Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.2 LAccepted-Finance H 11 HOUSING BOARD UNIT MADHAYANKUTTAI PO METTUR DAM 52 | METTUR DAM | SALEM | TAMIL NADU | 1 | Accepted-Finance satisfied | |
| 2 | 2₹5.7 L+₹47,229 (9.08%)Accepted-Finance M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 2 | Accepted-Finance satisfied |
Tender Value
Refer Docs
EMD Value
₹6,500
Closing Date
22 Sept 2021, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I Boiler Rotating parts Units I and II Preventive and Breakdown maintenance Works and other allied works as and when required basis for the period of 120 days from the date of commencement of work
2021_EB_210552_1
CE / MTPS-I / SE / M-I / BM / OT. 140 / 2021-22
Open Tender
Power/Energy Projects/Products
Works
120 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹6,500
Yes
23 Sept 2021
16 Sept 2021
23 Sept 2021
16 Sept 2021
22 Sept 2021
16 Sept 2021
Amount
Charges for dismantling of Air motors/inspection and renewal of internals, vanes, bearings and reassembling works.
Charges for Attending ESP field failure.
Charges for cleaning the accumulated coal dust, fly ash & other waste materials and air washing of the hot primary air duct, hot secondary air duct, various floors of Air pre heater, flue gas duct, cold primary air duct, cold secondary air duct, Primary air fan, Forced draught fan, Induced draught fan and its floors, ESP CRM floor, ESP roof top, structure, floor, walk way, hand rails, pipes etc from Economizer out let to chimney in Units I & II area.
Charges for renewal of worn out Multi disc & coupling Bolts
Charges for dismantling, renewal of bearings & Gears and internals, reassembling of CRM gear boxes.
Charges for dismantling, renewal of bearings & Gears and internals, reassembling of ERM gear boxes.
Charges for cleaning and dismantling of ID cooler
Charges for assembling of ID cooler
Charges for hydraulic testing of the renewed working oil cooler @ 15 kg/cm2 pressure for 30 minutes in the presence of Board Engineer
APH – Inspection of speed reducer internals.
Inspection ,replacing the worn out over running clutch and related works.
APH – Inspection – Replacing the worn out fluid coupling of the speed reducer.
Charges for renewal of Runner half coupling of both speed reducer side and fluid coupling side.
Charges for removal of insulation skin casing sheets and insulation for an area of 3 m2 and removal of access door plate of 2 m2 and refixing the same after completion of work.
Charges for dismantling and cleaning of PA / APH lub oil cooler
Charges for assembling of PA / APH lub oil cooler
Charges for hydraulic testing of the renewed working oil cooler @ 15 kg/cm2 pressure for 30 minutes
Charges for over hauling of Rotark /Auma actuator Model SA 100 E90 in Boiler area by leading, lifting, draining Oil, dismantling, cleaning, checking mechanical operation attending minor defects, renewing oil seal, O ring, gasket assembling.
Consumables and T&Ps for S.No.1 to 18
THIAGARAJAN ENGINEERING CONTRACTOR
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .