Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.1 LAccepted-AOC | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹34.1 L+₹99,264.60 (3.00%)Rejected-AOC | L2 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | ADITHYA AND CO L2 | T T CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged RCC Slab as per the instruction of Departmental officers. Including all initial lead and other labour charges. | 7 | m3 | 3,722.42 ₹26,056.94 | 3,614 ₹25,298 Lowest |
| 2.00 | Desilting the existing drain as per the instruction of Departmental officers. Including all initial lead and other labour charges. | 110 | m3 | 116.39 ₹12,802.9 | 113 ₹12,430 Lowest |
| 3.00 | Dismantling the damaged Cement mortar concrete wall work as per the instruction of Departmental officers. Including all initial lead and other labour charges. | 68 | m3 | 550.02 ₹37,401.36 | 534 ₹36,312 Lowest |
| 4.00 | Earth work for drain to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting | 415 | m3 | 139.05 ₹57,705.75 | 135 ₹56,025 Lowest |
| 5.00 | Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete. | 415 | m3 | 170.98 ₹70,956.7 | 166 ₹68,890 Lowest |
| 6.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 44 | m3 | 5,757.7 ₹2,53,338.8 | 5,590 ₹2,45,960 Lowest |
| 7.00 | Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as reinforced cement concrete slabs, walls etc., with all cross bracing etc., including decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all heights. | 916 | m2 | 503.67 ₹4,61,361.72 | 489 ₹4,47,924 Lowest |
| 8.00 | Drain walls with of Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 214 | m3 | 6,508.57 ₹13,92,833.98 | 6,319 ₹13,52,266 Lowest |
| 9.00 | Wall plastering for Plain cement concrete surfaces using cement mortar 1:5(One part of cement, five parts of sand by volume) thickness 12 mm (average) for all internal/external surfaces for drains etc., finished smoothly to one level including curing etc., complete, at all leads and at all heights. | 212 | m2 | 179.22 ₹37,994.64 | 174 ₹36,888 Lowest |
| 10.00 | Supplying and erecting in the position of Centering for slab lintel and beams including necessary supports and strutting with all cross bracings using mild steel sheet boarding etc., completed | 261 | m2 | 1,007.34 ₹2,62,915.74 | 978 ₹2,55,258 Lowest |
Tender Value
₹39.5 L
EMD Value
₹39,500
Closing Date
7 Jul 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of storm water drainage in MCR colony cut road 1 at ward no 85 South Zone
2025_MAWS_576934_3
e34/2025-CGF
Open Tender
Civil Works
Works
180 days
Coimbatore corporation
AS PER THE TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹39,500
30 Oct 2025
2 Jul 2025
8 Jul 2025
2 Jul 2025
7 Jul 2025
2 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .