| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹60.0 CrAccepted-AOC 63 USHA NAGAR EXTENSION INDORE | INDORE | INDORE | MADHYA PRADESH | ₹60.0 Cr | 1 | Accepted-AOC AGREEMENT DONE AS PER LETTER FROM DIVISION |
| 2 | 2₹60.4 CrRejected-Finance | ₹60.4 Cr | 2 | Rejected-Finance BEING L2 |
| 3 | 3₹60.6 CrRejected-Finance B H PVR CINEMA NR AUDA GARDEN 3RD FLOOR 310 CENTRAL BY SANGATH IPL VISAT GANDHINAGAR HIGHWAY MOTERA CHANDKHEDA AHMEDABAD AHMEDABAD GUJARAT 380005 UDYAM GJ 01 0021515 | AHMADABAD | GUJARAT | 380005 | ₹60.6 Cr | 3 | Rejected-Finance BEING L3 |
Tender Value
₹60.7 Cr
EMD Value
₹30.4 L
Closing Date
6 Mar 2024, 5:30 pmClosed
Executive Engineer, Hiran Water Resources Division
Executive Engineer, Hiran Water Resources Division Jabalpur (M.P.)
On Turnkey Basis Conveying of water for khamha hose Irrigation system from RBC Bargi canal of Village Khamha including all types of activities, necessary structures construction etc compete with supply of water under pressure with SCADA, as per detai
2023_WRD_318508_1
1042/2023-24/Einc/Etendering/ dt.26-12-2023
Open Tender
Civil Works - Others
1095 days
Jabalpur
Please refer Tender documents.
30 documents required · 30 mandatory
₹50,000
₹30.4 L
Bhopal
27 Mar 2024
14 Feb 2024
7 Mar 2024
14 Feb 2024
6 Mar 2024
20 Feb 2024
20 Feb 2024
Amount
Construction of a pressurized Pipe irrigation system to supply water through the Rising/Gravity mains for hose irrigation to deliver at farmers field upto 5.00 ha with a duty of 0.37 lit/sec/ha and maintained up to 5.0 ha chak, keeping the discharge of minimum 10 times the duty at 05 hectare and at least 4 Meter Residual Head at each 5.0 ha chak for hose Pressurized Irrigation by rotation with a total power requirement of 2.40 MW in the Culturable command area of 6100.00 hectare, out of gross command area 7200.00 hectare, fully covering the entire compact and contiguous possible arable area and any area increase/ decrease in CCA within / beyond the GCA shall be permitted with written approval of Chief Engineer as per the index map for hose Irrigation System under contract. It includes all activities starting from survey, investigation, designing, procurement, construction, laying, installing, etc. of gravity mains, main line, branch lines, distribution network, controlling and regulation system etc. for supply of water for irrigation under pressure with SCADA and automation and construction of approach roads as per PMGSY. The work including defect liability period for 60 months and Management, Operation & Maintenance (MOM) of complete commissioned system (MOM) for the period of 60 months after completion. MOM period is further extendable for another period of 60 months.
Construction of a pressurized Pipe irrigation system to supply water through the Rising/Gravity mains for hose irrigation to deliver at farmers field upto 5.00 ha with a duty of 0.37 lit/sec/ha and maintained up to 5.0 ha chak, keeping the discharge of minimum 10 times the duty at 05 hectare and at least 4 Meter Residual Head at each 5.0 ha chak for hose Pressurized Irrigation by rotation with a total power requirement of 2.40 MW in the Culturable command area of 6100.00 hectare, out of gross command area 7200.00 hectare, fully covering the entire compact and contiguous possible arable area and any area increase/ decrease in CCA within / beyond the GCA shall be permitted with written approval of Chief Engineer as per the index map for hose Irrigation System under contract. It includes all activities starting from survey, investigation, designing, procurement, construction, laying, installing, etc. of gravity mains, main line, branch lines, distribution network, controlling and regulation system etc. for supply of water for irrigation under pressure with SCADA and automation and construction of approach roads as per PMGSY. The work including defect liability period for 60 months and Management, Operation & Maintenance (MOM) of complete commissioned system (MOM) for the period of 60 months after completion. MOM period is further extendable for another period of 60 months.
Almighty Ventures Private Limited
YCUBE ENGINEERED SOLUTIONS PVT LTD
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid