Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance SONKH ROAD DURGAPURI MATHURA SONKH ROAD MATHURA UTTAR PRADESH 281001 | MATHURA | UTTAR PRADESH | 281001 | L1 | Accepted-Finance Lowest Bid Amount | |
| 2 | L2₹5.3 L+₹29,606.20 (5.92%)Rejected-Finance 48 VILLAGE KISHANPUR TEHSIL MAHAVAN UTTAR PRADESH VILLAGE KISHANPUR TEHSIL MAHAVAN UTTAR PRADESH MAHAVAN MAHAVAN KISHANPUR | L2 | Rejected-Finance Not L1 | |
| 3 | L3₹5.8 L+₹84,340.50 (16.9%)Rejected-Finance | L3 | Rejected-Finance Not L1 | |
| 4 | Rejected-Technical GIJJROLI AGRA ROAD HATHRAS UTTAR PRADESH 204101 INDIA | HATHRAS | HATHRAS | UTTAR PRADESH | 204101 | - | Rejected-Technical Technical bid is not found ok |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
30 May 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, EDC-II, Mathura
Near Kali Mata Mandir, Cant, Mathura
Deposit work in the area of EDSD-Mant under EDD-Mant, Mathura
2025_DVVNL_1037799_2
06/EDC-II(M)/2025-26
Open Tender
Electrical Works
Item Rate
365 days
Mathura
Please see tender documents
2 documents required · 2 mandatory
₹590
DVVNL, Agra
₹5,000
16 Jun 2025
23 May 2025
30 May 2025
23 May 2025
30 May 2025
23 May 2025
Amount
Carriage of 8.5/9 Mtr Long PCC Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.)
Carriage of 11/13 Mtr Long ST Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50 Kms.)
Carriage of 10/16 KVA Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends
Carriage of 25/63 KVA Transformer from Store Centre, Mathura to site of work with loading & unloading at both ends
Carriage of 11 KV XLPE Cable size 3x70/3x120 sq.mm. Cable form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends.
Carriage of 11 KV XLPE Cable size 3x185/3x300 sq.mm. Cable form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends.
Carriage of Line material i.e. conductor, G.I. wire, TPMO, stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.
Erection of single pole structure 8.5/9 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Erection of single pole structure 11/13 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Erection of Double pole structure 8.5/9 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Erection of Double pole structure 11/13 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works.
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
Laying, sagging stringing and binding of ACSR Dog Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
Laying, sagging stringing and binding of Arial Bunch Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
Laying, sagging stringing and binding of LT PVC Cable on the erected PCC pole/STP including jumpering as per RESPO manual.
Laying of 11 KV XLPE Cable size 3x70/3x120 sq.mm. in the trench/HDPE pipe by making trench/diggingand re-dressing of trench after laying of XLPE Cable for proper completion of work as per direction of supervising engineer.
Laying of overhead 11 KV XLPE 3x70 mm2/3x120 mm2 as per direction of supervising engineer.
Laying of overhead 11 KV XLPE 3x185 mm2/3x300 mm2 as per direction of supervising engineer.
Laying of 11 KV XLPE Cable size 3x185/3x300 sq.mm. in the trench/HDPE pipe by making trench/digging and re-dressing of trench after laying of XLPE Cable for proper completion of work as per direction of supervising engineer.
Filing of cable box as suitable size as per direction of supervising engineer.
filing of Straight through as suitable size as per direction of supervising engineer.
Chopping of Tree branches to Clear the route properly.
Mounting of 10/16 KVA Transformer on the Double pole/Plinth structures and connections thereof.
Mounting of 25/63 KVA Transformer on the Double pole/Plinth structures and connections thereof.
Cutting of CC Road for making depth foundation for erection of pole.
Installation of 11 KV CT/PT Combined metering unit on existing double pole structure of large & heavy, power consumers to avoid possibility of theft of energy & 11 KV feeders at 33/11 KV sub- station including the cost of accessories (Nut & Bolt, PVC Tape etc.) required for proper completion of work also provided by the contractor. (including carriage of New 11 KV CT/PT combined metering unit from Store Center Mathura to Site of work.)
Fixing of meter pilfer box (service connection meter holding capacity) including its carriage from Electricity Store Centre Mathura to site of work including grouting of meter pillar box in ratio 1:4:8 cement, sand and brick ballast as per standard norms.
Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material.
Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion.
Fixing of Distribution Box on erected PCC Pole.
M/s Maa Sharda Associates (BID ID -5225102)
M/s Shri Balaji Traders (BID ID -5222390)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .