| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.7 LAccepted-AOC R O VILL KHANAR P O MUNDU TEH THEOG DISTT SHIMLA 171226 | SHIMLA | HIMACHAL PRADESH | 171226 | ₹53.7 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹56.6 L+₹2.9 L (5.45%)Rejected-Finance | ₹56.6 L+₹2.9 L (5.45%) | L2 | Rejected-Finance Due to high percentage |
| 3 | L3₹58.9 L+₹5.2 L (9.77%)Rejected-Finance | ₹58.9 L+₹5.2 L (9.77%) | L3 | Rejected-Finance Due to high percentage |
| 4 | L4₹61.1 L+₹7.5 L (13.9%)Rejected-Finance | ₹61.1 L+₹7.5 L (13.9%) | L4 | Rejected-Finance Due to high percentage |
| 5 | L5₹62.9 L+₹9.2 L (17.2%)Rejected-Finance | ₹62.9 L+₹9.2 L (17.2%) | L5 | Rejected-Finance Due to high percentage |
Tender Value
₹76.7 L
EMD Value
₹1 L
Closing Date
24 Jul 2026, 6:00 pmClosed
EE HPSAMB
EE HPSAMB
C/o PCC Wall, Drains, Septic Tank, Steel railings and road Work at Market Yard at Shilaroo, Distt. Shimla, H.P.
2026_HPAMB_139290_1
HMB-EC-11/92-Vol-XI
Open Tender
Civil Works
Percentage
120 days
Shilaroo
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
₹1 L
20 Aug 2026
17 Jul 2026
25 Jul 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting in earth work in by mechanical means all heights and depths in all kinds of soils, including saturated soils comprising of pick work , Jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (Where blasting is prohibited) and their intermediate classification of soil including, dewatring where required, setting out to required lines, levels as shown on the drawing and directed by the Engineer-in - charge at site, according to the HP.PWD. specification of 1990( One Thousand Nine Hundred ninety) Volume-I (One) and sorting out useful and unuseful matreial and Transportation of the unuseful matreial for disposing at dumping site ( To be arranged by the Contractor) as per satisfacation of Engineer -in- Charge through all modes of transportation including head load , animal load or mechnical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechnical means and labour( If required). All useful material such as stone , shingles aggregate and slates Shall be properly Stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per direction of the Engineer -in -charge . The recovery for stones wll be on the basis of prodata basis, weather useful or not, for the minimum quatom of 33.60 cubic meter @ Rupee 300/- Only (Rupees. Three hundred) per cubic meter Shall be effected on pro rata basis in all circumstances. Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 672 | Per Cubic Metre | 300 | ₹2,01,600 |
| 2 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed by Engineer-incharge and disposing of all excavated earth at dumping site ( To be arranged by the Contractor) as per satisfacation of Engineer -in- Charge through all modes of transportation including head load , animal load or mechnical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechnical means and labour( If required). All useful material such as stone , shingles aggregate and slates Shall be properly Stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per direction of the Engineer -in -charge . Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 798.38 | Per Cubic Metre | 230 | ₹1,83,627.4 |
| 3 | Providing form work with steel plates 3.15mm (Three point one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, height of propping and centering in all heights. below supporting floor to ceiling and removal of the same for in – situ reinforced concrete and plain concrete work in retaining walls, return walls, walls ( any thickness) including attached pilasteres,buttresses, plinth and string cources fillets, kerbs and steps etc.within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, Toll Tax Sales tax or any other taxes imposed by the Government. | 828 | Per Square meter | 365 | ₹3,02,220 |
| 4 | Providing form work with steel plates 3.15mm (Three point one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, height of propping and centering in all heights. below supporting floor to ceiling and removal of the same for in – situ reinforced concrete and plain concrete work in foundation footings, basis of columns etcetera and mass concrete, including carriage of materials. Within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, Toll Tax Sales tax or any other taxes imposed by the Government. | 472.92 | Per Square meter | 256.55 | ₹1,21,327.63 |
| 5 | Providing form work with steel plates 3.15mm (Three decimal one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, heights of propping and centering in all heights below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in flat surfaces such as soffits of suspended floors, roofs, landings, shelves, and the like floor, etc. up to any thickness, up to all floor level, including carriage of materials within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, Toll Tax Sales tax or any other taxes imposed by the Government. | 48.16 | Per Square meter | 350 | ₹16,856 |
| 6 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing as per HPPWD specifications or as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts. The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government.
a) 1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 40 mm nominal size) | 352.8 | Per Cubic Metre | 5,822.05 | ₹20,54,019.24 |
| 7 | Providing and laying mechanically mixed and vibrated cement concrete 1:4:8 (one cement isto four sand isto eight graded crushed stone aggregate 40mm (forty millimeter) nominal size) and curing complete, in or under water, including pumping or bailing out water/dewatering, removal of slush which may arise at the time of laying under water complete excluding the cost of form work in foundation and plinth in all depths/heights as per HPPWD specifications or as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts. The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government. | 175.66 | Per Cubic Metre | 5,501.2 | ₹9,66,340.79 |
| 8 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge in all works up to plinth lable complete as per HPPWD specifications or as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals.The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government. | 83.62 | Per Cubic Metre | 7,200 | ₹6,02,064 |
| 9 | Providing and laying Tor steel reinforcement of TATA, sail , Rashtriya Ispat or its substantial equivalent make for Reinforced Cement Concrete work including bending, binding and placing in position complete including cost of binding wire and other incidentals due for its completion up to all floor level complete as per HPPWD specifications or as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government. | 6,287.5 | Per Killogramme | 88 | ₹5,53,300 |
| 10 | Providing and laying 80mm thick ISI marked heavy duty precast cement concrete inter locking paver blocks vibro compacted upto M-50 grade i/c border or kurb block grey or coloured over sub-base of concrete (Sub base concrete floor to be paid seperatoly for complete as per HP.PWD., Specifications includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. | 700 | Per Square meter | 1,260.5 | ₹8,82,350 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_206376.xls
BOQ • 0.35 MB
SBD_1_Shilaroo.pdf
Tender Documents • 6.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .