Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Finance | -30.00% | ₹3.4 L | L1 | Admitted-Finance |
| 2 | L2₹4.5 L+₹1.1 L (32.7%)Admitted-Finance | -7.10% | ₹4.5 L+₹1.1 L (32.7%) | L2 | Admitted-Finance |
| 3 | L3₹4.6 L+₹1.2 L (35.7%)Admitted-Finance | -5.00% | ₹4.6 L+₹1.2 L (35.7%) | L3 | Admitted-Finance |
Tender Value
₹4.8 L
EMD Value
₹9,688
Closing Date
24 Aug 2026, 6:00 pmClosed
Divisional Forest Officer Shopian
O/o the Divisional Forest Office Shopian at Padpawan Shopian
Construction of Crate Work DRSM and Dibbling of HC Nut Patch Sowing Grass Slips in Compartment Rb16 at Dubjan Hirpora under the Scheme UT CAPEX Stabilization of Slip Area for the year
2026_FD_320404_1
e-Nit 04 of 2026-27
Open Tender
Civil Works - Others
Percentage
40 days
Dubjan Hirpora
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Divisional Forest Officer Shopian
₹9,688
7 Sept 2026
11 Aug 2026
25 Aug 2026
12 Aug 2026
24 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Crate Work | |||||
| 1.01 | Providing & making Gabion structure with Mechnically woven double twisted Hexagonal shaped wire mesh Gabion Boxes as per IS 16014:2012, MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of + 2%) Zinic + PVC coated, Mesh wire diameter 2.7/3.7 mm, mechanically edged/ selvedged with partitions at every 1m interval and shall have minimum 10 numbers of opendings per meter of mesh perpendicular to twist, typing with lacing wire of diameter 2.2/3.2 mm (ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in-charge | 80 | cum | 3,350.85 | ₹2,68,068 |
| 1.02 | Collection of Stones from different Nallah Pockets upto site of work av. Lead by head of 300 mts | 80 | cum | 493.08 | ₹39,446.4 |
| 2DRSM Work | |||||
| 2.01 | Collection of Stones from different Nallah Pockets upto site of work av. Lead by head of 300 mts.(For DRSM) | 180 | cum | 493.08 | ₹88,754.4 |
| 2.02 | Dumping stone excluding cost of stones. On slopes (DRSM Work) | 180 | cum | 261.45 | ₹47,061 |
| 2.03 | Dibbling of H.C Nuts | 2,000 | Nos | 7.18 | ₹14,360 |
| 2.04 | Patch Sowing- Patch 45 cmx45cmx15cm | 2,000 | Nos | 6.99 | ₹13,980 |
| 2.05 | Grass slips in patches | 2,000 | Nos | 6.35 | ₹12,700 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_1065138.xls
BOQ • 0.34 MB
Extensiondate.pdf
PDF • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .