Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹2.0 L+₹3,876.68 (2.00%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹2.0 L+₹7,830.89 (4.04%)Admitted-Finance VILL P O AMJAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713203 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | F.R. ENTERPRISE L3 | N.K. ENTERPRISE L1 | K R ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.01 | Cutting of (a) 4 nos. ISMB-200 girder of length 1.2mtr., (b) 4 nos. ISMB-200 girder of length 250mm, (c ) 3 nos. ISMC 125x65x6 channel of length 1.35 mtr. and (d) 12mm MS plate for base welding-5 nos., for block adjustment-2 nos., for ribs making 16 nos. with DA and Oxygen supplied by the contractor | 1 | WORK | 19,101.74 ₹19,101.74 | 18,360 ₹18,360 Lowest | 18,727.2 ₹18,727.2 |
| 1.02 | Fabrication of 01 no. discharge drum suitable for 1200mm wide belt conveyor with above steel materials and cutting proper size, fixing and assembling of all the components by welding, cutting holes and fixing with necessary nut & bolts etc at surface | 1 | WORK | 37,604.22 ₹37,604.22 | 36,144 ₹36,144 Lowest | 36,866.88 ₹36,866.88 |
| 1.03 | Transportation of the discharge drum complete assembly at the site of Link belt and fixing the complete assembly excluding discharge drum at the final location of the drum by welding, cutting holes and fixing with necessary nut & bolts etc. at surface | 1 | WORK | 25,645.86 ₹25,645.86 | 24,650 ₹24,650 Lowest | 25,143 ₹25,143 |
| 1.04 | Making 3 nos. clamp of the Link belt, cutting the belt near final discharge point, transportation and fitting of the discharge drum on the base frame, joining the belting and removing the clamps | 1 | WORK | 54,475.34 ₹54,475.34 | 52,360 ₹52,360 Lowest | 53,407.2 ₹53,407.2 |
| 1.05 | Dismantling of discharge drum assembly from existing position before dismantling of the complete structure | 1 | WORK | 25,677.07 ₹25,677.07 | 24,680 ₹24,680 Lowest | 25,173.6 ₹25,173.6 |
| 1.06 | Removing of 36 mtr. 1200mm belting and transporting it to area store with the help of dumper and crane | 1 | WORK | 10,216.73 ₹10,216.73 | 9,820 ₹9,820 Lowest | 10,016.4 ₹10,016.4 |
| 1.07 | Removing of 18 mtr. 1200mm structures and transporting it to area store with the help of dumper and crane | 1 | WORK | 6,575.33 ₹6,575.33 | 6,320 ₹6,320 Lowest | 6,446.4 ₹6,446.4 |
| 1.08 | Supply of oxygen cylinder | 2 | NO | 416.16 ₹832.32 | 400 ₹800 Lowest | 408 ₹816 |
| 1.09 | Supply of DA cylinder | 6 | NO | 3,589.38 ₹21,536.28 | 3,450 ₹20,700 Lowest | 3,519 ₹21,114 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹2.3 L
EMD Value
₹2,900
Closing Date
19 Sept 2025, 11:00 amClosed
AREA ENGINEER EnM
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
Shortening of discharge drum and structures of Link belt conveyor for a length of approx.18 mtr. at MIC, J.P.Colly
2025_ECL_343386_1
ECL/GM/JNR/EnM/A2/25-26/64 dated 01.09.2025
Open Tender
Miscellaneous Works
Item Rate
15 days
JHANJRA UNDERGROUND
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,900
13 Oct 2025
8 Sept 2025
20 Sept 2025
8 Sept 2025
19 Sept 2025
9 Sept 2025
8 Sept 2025 - 15 Sept 2025
Amount
Cutting of (a) 4 nos. ISMB-200 girder of length 1.2mtr., (b) 4 nos. ISMB-200 girder of length 250mm, (c ) 3 nos. ISMC 125x65x6 channel of length 1.35 mtr. and (d) 12mm MS plate for base welding-5 nos., for block adjustment-2 nos., for ribs making 16 nos. with DA and Oxygen supplied by the contractor
Fabrication of 01 no. discharge drum suitable for 1200mm wide belt conveyor with above steel materials and cutting proper size, fixing and assembling of all the components by welding, cutting holes and fixing with necessary nut & bolts etc at surface
Transportation of the discharge drum complete assembly at the site of Link belt and fixing the complete assembly excluding discharge drum at the final location of the drum by welding, cutting holes and fixing with necessary nut & bolts etc. at surface
Making 3 nos. clamp of the Link belt, cutting the belt near final discharge point, transportation and fitting of the discharge drum on the base frame, joining the belting and removing the clamps
Dismantling of discharge drum assembly from existing position before dismantling of the complete structure
Removing of 36 mtr. 1200mm belting and transporting it to area store with the help of dumper and crane
Removing of 18 mtr. 1200mm structures and transporting it to area store with the help of dumper and crane
Supply of oxygen cylinder
Supply of DA cylinder
Total impact of GST for the purpose of CTC
K R ENTERPRISE (BID ID -1183489)
F.R. ENTERPRISE (BID ID -1183480)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .