Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹23.8 L+₹1.2 L (5.22%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹23.9 L+₹1.3 L (5.59%)Rejected-Finance | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Selvam L2 | K.Arunachalam L1 | M.R.CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00Construction of 60000 litre OHT(12m Staging Height) Near Amman Kovil in Kallurani Village & Panchayat . | ||||||
| 2.00OHT Abstract | ||||||
| 3.00Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth | ||||||
| 4.00 | First depth of 2m | 59.47 | cum | 263 ₹15,640.61 | 250.6 ₹14,903.18 Lowest | 265 ₹15,759.55 |
| 5.00 | 2 nd Depth | 10.21 | cum | 276 ₹2,817.96 | 262.4 ₹2,679.1 Lowest | 277 ₹2,828.17 |
| 6.00 | Sand filling for foundation with clear M sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers. | 2.92 | cum | 1,630 ₹4,759.6 | 1,549.3 ₹4,523.96 Lowest | 1,635 ₹4,774.2 |
| 7.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers. | 4.37 | cum | 5,530 ₹24,166.1 | 5,253.55 ₹22,958.01 Lowest | 5,540 ₹24,209.8 |
| 8.00Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. | ||||||
| 9.00 | For footing below G.L. ( 1,50 to 4,50 below GL ) | 10.53 | cum | 9,140 ₹96,244.2 | 8,683.85 ₹91,440.94 Lowest | 9,150 ₹96,349.5 |
| 10.00 | For Column and Brace upto G.L ( 0 to1,50 below GL ) | 2.33 | cum | 9,002 ₹20,974.66 | 8,552 ₹19,926.16 Lowest | 9,010 ₹20,993.3 |
Tender Value
₹24.1 L
EMD Value
₹24,100
Closing Date
15 Jul 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO (V.PT)
KEELAPAVOOR PANCHAYAT UNION OFFICE
construction of 60000 litter OHT 12m Staging Height Near Amman Kovil in Kallurani Village at Panchayat
2026_RDTN_683458_1
Kallurani OHT 15th CFC
Open Tender
Civil Works
Works
KEELAPAVOOR
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹24,100
Yes
25 Aug 2026
1 Jul 2026
15 Jul 2026
1 Jul 2026
15 Jul 2026
1 Jul 2026
1 Jul 2026 - 15 Jul 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of 60000 litre OHT(12m Staging Height) Near Amman Kovil in Kallurani Village & Panchayat . | - | - | - | - |
| 2 | OHT Abstract | - | - | - | - |
| 3 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth | - | - | - | - |
| 4 | First depth of 2m | 1 | cum | 263.78 | ₹263.52 |
| 5 | 2 nd Depth | - | cum | 276.2 | - |
| 6 | Sand filling for foundation with clear M sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers. | - | cum | 1,630.84 | - |
| 7 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers. | - | cum | 5,530.04 | - |
| 8 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. | - | - | - | - |
| 9 | For footing below G.L. ( 1,50 to 4,50 below GL ) | 1 | cum | 9,140.87 | ₹9,131.73 |
| 10 | For Column and Brace upto G.L ( 0 to1,50 below GL ) | - | cum | 9,002.1 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_821562.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_821562.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .