Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-Finance 1008 A PREMIER ENGINEERING COMPANY PURVI RITHANI MEERUT DELHI ROAD MEERUT UTTAR PRADESH 250103 INDIA | MEERUT | UTTAR PRADESH | 250103 | L1 | Accepted-Finance OK | |
| 2 | L2₹6.2 L+₹27,883.40 (4.73%)Accepted-Finance PROP NO A 80 FIRST FLOOR FLAT NO 3 CHATTAR PUR ENCLAVE PHASE 2 NEW DELHI SOUTH WEST DELHI DELHI 110074 | SOUTH DELHI | DELHI | 110074 | L2 | Accepted-Finance Ok |
| Sl No | Description | Qty | Unit | M G Traders and Engineers L2 | Premier Engineering Company L1 |
|---|---|---|---|---|---|
| 1.01 | Dismantling of defective capacitor units from the APFC panel after suitably discharging the left-over charge on capacitors to ensure safety of the working persons along with dismantling of Capacitors, APFC relay, indications lights, meters, A/M switches, MCCBs including dismantling of terminations and existing hardware and rusted parts and various other items requiring change in the panel as required at site. | 4 | Job | 91,200 ₹1,07,616 | 90,000 ₹1,06,200 Lowest |
| 1.02 | Replacement of defective Super Heavy Duty Capacitor units of various capacities with new capacitor units, rated at 440 V, 3 phase, 50 Hz system complete with terminal cover, cable end entry, mounting structure and hardware etc. -Make Standard | 180 | KVAr | 73,800 ₹87,084 | 66,600 ₹78,588 Lowest |
| 1.03 | Banking of capacitors of various capacities with multistrand copper wires & lugs /aluminium bus bars and mounting arrangement for parallel connection to form suitable rating capacitor bank. | 180 | KVAr | 17,100 ₹20,178 | 15,300 ₹18,054 Lowest |
| 1.04 | Replacement of defective APFC relay, with new microprocessor based APFC Relay having digital display of power factor and other parameters to sense power factor through control CT and give phased impulses to contactor coils for switching ON-OFF required number of capacitors as per requirement to achieve target power factor. Make Standard | 2 | No. | 49,600 ₹58,528 | 49,300 ₹58,174 Lowest |
| 1.05 | Programming of APFC relay for target power factor including setting of various parameters and keeping updated indications of the efficiency of electrical power usage, and improving it for reducing the power losses and avoid penalties from utility companies. | 2 | Job | 31,000 ₹36,580 | 30,000 ₹35,400 Lowest |
| 1.06 | Replacement of defective capacitor duty contactors suitable for 25 KVAr capacitor with new capacitor duty contactor. Make Standard/EPCOS | 4 | No. | 20,800 ₹24,544 | 19,500 ₹23,010 Lowest |
| 1.07 | Replacement of defective capacitor duty contactors suitable for 16 KVAr capacitor with new capacitor duty contactor. Make Standard/EPCOS | 4 | No. | 18,000 ₹21,240 | 17,000 ₹20,060 Lowest |
| 1.08 | Replacement of defective triple pole MCB of 63 A capacity with new MCB for operation and safety of individual capacitor bank - make L&T/EPCOS/Standard | 6 | No. | 15,300 ₹18,054 | 15,000 ₹17,700 Lowest |
| 1.09 | Replacement of defective triple pole MCB of 32 A capacity with new MCB for operation and safety of individual capacitor bank - make L&T/EPCOS/Standard | 3 | No. | 4,650 ₹5,487 | 4,500 ₹5,310 Lowest |
| 1.10 | Supply of Push buttons for replacement of defective push buttons to switch ON and OFF capacitor banks in manual mode- make FTC/Standard/L&T | 2 | No. | 960 ₹1,132.8 | 900 ₹1,062 Lowest |
Tender Value
₹6.0 L
EMD Value
₹12,000
Closing Date
20 Jan 2026, 3:00 pmClosed
EE(E and M)M-10
Command tank 1, SFS Flats, Dwarka Sector 7
Renovation Servicing of standard make power factor correction system installed at daulatpur BPS under AC 34
2026_DJB_284892_18
NIT NO. 23 (2025-26)/EE(EnM)M-10
Open Tender
Miscellaneous Works
Works
Office of Ex. Engineer(E and M)M-10
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Account No SB 06121000095461
₹12,000
19 Mar 2026
14 Jan 2026
20 Jan 2026
14 Jan 2026
20 Jan 2026
14 Jan 2026
Dismantling of defective capacitor units from the APFC panel after suitably discharging the left-over charge on capacitors to ensure safety of the working persons along with dismantling of Capacitors, APFC relay, indications lights, meters, A/M switches, MCCBs including dismantling of terminations and existing hardware and rusted parts and various other items requiring change in the panel as required at site.
Replacement of defective Super Heavy Duty Capacitor units of various capacities with new capacitor units, rated at 440 V, 3 phase, 50 Hz system complete with terminal cover, cable end entry, mounting structure and hardware etc. -Make Standard
Banking of capacitors of various capacities with multistrand copper wires & lugs /aluminium bus bars and mounting arrangement for parallel connection to form suitable rating capacitor bank.
Replacement of defective APFC relay, with new microprocessor based APFC Relay having digital display of power factor and other parameters to sense power factor through control CT and give phased impulses to contactor coils for switching ON-OFF required number of capacitors as per requirement to achieve target power factor. Make Standard
Programming of APFC relay for target power factor including setting of various parameters and keeping updated indications of the efficiency of electrical power usage, and improving it for reducing the power losses and avoid penalties from utility companies.
Replacement of defective capacitor duty contactors suitable for 25 KVAr capacitor with new capacitor duty contactor. Make Standard/EPCOS
Replacement of defective capacitor duty contactors suitable for 16 KVAr capacitor with new capacitor duty contactor. Make Standard/EPCOS
Replacement of defective triple pole MCB of 63 A capacity with new MCB for operation and safety of individual capacitor bank - make L&T/EPCOS/Standard
Replacement of defective triple pole MCB of 32 A capacity with new MCB for operation and safety of individual capacitor bank - make L&T/EPCOS/Standard
Supply of Push buttons for replacement of defective push buttons to switch ON and OFF capacitor banks in manual mode- make FTC/Standard/L&T
Replacement of defective/burnt out LED indication lights of various colours with new indication lights, make -Standard/L&T
Power wiring with 10 sq. mm multistrand copper wires for connection between capacitors and bus bar using copper lugs and necessary hardware etc. as required at site.
Installation of all above components in the existing capacitor banks with suitable fabrication work to accommodate new items in the existing enclosure / structure for alignment of components and ease of termination, complete with hardware on the mounting structure and termination of existing cables with lugs, tapes etc. complete with earthing of the capacitor banks, touching the rusted parts of the panel structure with paint for protection from moisture etc. as required at site
Servicing of APFC panels including complete dusting of the panel, cleaning of contact points, Decarbonising of joints, alignment of doors, checking of all nuts & bolts, control circuit and power circuit wiring dressing and renovation of control and power terminations etc. as required at site
Testing & Commissioning of complete APFC Panel installation including following: 01. Meggering of complete capacitor installation using 500V megger 02. Continuity test for checking continuity of all circuits to ensure that all circuits are properly wired. 03. Checking function and efficiency of various components of APFC panel
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
nit23.pdf
Tender Documents • 1.29 MB
BOQ_376884.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .