials, heat resistant primer, paint, Insulation material, GI wire, aluminum sheet, screw, asbestos rope, lapping paste, bags for packing of removed insulation & carbon soot, descaling chemical, refractory materials, industrial safety wears for workers, etc. are under the scope of contractor. | 2 | No. | 8,15,000 ₹16,30,000 | 8,00,000 ₹16,00,000 Lowest |
| 3.00 | Calibration steam pressure gauge and approval from IBR Authority. | 4 | No. | 12,000 ₹48,000 | 8,000 ₹32,000 Lowest |
Tender Value
₹20.4 L
EMD Value
₹40,900
Closing Date
21 Apr 2025, 5:00 pmClosed
GM RWM INRPO
NRB BARC Tarapur
Bare inspection and annual inspection of steam boilers at RP Boiler House, NRB, BARC, Tarapur.
2025_NRB_854902_1
BARC(T)/RWM/RP/ Mech/U/BH/2024/379
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
300 days
NRB BARC Tarapur
As per tender
8 documents required · 8 mandatory
₹0
₹40,900
Yes
WIP Conferrance room
7 Aug 2025
28 Mar 2025
23 Apr 2025
2 Apr 2025
21 Apr 2025
10 Apr 2025
8 Apr 2025
Amount
Annual cleaning, inspection and Certification for use of Boilers MR-9900 and MR-13842: The work includes isolation of steam circuit & flue gas ducting, dismantling of boiler mountings & doors, Internal & external mechanical cleaning of carbon soot & scale, Descaling/ Chemical cleaning of water drum of boiler, replacement of asbestos rope of doors, overhauling, lapping & hydro testing of all IBR approved valves, payment of IBR fees, Hydro testing and inspection of boilers from IBR competent authority & obtaining the “Certificate for use of Boilers", refitting/ reassembly of mountings & doors, refractory work of boilers, box-up work of the boilers and disposal of removed carbon soot. All consumables & materials required for completion of work such as asbestos rope, lapping paste, bags for packing of carbon soot, descaling chemical, refractory materials, industrial safety wears for workers, etc. are under the scope of contractor.
Bare inspection and Certification for use of Boilers MR-9836 and MR-13841: The work includes removal of existing insulation from steam boiler & safe disposal, isolation of steam circuit & flue gas ducting, dismantling of boiler mountings & doors, Internal & external mechanical cleaning of carbon soot & scale, Descaling/ Chemical cleaning of water drum of boiler, replacement of asbestos rope of doors, overhauling, lapping & hydro testing of all IBR approved valves, Cleaning of entire boiler surface from outside, thickness measurement of boiler by UT test for shell, furnace, reversing chamber, front & back tube sheet as per IBR guidelines for BARE inspection and LPT of all butt & fillet weld joints on the boiler shell, nozzles, furnace & tube sheet joints with shell and submitting report to the IBR competent authority, payment of IBR fees, Offering of boilers for bare inspection and Hydro testing to IBR competent authority & obtaining the “Certificate for use of Boilers". Painting of entire surface with black antirust paint and heat resistant paint. 100 MM thick Thermal insulation of LRB/ Rockwool , GI wire-22G, Self-taping screw, parker, cladding of Aluminum sheet-22G, refitting/ reassembly of mountings & doors, refractory work of boilers, box-up work of the boilers and disposal of removed carbon soot. All consumables & materials required for completion of work such as UT instrument, LPT materials, heat resistant primer, paint, Insulation material, GI wire, aluminum sheet, screw, asbestos rope, lapping paste, bags for packing of removed insulation & carbon soot, descaling chemical, refractory materials, industrial safety wears for workers, etc. are under the scope of contractor.
Calibration steam pressure gauge and approval from IBR Authority.
Purva Engineers & Contractors (BID ID -3203662)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .