Tender Value
₹9.5 L
EMD Value
₹10,000
Closing Date
28 Nov 2023, 1:00 pmClosed
SE EDC Farrukhabad
Bholepur Fatehgrah Farrukhabad
Earthing of Medium Power TF and Construction of Plinth under EDD Kaimganj
2023_DVVNL_863321_1
36/EDC(F)/2023-24
Open Tender
Miscellaneous Works
Lump-sum
30 days
Farrukhabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL
₹10,000
Yes
1 Dec 2023
19 Nov 2023
28 Nov 2023
19 Nov 2023
28 Nov 2023
19 Nov 2023
Amount
fo|qr forj.k e.My] Q#Z[kkckn ds vUrxZr fo|qr forj.k [k.M dk;exat ds {ks= esa 100 ls 250 dsoh, ds u;s ehfM;e forj.k ifjorZdksa dh fIyUFk fuekZ.k ,oa ifjorZd dh vfFkZx dk dk;ZA
Construction of plinth of size 5’x5’x4’ above ground level & one it, below the ground level of 9” After excavation of 4” earth brick ballast shall be provided & remmering will be done properly After that a retaining wall of 9” with by first class brick ration 1:4 of cement & send be made. The earth shall be filled up to one ft. below the top of the plinth. After this brick ballest shall be provided up to 6’ from the earth level & proper rammering shall be done. One No. Jall of 12 mm MS for shall be fixed in the hollow of plinth & one ft. thick RCC in ratio of cement, sand & stone ballast shall be laid on the top of the plinth the 12mm thick plastering shall be done all around the plinth in 1:4 ratio of cement & sand. The contractor shall be responsible to complete the work as per direction of Supervision Engineer It. Includes the cost of all material Labour, T&P Carrier etc. required for proper completion of work .
Earthing of 250KVA & above Distribution Transformer by digging pits 6” dia up to 3 mtr. Deep including inserting lowering 50mm dia G.I. and insert 25 mm G.I. pipe chemical filled pipe I.S.I. Mark B-Grade connecting with M.S. Flat 50x6mm Transformer to 50mm dia G.I. pipe and filling of chemical mixture of chamber & then connecting the top of the inserted pipe and transformer body through M.S. strip with the help of nut & bolts or through welding under under EDD Kaimganj
Body Earthing of Transformer.
Neutral Earthing of Transformer.
OM SHRI SAI RAM
M/S SAI ENTERPRISES
JAI BHOLE BABA ELECTRONIC
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .