Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1 L
Closing Date
16 Nov 2021, 4:00 pmClosed
Er Rajesh Sumbria
Executive Engineer PWD R and B Division Basohli
Please refer in BOQ
2021_PWDJK_141982_10
e-NIT No.49 of 2021-22 dated 28-09-2021
Open Tender
Civil Works
Item Rate
60 days
Basohli
Please refer Tender documents.
5 documents required · 5 mandatory
₹600
Yes
e-NIT No. Dt. Work and name of contr. is mandatory
Exempted
Executive Engineer PWD R and B Division Basohli
18 Nov 2021
30 Sept 2021
17 Nov 2021
30 Sept 2021
16 Nov 2021
2 Oct 2021
1 Oct 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables, etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m including getting out excavated earth as directed by Engineer-in-charge, including all leads and lift. a) All kinds of soil.
Providing and laying cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with a) 1:5:10 (1 cement:5 coarse sand:10 graded stone aggregate 40mm nominal size). (including all leads and lifts carriages of material by MT/HL).
Providing and laying cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: a) 1:3:6 (1 cement:3 coarse sand:6 graded stone aggregate 20mm nominal size). (including all leads and lifts carriages of material by MT/HL).
Centring and shuttering including strutting, propping etc.and removal of form work for : a) Foundation, footings, bases of columns etc. for mass concrete.
12mm cement plaster of mix. 1:6 (1 cement:6 fine sand) (including all leads and lifts carriages of material by MT/HL).
Raking out joints in lime or cement mortar and preparing the surface for re-pointing or re-plastering, including disposal of rubbish to the dumping ground within 50 meters lead.
Finishing with epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface etc complete. a) On concrete work. (including all leads and lifts carriages of material by MT/HL).
Actual labour engaged for fitting of nut bolts etc.
Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15cm), with intermediate layer of compacted earth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30cm or as decided by Engineer-in-charge, including compacting each layer by rolling/ramming and watering, all complete as per drawing and direction of Engineer-in-charge.
Carriage of the following materials by Mechanical Transport from source to site of work incl. loading, unloading and stacking complete :- a) Sand from Billawar crusher for an average lead of 33.00 Km. by M.T. b) Stone aggregate 40mm nominal size & above from Billawar crusher for an average lead of 33.00 Km. by M.T. c) Stone aggregate (Crusher bajree) below 20mm nominal size from Billawar crusher for an average lead of 33.00 Km. by M.T.
RAJEEV GUPTA
PEEYOOSH JEE RAINA
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .