Tender Value
₹24.4 L
EMD Value
₹49,000
Closing Date
17 Jun 2026, 2:00 pm
Executive Officer
Nagar Panchayat Bundu
Construction of Ghat shed and Renovation work of Ghat at Arradih River Bundu Jharkhand
2026_UDD_114705_1
UDD/NIT/BNP/Ghat Shed/ 02/2026-27
Open Tender
Civil Works
90 days
Bundu
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹49,000
2 Jun 2026
2 Jun 2026
18 Jun 2026
2 Jun 2026
17 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. + (Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B) | 98.61 | m3 | 167.33 | ₹16,500.41 | BI01010001010000000000000515BI0100001113 |
| 2 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 25.98 | m3 | 589.51 | ₹15,315.47 | BI01010001010000000000000515BI0100001114 |
| 3 | Supplying and Laying (properly as per design and drawing) rip-rap with good quality of boulder duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete job. | 12.59 | m3 | 1,756.4 | ₹22,113.08 | BI01010001010000000000000515BI0100001115 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 5.05 | m3 | 4,598.23 | ₹23,221.06 | BI01010001010000000000000515BI0100001116 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | 7.21 | m3 | 4,961.73 | ₹35,774.07 | BI01010001010000000000000515BI0100001117 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 10.36 | m3 | 5,218 | ₹54,058.48 | BI01010001010000000000000515BI0100001118 |
| 7 | Providing Tor steel reinforcement of 8mm dia rods as per approved design and drawing exclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. TMT Fe 500 (only valid for SAIL & TATA STEEL) #8mm | 0.41 | MT | 83,314.02 | ₹34,158.75 | BI01010001010000000000000515BI0100001119 |
| 8 | #10mm | 0.62 | MT | 80,879.07 | ₹50,145.02 | BI01010001010000000000000515BI0100001121 |
| 9 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,561.77 | kg | 85.22 | ₹1,33,094.04 | BI01010001010000000000000515BI0100001122 |
| 10 | Labour for fabricating, erecting, hoistion and fixing in position structrral steel work in R.S. Joist, channel, Angle, Tee, flat, plate, latice member, built up compound section in column, girder, stair case, or truss including cost of gusset plates, holding down bolts, anchor plates at all heights and depths, bolting, welding ( machining wherever necessary) with applying a priming coat of red lead paint all complete as per approved drawing, building specification and direction of E/I. | 1.56 | MT | 25,679.88 | ₹40,060.61 | BI01010001010000000000000515BI0100001123 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
TechnicalBid.pdf
Tender Documents • 0.87 MB