| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.4 LAccepted-AOC 866 67 TELI MANDI AMBALA CANTT AMBALA HARYANA | AMBALA | HARYANA | 133001 | L1 | Accepted-AOC AOC | |
| 2 | L2₹79.2 L+₹80,758 (1.03%)Rejected-Finance C O VERMA BUILDING VILLAGE SANAN P O SANJULLI DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | L2 | Rejected-Finance 2nd Lowest |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
18 Apr 2026, 10:30 amClosed
Executive Engineer Division Kasumpti HPPWD Shimla
Executive Engineer Division Kasumpti HPPWD Shimla-3
C/O R/wall and B/wall damaged at RD. 0/00 to 0/800)( Balance Work)
2026_PWD_134176_1
SD-I-CTR-Tender-2026- 891-906 dated 10-4-26
Open Tender
Civil Works
Percentage
120 days
Shimla
As per SBD
15 documents required · 15 mandatory
₹2,000
₹1.6 L
5 May 2026
13 Apr 2026
18 Apr 2026
13 Apr 2026
18 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for structures in all depths as per drawing and technical specification for rural roads August 2004 clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all lead and lift including dressing of sides and bottom and back filling in trenches with excavated Suitable materials. All work of rock *cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock(where blasting is prohibited). all earth work in cutting/excavation including rock excavation shall be carried out true to lines grades, side slopes, width, camber super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner treaming filling of unevenness blind age and finishing of the road to specified dimension or as directed by the Engineer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other causes it shall be remove by suitable diversion bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be duly compensated by him in all respects including all incidental charges.The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Cubic Metre | - | - |
| 2 | Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803,1202 and 1203 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (a) Cement Mortar 1:6:12(1one cement: six sand: twelve graded stone agg.40mm nominal size).The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Cubic Metre | - | - |
| 3 | Providing and laying concrete Mechanically mixed and vibrated P.C.C. M-20 nominal mix 1:3:6 (one cement: three sand: six graded stone aggregate 20 mm (twenty millimeter) nominal size for plain /reinforced concrete in open foundations and plinths or similar works complete as per drawings and technical specification for rural roads August 2004 clause 802, 803, 1202 and 1203 and curing complete including the cost of form work and hauling of materials in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge.The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Cubic Metre | - | - |
| 4 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i)1:2:4 (one cement : two coarse sand) : four graded stone aggregate 20 mm (twenty milimetre) nominal size)The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Cubic Metre | - | - |
| 5 | Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification clause 1204.3.8 granular material. including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in-Charge.The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Cubic Metre | - | - |
| 6 | Providing weepholes in brick masonry/stone masonry/plain reinforced conrete abutment, wing wall, return wall with 100 mm dia. PVC pipe extending through the full width of the structures with slope of I(v): 20 (H) towards drawing face complete as per drawing and technical specification clauses 614,709,1204.3.7.including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in-Charge.The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Running meter | - | - |
| 7 | Supplying fittig and placing HYSD bar (Fe415) reinforced in Super Structure as per drawing and technical specification clause 1002, 1002, 1005, 1010 & 1202 including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge.The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Kilogramme | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_198417.xls
BOQ • 0.38 MB
SBD7917457.pdf
Tender Documents • 7.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .