| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC Lowest and reasonable |
| 2 | L2₹1.4 Cr+₹7.5 L (5.83%)Rejected-AOC | ₹1.4 Cr+₹7.5 L (5.83%) | L2 | Rejected-AOC Not lowest |
| 3 | L3₹1.4 Cr+₹10.8 L (8.41%)Rejected-AOC HYDERPORA NEAR ELLAQUAI DEHATI BANK SRINAGAR KASHMIR J K 190014 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190014 | ₹1.4 Cr+₹10.8 L (8.41%) | L3 | Rejected-AOC Not lowest |
| 4 | L4₹1.5 Cr+₹17.3 L (13.4%)Rejected-AOC C O BASHIR AHMAD LAWAY ABI GUZAR SRINAGAR 190001 J K | SRINAGAR | JAMMU AND KASHMIR | 190001 | ₹1.5 Cr+₹17.3 L (13.4%) | L4 | Rejected-AOC Not lowest |
| 5 | L5₹1.7 Cr+₹39.2 L (30.5%)Rejected-AOC KRAL PORA BAGH I MEHTAB NEAR MANCHOWA PETROL PUMP DISTRICT BUDGAM 190019 J K | BUDGAM | BUDGAM | J K | 190019 | ₹1.7 Cr+₹39.2 L (30.5%) | L5 | Rejected-AOC Not lowest |
| Sl No | Description | Qty | Unit | ALCO Engineers Private Limited L1 | m/s zeal construction co L2 | M/S GASSI BROTHERS L4 | M/S RATHER CONSTRUCTION CO L5 | M/S ZAHOOR AHMAD KHAN L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Note: (i) Please refer Schedule 'A' Notes of tender documents. (ii) Unless otherwise specified, earth work and excavation shall be measured and paid separately. (iii) The Schedule 'A' Part - - are not estimated by MES and the estimated rate indicated as "Rs. 0.00" under Col.5 signifies this fact only. (iv) In case rate of any item is not quoted by the bidder, the rate for the same item will be considered as zero and no claim in this regard at later date will be entertained. | ||||||||
| 2.00LUMPSUM/ OTHER PRE-PRICED PROVISIONAL SCHEDULES OF WORKS | ||||||||
| 2.01 | Lump sum price worked out by the contractor for BUILDING WORKS carried forward from Pre-Priced Schedule 'A' Part-I. | 1 | Each | 6,00,000 ₹6,00,000 | 7,00,000 ₹7,00,000 | 6,00,000 ₹6,00,000 | 7,00,000 ₹7,00,000 | 5,52,505 ₹5,52,505 Lowest |
| 2.02 | Lump sum price worked out by the contractor for BUTT WALL WORKS carried forward from Pre-Priced Schedule 'A' Part-II. | 1 | Each | 1,14,00,000 ₹1,14,00,000 Lowest | 1,15,00,000 ₹1,15,00,000 | 1,26,50,000 ₹1,26,50,000 | 1,45,00,000 ₹1,45,00,000 | 1,22,00,000 ₹1,22,00,000 |
| 2.03 | Lump sum price worked out by the contractor for EXTERNAL ELECTRIFICATION WORKS carried forward from Pre-Priced Schedule 'A' Part-III. | 1 | Each | 1,20,000 ₹1,20,000 | 1,20,000 ₹1,20,000 | 88,000 ₹88,000 Lowest | 1,20,000 ₹1,20,000 | 1,00,000 ₹1,00,000 |
| 2.04 | Lump sum price worked out by the contractor for SITE CLEARANCE & EARTHWORKS carried forward from Pre-Priced Schedule 'A' Part-IV. | 1 | Each | 7,50,000 ₹7,50,000 Lowest | 13,00,000 ₹13,00,000 | 12,62,000 ₹12,62,000 | 14,70,000 ₹14,70,000 | 11,00,000 ₹11,00,000 |
Tender Value
₹1.6 Cr
EMD Value
₹2.4 L
Closing Date
20 Dec 2025, 6:00 pmClosed
CE 31 Srinagar Zone
HQ CE 31 Srinagar Zone
CONSTRUCTION OF BUTT WALL AT SHORT RANGE UNDER GE 970 EWS
2025_MES_739995_1
800185
Open Tender
Civil Works
Lump-sum
400 days
GE 970 EWS
As per tender documents
10 documents required · 10 mandatory
₹1,000
GE 970 EWS
₹2.4 L
Yes
25 Feb 2026
15 Nov 2025
22 Dec 2025
15 Nov 2025
20 Dec 2025
15 Dec 2025
15 Nov 2025 - 27 Nov 2025
Note: (i) Please refer Schedule 'A' Notes of tender documents. (ii) Unless otherwise specified, earth work and excavation shall be measured and paid separately. (iii) The Schedule 'A' Part - - are not estimated by MES and the estimated rate indicated as "Rs. 0.00" under Col.5 signifies this fact only. (iv) In case rate of any item is not quoted by the bidder, the rate for the same item will be considered as zero and no claim in this regard at later date will be entertained.
LUMPSUM/ OTHER PRE-PRICED PROVISIONAL SCHEDULES OF WORKS
Lump sum price worked out by the contractor for BUILDING WORKS carried forward from Pre-Priced Schedule 'A' Part-I.
Lump sum price worked out by the contractor for BUTT WALL WORKS carried forward from Pre-Priced Schedule 'A' Part-II.
Lump sum price worked out by the contractor for EXTERNAL ELECTRIFICATION WORKS carried forward from Pre-Priced Schedule 'A' Part-III.
Lump sum price worked out by the contractor for SITE CLEARANCE & EARTHWORKS carried forward from Pre-Priced Schedule 'A' Part-IV.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_828601.xls
BOQ • 0.31 MB
TenderButtWallMerged.pdf
Tender Documents • 1.63 MB
DrawingsButtWall.pdf
Additional Documents • 13.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .