Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.9 LAdmitted-Finance | +0.00% | ₹10.9 L | L1 | Admitted-Finance |
| 2 | L2₹11.0 L+₹10,859.07 (1.00%)Admitted-Finance | +1.00% | ₹11.0 L+₹10,859.07 (1.00%) | L2 | Admitted-Finance |
| 3 | L3₹11.1 L+₹21,718.13 (2.00%)Admitted-Finance | +2.00% | ₹11.1 L+₹21,718.13 (2.00%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10.9 L
Closing Date
24 Apr 2026, 6:00 pmClosed
Add CEO ZP SOLAPUR
EE2 ZP SOlapur
Improvement of road sounde to gawde wasti road vr no.176 ch no.0/00 to 1/500 tal karmala tal solapur
2026_SOLAP_1295754_1
Improvement of road sounde to gawde wasti road vr no.176 ch no.0/00 to 1/500 tal karmala tal solapur
Open Tender
Civil Works - Roads
Percentage
90 days
Zp solapur
Please Refer Tender documents
5 documents required · 5 mandatory
₹500
Exempted
2 Jul 2026
17 Apr 2026
27 Apr 2026
17 Apr 2026
24 Apr 2026
17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour charges for removing grass, thorney shurbs, Jungli shurb, Kubabhul and alike grass along roadside making the ground clean by showel and phavaras, excetra complete. | |||||
| 2Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing off unsuitable or excess stuff as directed all sorts of soils. | |||||
| 3Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening / binding material to fill the interstices of coarse aggregate, watering and compacting with Vibratory roller to the required density. | |||||
| 4Providing and constructing 50 milimetre thick modified penetration macadam road surface including all materials, preparing the existing road surface, spreading 40 milimetre stone metal layers 100 percent crusher broken metal with conical crusher plant, heating and spraying the bitumen of of specified grade at the rate of 1.75 kilogram per square metre, spreading 12 milimetre size chips, compacting with three wheel static roller having weight 8 to 10 metric tonnes to achive the desired degree of compaction as per technical specification Clause 506, excetra complete. Including picking of existing water bound macadam surface. | |||||
| 5Providing and applying tack coat on the prepared surface, heating by flames in boiler and spraying bitumen set footed in bitumen boller on black topped surface 2.5 killogram per 10 square metre. | |||||
| 6Providing and Laying open graded premix surfacing of 20 milimetre thickness composed of 13.2 milimetre to 5.6 milimetre aggregates premixed with bituminous binder, transported to site with vehicle tracking system, laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction, excluding prime / tack coat and seal coat. | |||||
| 7Providing bituminous type-A liquid seal coat on bituminous surface including supplying all materials and bitumen of VG-30 grade, preparing existing road surface, heating and applying bitumen at the rate of 0.98 kilogram per square metre by mechanical means, spreading chips and rolling by static roller having weight 8 to 10 metric tonne, excetra complete. | |||||
| 8Supplying hard murum / kankar at the road site, including conveying and stacking, excetra complete. | |||||
| 9Spreading hard murum / soft murrum / gravel or kankar for side width, excetra complete. | |||||
| 10Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering, excetra complete. | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_2226256.xls
BOQ • 0.31 MB
SBD.pdf
Tender Documents • 2.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .