Tender Value
₹62.8 L
EMD Value
₹1.3 L
Closing Date
31 Aug 2026, 11:00 am7d left
DSCO Keshav Kumar
Opposite Aggarwal Hospital, Kishanpura Road, Sangrur
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV, Construction of Haudies and all other allied works.
2026_DOA_173789_1
DSWC/SAN/2026-27/20
Open Tender
Pipe Laying Works
Percentage
180 days
Sangrur
Please refer tender documents.
3 documents required · 3 mandatory
₹2,500
₹1.3 L
18 Aug 2026
18 Aug 2026
31 Aug 2026
18 Aug 2026
31 Aug 2026
18 Aug 2026
FINANCIAL BID NO.: DSWC/SGR/2026-27/20
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs.
Quoted by Contractor (As % less of Estimated Amount) Quote (+/-%)
Note: Please quote only figure (upto 2 decimal points) in above blue colour box in minus or plus. Do not put %age sign after this figure. Please check Quoted Rate in Next cell.
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 350 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Mogha No 4180/L Village Bhai ki Pisor, Tehsil Lehra District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 13056.23 /Cum 93.78 Rupees Ninty Three and Seventy Eight Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 9565 /Mtrs 76 Rupee Seventy Six Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 3826 /Joints 160.68 Rupees One Hundred Sixty and six eight Paise Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (350mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 20 /Meter 2777.02 Rupees Two Thousand seven hundred seventy seven and zero two
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (350 mm) 99 /Cut hole 95 Rupees Ninty Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 27 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (350mm) 99 /Riser & Valve 569.6 Rupees Five hundred Sixty nine and six zero Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 27 /Air pipe 287.13 Rupees Two Hundred Eighty seven and one three Paise Only 0
Fixing of PUMP STAND (900 MM) (Excavation+Labour and Material used for Foundation & Fixing of Pipe) 10 /Pump Stand 6593 Rupees Six Thousand five Hundred ninety three Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Only
B.B.C 1:8:16 0.6 cum 3861.45 Rupees Three Thousand Eight Hundred Sixty One and Fourty Five Paise Only
Plain Cement Concrete 1:2:4 0.14 cum 5080.83 Rupees Five Thousand Eighty and Eighty Three Paise Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5041.28 Rupees Five Thousand Fourty One and Twenty Eight Paise Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.79 Rupees Two Hundred two and Seventy Nine Only
RCC Slab 1:2:4 0.21 cum 8179.41 Rupees Eight Thousand One Hundred Seventy Nine and Fourty One Paise Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for five Haudis (B) 165745
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Rode Cut 2 each 15000 Fifteen Thousand
Drian Cut 1 each 50000 Fifty Thousand
Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only
Fixing of gate valve (350 mm) 25 each 1735.26 Rupees One Thousand Seven Hundred Thirty Five and two six Paise Only
Nimar for jointing the pipe 351.99 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 837.21 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Grand Total (A)
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency 175336
Grand Total (A)
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 450 mm Dia RCC Pipes, fixing of AVP , Risers, Gate valve & Complete Pump Stand at Village - Maha Singh Wala (C/o 0446/L),Moonak Branch, Harigarh Gehlan Minor,Tehsil Moonak and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 0.0 /Cum 93.78 Rupees Ninty Three and Seventy Eight Only
Lowering of 450 mm R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 5200 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 450 mm R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 2080 /Joints 239.5 Rupees Two Hundred Thirty Nine and Fifty Paise Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (450mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2000 Rupees Two Thousand Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (450 mm) 43 /Cut hole 116 Rupees One hundred Sixteen Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 38 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (450mm) 11 /Riser & Valve 777.89 Rupees Seven hundred Seventy Seven and Eighty Nine Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 38 /Air pipe 292.65 Rupees Two Hundred Ninty Two and Sixty Five Paise Only
Estimate of Charges for 1100 mm Dia Pump Stand (as Siltation Chamber)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Paisa Only
Material and Labour Charges For Foundation of Pump stands(1:8:16) 2306.665
Material and Labour Charges For Fixing of Pump stands 3600.39
Complete Work Total Cost for ONE Pump Stand
Complete Work Total Cost for Four No. Pump Stand (B)
Fixing of gate valve (450 mm) 11 each 2175.89 Rupees Two Thousand One Hundred Seventy Five and Eighty-Nine paise Only
Sign Board 1 each 4000 Rupees Four Thousand Only
Nimar for jointing the pipe 318.556 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 1 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 626.396 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency(D) 0
GRAND Total (B)
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 350 mm Dia RCC Pipes, fixing of AVP , Riser Pipe, Fixing of Alfa Alfa valves and gate valve at Village - Boupur (C/o 2404/L), Tehsil Moonak and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1399.13 /Cum 93.78 Rupees Ninty Three and Seventy Eight Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1025 /Mtrs 76 Rupee Seventy Six Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 410 /Joints 174.5 Rupees One Hundred Seventy Four and Fifty Paise Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (350mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2000 Rupees Two Thousand Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (350 mm) 10 /Cut hole 95 Rupees Ninty Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 7 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (350mm) 10 /Riser & Valve 612 Rupees Six hundred Twelve Only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 7 /Air pipe 290 Rupees Two Hundred Ninety Only
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only
Fixing of gate valve (350 mm) 1 each 1735.28 Rupees One Thousand Seven Hundred Thirty Five and Twenty Eight Paise Only
Nimar for jointing the pipe 32.144 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 56.855 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency(D) 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 350 mm Dia RCC Pipes, fixing of AVP , Riser Pipe, Fixing of Alfa Alfa valves and gate valve at Village - kHOKAR (C/o 13400/L), Tehsil Moonak and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 4770.68 /Cum 93.78 Rupees Ninty Three and Seventy Eight Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 3495 /Mtrs 76 Rupee Seventy Six Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 1398 /Joints 161.235 Rupees One Hundred Sixty One and Twenty Four Paise Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (350mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2000 Rupees Two Thousand Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (350 mm) 31 /Cut hole 95 Rupees Ninty Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 24 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (350mm) 31 /Riser & Valve 575.42 Rupees Five hundred Seventy Five and Fourty Two Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 24 /Air pipe 290.21 Rupees Two Hundred Ninety and Twenty One Paise Only
Estimate of Charges for 1100 mm Dia Pump Stand (as Siltation Chamber)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Paisa Only
Material and Labour Charges For Foundation of Pump stands(1:8:16) 2306.665
Material and Labour Charges For Fixing of Pump stands 3600.39
Complete Work Total Cost for ONE Pump Stand
Complete Work Total Cost for Four No. Pump Stand (B)
Fixing of gate valve (350 mm) 4 each 1735.28 Rupees One Thousand Seven Hundred Thirty Five and Twenty Eight paise Only
Sign Board 0 each 4000 Rupees Four Thousand Only
Nimar for jointing the pipe 128.616 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 1 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 305.424 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Grand Total (a+b+c)
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency(D) 0
GRAND Total (D)
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency(D)
Total (A+B+C+D)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
NITUGPL262720.pdf
Tender Documents • 0.52 MB
FBUGPL262720.xls
Additional Documents • 0.16 MB
DNITUGPL262720.pdf
Tender Documents • 1.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].