| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.9 LAccepted-AOC | ₹24.9 L | 1 | Accepted-AOC L2 is Accepted |
| 2 | 2₹25.1 LRejected-Finance | ₹25.1 L | 2 | Rejected-Finance L1 is Rejected |
| Sl No | Description | Qty | Unit | N A P AND CO L2 | P VENKATACHALAM L1 |
|---|---|---|---|---|---|
| 1.00 | Supply and delivery of HDPE PIPES - PE 100 AS PER IS 4984/2016 as per IS to the work site and as directed by the departmental engineer (PN 8) | 2,775 | RM | 455 ₹12.6 L | 454 ₹12.6 L |
| 2.00 | Supply and Delivery of Following HDPE Specials Including Cost and Conveyance of materails to site etc Complete as per SS 90mm Degree Bend | 25 | No | 448 ₹11,200 | 445 ₹11,125 |
| 3.00 | Equal Tee | 6 | No | 570 ₹3,420 | 570 ₹3,420 |
| 4.00 | Supply and Delivery of sluice valves (100mm Dia) P.N 1.6 with ISI Marking for the following sizes as per IS specification with ISI mark P. no 62,4 | 5 | No | 9,943 ₹49,715 | 9,940 ₹49,700 |
| 5.00 | Cutting open BT surface for laying water main including cost of all labour charges etc completed (As per TWAD SOR 2.a) | 60 | M3 | 995 ₹59,700 | 990 ₹59,400 |
| 6.00 | Earthwork Excavation and depositing on bank with initial lead of 10m and initial lift of 2m in trenches (Hand stiff clay, stiff black cotton ,hand red earth shales murram gravel, stoney earth and earth mixed with small bouldersand hard gravelly etc.,complete | 2,775 | RM | 207 ₹5.7 L | 204 ₹5.7 L |
| 7.00 | Lowering of HDPE PN 10 and specials carefully into the trench and laying to proper geade and alignment including labour charges,incidental and operational charge etc., complete as per standard specification and as directed by the departmental engineer | 2,775 | Rm | 20 ₹55,500 | 20 ₹55,500 |
| 8.00 | Cutting of HDPE RIGID PIPES and specials true to axis and filing smoothy and finishing the ends complete ,with /without water in the pipe including labour charges,incidental and operational charges etc., complete as per standard specification and as directed by the depatemental enginneer | 52 | No | 12 ₹624 | 12 ₹624 |
| 9.00 | Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part- 2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board Officers. | 461 | No | 234 ₹1.1 L | 230 ₹1.1 L |
| 10.00 | Construction of 1.50 x 0.90 size of Sluice valve pits using Brick work in C.M 1:5 as per type design etc complete as per standard specification | 5 | No | 16,348 ₹81,740 | 16,348 ₹81,740 |
Tender Value
Refer Docs
EMD Value
₹30,350
Closing Date
27 Feb 2026, 3:00 pmClosed
Commissioner
Municipal Office Road, Anna Salai, Tharamangalam
Extension of Distribution Main at New OHT to Ward No.05 Vettnikaradu Area and New OHT to Ward No.16 in Mottupatti Area at Tharamangalam Municipality
2026_MAWS_665646_1
351/2026/E1
Open Tender
Civil Works
Tharamangalam Municipality
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹30,350
20 Apr 2026
25 Feb 2026
27 Feb 2026
25 Feb 2026
27 Feb 2026
25 Feb 2026
25 Feb 2026 - 27 Feb 2026
Supply and delivery of HDPE PIPES - PE 100 AS PER IS 4984/2016 as per IS to the work site and as directed by the departmental engineer (PN 8)
Supply and Delivery of Following HDPE Specials Including Cost and Conveyance of materails to site etc Complete as per SS 90mm Degree Bend
Equal Tee
Supply and Delivery of sluice valves (100mm Dia) P.N 1.6 with ISI Marking for the following sizes as per IS specification with ISI mark P. no 62,4
Cutting open BT surface for laying water main including cost of all labour charges etc completed (As per TWAD SOR 2.a)
Earthwork Excavation and depositing on bank with initial lead of 10m and initial lift of 2m in trenches (Hand stiff clay, stiff black cotton ,hand red earth shales murram gravel, stoney earth and earth mixed with small bouldersand hard gravelly etc.,complete
Lowering of HDPE PN 10 and specials carefully into the trench and laying to proper geade and alignment including labour charges,incidental and operational charge etc., complete as per standard specification and as directed by the departmental engineer
Cutting of HDPE RIGID PIPES and specials true to axis and filing smoothy and finishing the ends complete ,with /without water in the pipe including labour charges,incidental and operational charges etc., complete as per standard specification and as directed by the depatemental enginneer
Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part- 2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board Officers.
Construction of 1.50 x 0.90 size of Sluice valve pits using Brick work in C.M 1:5 as per type design etc complete as per standard specification
Testing of HDPE Pipes with hydraulic Testing Equipment by filling with water (including cost bof water @ Rs.60/KL) and Testing yo recommended pressure in convenient and attenting the burst if any occurred during yhe test, excluding the cost of Pipes but including oyter incidential and operational charges etc complete for yhe following diameters of pipes
Refilling with excavated soil other than sand complying with standard specifications for filling in trenches
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_799496.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BIDDOCUMENTPIPELINE.pdf
Tender Documents • 0.25 MB
BOQ_799496.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid