Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.9 Cr+₹5.6 L (2.99%)Admitted-Finance | ₹1.9 Cr+₹5.6 L (2.99%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹14.8 L (7.87%)Admitted-Finance | ₹2.0 Cr+₹14.8 L (7.87%) | L3 | Admitted-Finance |
| 4 | L4₹2.1 Cr+₹23.2 L (12.3%)Admitted-Finance 51 PG ENCLAVE OPP SILVER OAK HOTEL PATEL NAGAR CITY CENTRE GWALIOR M P | GWALIOR | GWALIOR | MADHYA PRADESH | ₹2.1 Cr+₹23.2 L (12.3%) | L4 | Admitted-Finance |
| 5 | L5₹2.2 Cr+₹35.2 L (18.7%)Admitted-Finance | ₹2.2 Cr+₹35.2 L (18.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MSV INTERNATIONAL INC L7 | AICONS Engineering Pvt. Ltd. L11 | G-Eng Advisory Services Pvt. Ltd. L5 | L N MALVIYA INFRA PROJECTS PVT LTD L6 | Geo Designs and Reserch Pvt. Ltd. L10 | Planning & Infrastructural Development Consultants Pvt. Ltd. L2 | Thoughts Consultants Jaipur Pvt Ltd L1 | Technocrats Advisory Services Pvt. Ltd. L9 | Sterling Indo Tech Consultants Pvt Ltd. L12 | GLOBAL INFRA SOLUTIONS L3 | Almondz Global Infra Consultant Limited L8 | M/s Engineering Consultancy Services L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Key Personnel ( Construction + Maintance Period) | |||||||||||||||
| 1.01 | Team Leader Cum Senior Highway Engineer | 20 | Month | 1,00,000 ₹20,00,000 | 2,00,000 ₹40,00,000 | 1,50,000 ₹30,00,000 | 1,40,000 ₹28,00,000 | 1,15,000 ₹23,00,000 | 1,40,000 ₹28,00,000 | 1,10,000 ₹22,00,000 | 1,25,000 ₹25,00,000 | 1,75,000 ₹35,00,000 | 80,000 ₹16,00,000 Lowest | 1,00,000 ₹20,00,000 | 95,000 ₹19,00,000 |
| 1.02 | Resident cum Highway Engineer | 30 | Month | 1,00,000 ₹30,00,000 | 1,50,000 ₹45,00,000 | 1,10,000 ₹33,00,000 | 1,10,000 ₹33,00,000 | 1,00,000 ₹30,00,000 | 1,00,000 ₹30,00,000 | 80,000 ₹24,00,000 Lowest | 1,20,000 ₹36,00,000 | 1,25,000 ₹37,50,000 | 80,000 ₹24,00,000 Lowest | 80,000 ₹24,00,000 Lowest | 95,000 ₹28,50,000 |
| 1.03 | Bridge/Structural Engineer | 20 | Month | 1,00,000 ₹20,00,000 | 1,40,000 ₹28,00,000 | 1,05,000 ₹21,00,000 | 1,20,000 ₹24,00,000 | 1,15,000 ₹23,00,000 | 1,20,000 ₹24,00,000 | 70,000 ₹14,00,000 Lowest | 1,00,000 ₹20,00,000 | 1,55,000 ₹31,00,000 | 80,000 ₹16,00,000 | 80,000 ₹16,00,000 | 95,000 ₹19,00,000 |
| 1.04 | Senior Payment Specialist | 18 | Month | 1,00,000 ₹18,00,000 | 1,40,000 ₹25,20,000 | 1,10,000 ₹19,80,000 | 1,20,000 ₹21,60,000 | 1,25,000 ₹22,50,000 | 70,000 ₹12,60,000 Lowest | 70,000 ₹12,60,000 Lowest | 1,00,000 ₹18,00,000 | 1,25,000 ₹22,50,000 | 80,000 ₹14,40,000 | 1,00,000 ₹18,00,000 | 85,000 ₹15,30,000 |
| 1.05 | Senior Quality cum Material Expert | 18 | Month | 1,00,000 ₹18,00,000 | 1,50,000 ₹27,00,000 | 1,05,000 ₹18,90,000 | 1,00,000 ₹18,00,000 | 1,15,000 ₹20,70,000 | 1,00,000 ₹18,00,000 | 70,000 ₹12,60,000 Lowest | 1,00,000 ₹18,00,000 | 1,30,000 ₹23,40,000 | 70,000 ₹12,60,000 Lowest | 80,000 ₹14,40,000 | 85,000 ₹15,30,000 |
| 1.06 | Road Safety Expert | 7 | Month | 50,000 ₹3,50,000 Lowest | 1,10,000 ₹7,70,000 | 80,000 ₹5,60,000 | 50,000 ₹3,50,000 Lowest | 1,50,000 ₹10,50,000 | 50,000 ₹3,50,000 Lowest | 70,000 ₹4,90,000 | 50,000 ₹3,50,000 Lowest | 75,000 ₹5,25,000 | 70,000 ₹4,90,000 | 80,000 ₹5,60,000 | 50,000 ₹3,50,000 Lowest |
| 1.07 | Senior Constract Specialist | 4 | Month | 50,000 ₹2,00,000 | 1,20,000 ₹4,80,000 | 80,000 ₹3,20,000 | 50,000 ₹2,00,000 | 75,000 ₹3,00,000 | 30,000 ₹1,20,000 Lowest | 50,000 ₹2,00,000 | 50,000 ₹2,00,000 | 75,000 ₹3,00,000 | 70,000 ₹2,80,000 | 80,000 ₹3,20,000 | 50,000 ₹2,00,000 |
| 2.00Sub Professional Staff ( Construction + Maintance Period) | |||||||||||||||
| 2.01 | Survey Engineer | 21 | Month | 50,000 ₹10,50,000 | 50,000 ₹10,50,000 | 35,000 ₹7,35,000 | 40,000 ₹8,40,000 | 95,000 ₹19,95,000 | 42,000 ₹8,82,000 | 25,000 ₹5,25,000 Lowest | 75,000 ₹15,75,000 | 65,000 ₹13,65,000 | 35,000 ₹7,35,000 | 55,000 ₹11,55,000 | 70,000 ₹14,70,000 |
Tender Value
₹2.4 Cr
EMD Value
₹2.4 L
Closing Date
11 Aug 2023, 5:30 pmClosed
Executive Engineer N.H. Division, Solapur
Executive Enineer N.H. Division, Saat Rasta Solapur
Consultancy services for authoritys engineer for supervision of rehabilitation and upgradation to 2 lanes with paved shoulder configuration of Mahud Sangola of NH 965G from km 159.400 to 161.900 and 162.400 to 183.960 km design from km 32.300 to km
2023_MoRTH_749936_1
No. / NHD /TC/873/ 2023
Open Tender
Civil Works
EPC Contract
540 days
solapur
Please refer Tender Documents
8 documents required · 8 mandatory
₹5,900
GM MoRTH
₹2.4 L
Chief Engineer N.H. Mumbai
22 Nov 2023
21 Apr 2023
14 Aug 2023
21 Apr 2023
11 Aug 2023
21 Apr 2023
18 May 2023
Amount
Key Personnel ( Construction + Maintance Period)
Team Leader Cum Senior Highway Engineer
Resident cum Highway Engineer
Bridge/Structural Engineer
Senior Payment Specialist
Senior Quality cum Material Expert
Road Safety Expert
Senior Constract Specialist
Sub Professional Staff ( Construction + Maintance Period)
Survey Engineer
Highway Design Engineer
Assistant Highway Engineer
CAD Expert
Environmental Engineer
Bridge Design Engineer
Assistant Bridge Engineer
Assistant Quality cum Material Engineer
Electrical Utility Shifting Engineer
HTMS/ TOll Expert
Quantity Engineer
Water Utility Shifting Engineer
Support Staff ( Construction + Maintance Period)
Office Manager
Accountant cum Cashier
Steno cum Computer Operator
Office Boy
Transportation ( Construction + Maintance Period)
Innova or Equivalent
Ertiga or equivalent
Duty Travel to Site (Fixed Costs)
Site to CE-RO, MoRTH, Office for Professional & Sub Professional Staff
Site to State PWD Office for for Professional & Sub Professional Staff
Office Rent (Fixed Costs)
Office Rent (Construction Period)
Office Rent (Maintanance Period)
Office Supplies, Utilities and Communication (Fixed Costs) ( Construction + Maintance Period)
Office Supplies
Drafting Supplies
Computer Running Costs
Office Furniture and Equipment (Rental) (Brand new Furniture and Equipment shall be mandatory at the time of commencement of services as per the list given below. The rental rate per month shall be quoted for the total list of Office Furniture and Equipment) For Construction Period :
Executive Table (5 Nos. x 18 Months)
Executive Chairs (10 Nos. x 18 Months)
Visitor Chairs (10 Nos. x 18 Months)
Steel Almirahs (8 Nos. x 18 Months)
Computer Furniture (2 Nos. x 18 Months)
Conference Table (1 Nos. x 18 Months)
Telephone (1 Nos. x 18 Months)
Photocopier (15ppm, 12000 copies per month with A3 & A4 input) (1 Nos. x 18 Months)
Personnel Computers : 5 No., Intel Core i5, 24’’ Monitor, RAM-8 GB, SSD- 512 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows, pre-loaded anti-virus etc. with internet facility. (2 Nos. x 18 Months)
Laser printers: 2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., (2 Nos. x 18 Months)
Engineering Plan printer (1 Nos. X 18 Months)
Binding Machine (1 Nos. X 18 Months)
Plotter A0 Size (1 Nos. X 18 Months)
Overhead Projector (1 Nos. X 18 Months)
Air Conditioners 1.5 Tonne (2 Nos. X 18 Months)
Water Coolers (2 Nos. X 18 Months)
Office Furniture and Equipment (Rental) (Brand new Furniture and Equipment shall be mandatory at the time of commencement of services as per the list given below. The rental rate per month shall be quoted for the total list of Office Furniture and Equipment) For Maintenance Period :
Executive Table (5 Nos. x 12 Months)
Executive Chairs (10 Nos. x 12 Months)
Visitor Chairs (10 Nos. x 12 Months)
Steel Almirahs (8 Nos. x 12 Months)
Computer Furniture (2 Nos. x 12 Months)
Conference Table (1 Nos. x 12 Months)
Telephone (1 Nos. x 12 Months)
Photocopier (15ppm, 12000 copies per month with A3 & A4 input) (1 Nos. x 12 Months)
Personnel Computers : Intel Core i5, 24’’ Monitor, RAM-8 GB, SSD- 512 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows, pre-loaded anti-virus etc. with internet facility. (2 Nos. x 12 Months)
Laser printers: 2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., (2 Nos. x 12 Months)
Binding Machine (1 Nos. X 12 Months)
Plotter A0 Size (1 Nos. X 12 Months)
Overhead Projector (1 Nos. X 12 Months)
Air Conditioners 1.5 Tonne (2 Nos. X 12 Months)
Water Coolers (2 Nos. X 12 Months)
Reports & Documents Printing: Construction + Maintance Period
Monthly reports: Design and Construction (5 Copies X 30 Months)
Half yearly Reports: (5 Copies X 5 Months)
Various others reports as provided in the Concession Agreement such as Completion Report (12 Copies X 5 Months)
Road Survey Equipment: Construction Period
Survey Equipment (GPS/Total station /Auto Level) with semiskilled survey Party (4 persons) and one dedicated vehicle for Survey Party (inclusive of vehicle rental driver’s salary, fuel operation and maintenance etc complete) with rods, flags and other sundries
Road Survey Equipment: Maintance PEriod
Survey Equipment (GPS/Total station /Auto Level) with semiskilled survey Party (4 persons) and one dedicated vehicle for Survey Party (inclusive of vehicle rental driver’s salary, fuel operation and maintenance etc complete) with rods, flags and other sundries
Contingencies: A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval from the Competent Authority in Chief Engineer cum Regional Officer, MoRTH, Government of India, Maharashtra.
Planning & Infrastructural Development Consultants Pvt. Ltd.
GLOBAL INFRA SOLUTIONS
M/s Engineering Consultancy Services
G-Eng Advisory Services Pvt. Ltd.
L N MALVIYA INFRA PROJECTS PVT LTD
MSV INTERNATIONAL INC
Almondz Global Infra Consultant Limited
Technocrats Advisory Services Pvt. Ltd.
Geo Designs and Reserch Pvt. Ltd.
AICONS Engineering Pvt. Ltd.
Sterling Indo Tech Consultants Pvt Ltd.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.68 MB
RFP.pdf
Tender Documents • 4.36 MB
Bharatkosh.pdf
Tender Documents • 0.39 MB
BOQ_788454.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .