Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | SINGLE₹12.2 LAccepted-AOC 3 LSC 2ND FLOOR OPP ANNADLOK SOCIETY GATE NO 1 DDA MARKET MAYUR VIHAR PHASE 1 NEW DELHI DELHI 110091 | EAST DELHI | DELHI | 110091 | ₹12.2 L | SINGLE | Accepted-AOC AWARD OF WORK TO SINGLE BIDDER |
| Sl No | Description | Qty | Unit | SRB INTERNATIONAL PVT LTD L1 |
|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc: 1. To carry out periodic / scheduled inspection and maintenance of entire system as per the OEM recommendations. 2. Attend and rectify the minor breakdown, if any, within 24 hours of reporting the problem and rectify the major breakdowns within 72 hours of reporting. 3. Periodic inspection and maintenance for Air Conditioner system 4. Refrigerant filling including: a. Any leakage in air conditioner will be checked in every point by soap solution. b. Vacuum formation in the system by means of vacuum pump. c. Refrigerant charging (R410A/R407C) with the adjustment of high and low pressure cut offs. d. Ensuring proper cooling within the PCR room, operator cabin and rest room. 5. Repair /replacement of any defective/ faulty parts of the Plant Air Conditioner on the machine. 6. If a machine remains breakdown for a complete month, no payment shall be made for that machine in that particular month. | ||||
| 2.00 | Charges for maintenance of 3 nos. Air Conditioning system (02 Ton each) fitted in operator cabin, AC electrical panel and DC panel of Baidyanath dragline including periodical/ scheduled maintenance inclusive of manpower, tools, transportation, refrigerant(R140/407C)and its charging etc. for 1 year. | 1 | Job | 5,28,000 ₹5.3 L |
| 3.00 | Charges for maintenance of 2 nos. Air Conditioning system (05 tone & 02 Ton each) fitted in operator cabin, AC electrical panel and DC panel of Vishwanath dragline including periodical/ scheduled maintenance inclusive of manpower, tools, transportation, refrigerant(R140/407C)and its charging etc. for 1 year. | 1 | Job | 5,28,000 ₹5.3 L |
| 4.00 | Total impact of GST for the purpose of CTC | 1 | No. | - |
Updated dates
Tender Value
₹11.3 L
EMD Value
₹14,200
Closing Date
8 Dec 2025, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U. P. - 231222
Annual maintenance contract (AMC) of AC of 20by90 draglines of Khadia Project
2025_NCL_347873_1
KHD/G.M. (Excv)/E-Tender/25-26/900
Open Tender
Excavation Department Work
365 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
5 documents required · 5 mandatory
₹14,200
7 Jun 2026
21 Nov 2025
9 Dec 2025
21 Nov 2025
8 Dec 2025
22 Nov 2025
21 Nov 2025 - 29 Nov 2025
Charges for maintenance of 3 nos. Air Conditioning system (02 Ton each) fitted in operator cabin, AC electrical panel and DC panel of Baidyanath dragline including periodical/ scheduled maintenance inclusive of manpower, tools, transportation, refrigerant(R140/407C)and its charging etc. for 1 year.
Charges for maintenance of 2 nos. Air Conditioning system (05 tone & 02 Ton each) fitted in operator cabin, AC electrical panel and DC panel of Vishwanath dragline including periodical/ scheduled maintenance inclusive of manpower, tools, transportation, refrigerant(R140/407C)and its charging etc. for 1 year.
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_360587.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.18 MB
COC_ATC.pdf
Tender Documents • 0.75 MB
Annexures.pdf
Tender Documents • 1.09 MB
BOQ_360587.xls
BOQ • 0.33 MB
ITB.pdf
Tender Documents • 0.19 MB
Download all tender documents and submit your bid