| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-AOC | ₹11.3 L Quoted ₹11.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹12.1 LRejected-AOC | ₹12.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S. THIRUMAL | sriram |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in sand, silt or other loose soil wet sand or silt not under water light block cotton soil sandy loan and ordinary soil including excavated earth. | 139 | M3 | 13,622 ₹16,073.96 | 13,344 ₹15,745.92 |
| 2.00 | Refilling with excavated soil other than sand complying with standard specification for filling in sides of drain with watering and consolidation including cost of labours, lead, lift, etc. complete. | 29.8 | M3 | 1,579.4 ₹1,863.69 | 1,490 ₹1,758.20 |
| 3.00 | Providing shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all materials, labour, lead, lift, tools etc., complete. | 347.2 | M2 | 2,01,376 ₹2.4 L | 1,97,209.6 ₹2.3 L |
| 4.00 | Providing PCC 1:4:8 cement concrete using OP/PP cement with 40mm size machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete | 34.8 | M3 | 2,16,108 ₹2.6 L | 2,11,932 ₹2.5 L |
| 5.00 | Providing RCC 1:1.5:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 44.7 | M3 | 4,69,350 ₹5.5 L | 4,60,410 ₹5.4 L |
| 6.00 | Supplying & providing Steel reinforcement including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, etc. complete. | 3,129 | Kg | 3,11,335.5 ₹3.7 L | 3,03,513 ₹3.6 L |
Tender Value
Refer Docs
EMD Value
₹10,100
Closing Date
4 Dec 2025, 2:00 pmClosed
CE TTPS Thoothukudi
Office of the SE Civil TTPS Thoothukudi
Rectification by Providing RCC Drain along the South of ESP 4 area from Culvert end to ASPH
2025_EB_623079_1
CE SE C TTPS 336 2025 26
Open Tender
Civil Works - Others
120 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,100
Yes
25 Mar 2026
13 Nov 2025
5 Dec 2025
13 Nov 2025
4 Dec 2025
13 Nov 2025
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in sand, silt or other loose soil wet sand or silt not under water light block cotton soil sandy loan and ordinary soil including excavated earth.
Refilling with excavated soil other than sand complying with standard specification for filling in sides of drain with watering and consolidation including cost of labours, lead, lift, etc. complete.
Providing shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all materials, labour, lead, lift, tools etc., complete.
Providing PCC 1:4:8 cement concrete using OP/PP cement with 40mm size machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete
Providing RCC 1:1.5:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Supplying & providing Steel reinforcement including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, etc. complete.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_745048.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid