Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹25.5 L+₹49,999.88 (2.00%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹26.0 L+₹99,999.75 (4.00%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical 47 HANDWARA HANDWARA HANDWARA BUDGAM JAMMU KASHMIR 191111 UDYAM JK 12 0000914 | BUDGAM | JAMMU AND KASHMIR | 191111 | - | Not Admitted-Fee/PreQual/Technical Others-Consenting by the contractor for Withdrawal | ||
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-TR not uploaded |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
29 Sept 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer ED Anantnag
Office of the Executive Engineer ED Anantnag
Renovation and Modernization of various distribution transformers (PDDSS2627100218) at vaious locations of ED Anantnag under UT Capex (Works List enclosed)
2026_PDD_323855_1
60-EDA 2026-27
Open Tender
Electrical Works
Percentage
45 days
ED Anantnag
Please refer to the tender documents
9 documents required · 9 mandatory
₹1,000
Executive Engineer ED Anantnag
₹50,000
12 Oct 2026
8 Sept 2026
30 Sept 2026
8 Sept 2026
29 Sept 2026
8 Sept 2026
8 Sept 2026 - 29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Substation Part | |||||
| 1.01 | Dismantling, Loading, Transportation / Carriage and reinstallation of 630 kVA,11/0.433kV, 3-phase Distribution Transformers (Complete Job ) | 1 | Job | 4,000 | ₹4,000 |
| 1.02 | Dismantling, Loading, Transportation / Carriage and reinstallation of 250 kVA,11/0.433kV, 3-phase Distribution Transformers (Complete Job ) | 2 | Job | 4,500 | ₹9,000 |
| 1.03 | Dismantling, Loading, Transportation / Carriage and reinstallation of 100 kVA,11/0.433kV, 3-phase Distribution Transformers (Complete Job ) | 2 | Job | 4,000 | ₹8,000 |
| 1.04 | Dismantling, Loading, Transportation / Carriage and reinstallation of 63 kVA,11/0.433kV, 3-phase Distribution Transformers (Complete Job ) | 1 | Job | 4,500 | ₹4,500 |
| 1.05 | Supply,installation,testing,commissioning of 11 kV, G.O AB Switch , 3-phase, 3-Pole, 200A | 15 | Set | 8,500 | ₹1,27,500 |
| 1.06 | Supply,installation,testing,commissioning of 11 kV Horn Gap Fuse Set 3-Phase, 3-Pole, 200Amp. | 15 | Set | 4,068 | ₹61,020 |
| 1.07 | Supply,installation,testing,commissioning of Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type Heavy Type | 15 | Set | 5,890 | ₹88,350 |
| 1.08 | Providing and Fixing of G.I.channel Iron ISMC100x50x6mm) with 50X8 mm back clamps without drilling/punching holes in the poles.. | 504 | Kg | 106 | ₹53,424 |
| 1.09 | Providing and Fixing of GI channel Iron ISMC 75x40x6 mm) with 50X8 mm back clamps without drilling/punching holes in the poles including transformer belt | 1,296 | Kg | 106 | ₹1,37,376 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tendernotice_2.pdf
PDF • 1.01 MB
Tendernotice_3.pdf
PDF • 18.33 MB
Tendernotice_4.pdf
PDF • 0.46 MB
BOQ_1091431.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .