Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.9 LAccepted-AOC | ₹80.9 L | L1 | Accepted-AOC Financially Responsive |
| 2 | L2₹81.7 L+₹76,560 (0.95%)Accepted-AOC | ₹81.7 L+₹76,560 (0.95%) | L2 | Accepted-AOC Financially Responsive |
| 3 | L3₹82.9 L+₹1.9 L (2.38%)Accepted-AOC | ₹82.9 L+₹1.9 L (2.38%) | L3 | Accepted-AOC Financially Responsive |
| 4 | L4₹84.3 L+₹3.4 L (4.16%)Accepted-AOC MECHAGARH AMKOTIA GOHAIN GAON CITY TOWN NAZIRA P O AMKOTIA P S NAZIRA PIN 785697 DISTRICT SIVASAGAR ASSAM | SIVASAGAR | ASSAM | 785697 | ₹84.3 L+₹3.4 L (4.16%) | L4 | Accepted-AOC Financially Responsive |
| 5 | L5₹85.8 L+₹4.8 L (5.97%)Accepted-AOC | ₹85.8 L+₹4.8 L (5.97%) | L5 | Accepted-AOC Financially Responsive |
Tender Value
₹96.3 L
EMD Value
₹1.9 L
Closing Date
26 Jun 2023, 2:00 pmClosed
The Executive Engineer, PWD Sivasagar DTBD
O/o The Executive Engineer, PWD Sivasagar DTBD
Construction of Ground floor (Upto Plinth Level) of Piyoli Phukon Stadium Complex Part-IV, Sivasagar
2023_PWBNH_31237_1
W-2/2009-10/1928-34 Dated. 25-05-2023
Open Tender
Civil Works - Building
Works
180 days
Sivasagar
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,890
Yes
₹1.9 L
Yes
O/o The Executive Engineer, PWD Sivasagar DTBD
19 Oct 2023
16 Jun 2023
28 Jun 2023
16 Jun 2023
26 Jun 2023
16 Jun 2023
17 Jun 2023
Amount
Providing, driving with hydraulic piling rigs with power units and installing driven cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) 20.1.1 400 mm dia piles
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)
Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: 2.35.3.1 With Chlorpyriphos/Lindane E.C. 20% with 1% concentration
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources)
Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 6 graded stone aggregate 20 mm nominal size (Recycled Concrete Aggregate (RCA) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth
Centering and shuttering including strutting, propping etc. and removal of form for:: 5.9.1 Foundations, footings, bases of columns, etc. for mass concrete
5.9.3 Suspended floors, roofs, landings, balconies and access platform
5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers
5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts sqm 804.25
5.9.7 Stairs, (excluding landings) except spiral-staircases
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; 5.33.1 All works upto plinth level 5.33.1.1 Concrete of M25 grade with minimum cement content of 330 kg /cum
5.33.2 All works above plinth level upto floor V level 5.33.2.1 Concrete of M25 grade with minimum cement content of 330 kg /cum
RINTU BORAH
Lechaman Borgohain
SHIMA DUTTA BORGOHAIN
PRASANTA GAYAN
BIJIT BORUAH
KG ASSOCIATES
BASANTA GOGOI
RANJIT BORGOHAIN
Sanjib Konwar
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .