Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-AOC | 1 | Accepted-AOC AOC | |
| 2 | Rejected-Technical | - | Rejected-Technical high price |
| Sl No | Description | Qty | Unit | PIRAMANAYAGAM L1 | MR.JUSTIN PRATHEEP, CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soil such as hard stiff clay, light black cotton, shalles, muram except hard rock including all charges etc., complete as per SS20 B. | 2.5 | m3 | 264 ₹660 Lowest | 270 ₹675 |
| 2.00 | CC1:4:8 mix using 40mm metal including cost and conveyance of all materials to site with all leads of pure water for curing and all labour charges and all other incidental charges etc complete | 0.4 | m3 | 5,572 ₹2,228.8 Lowest | 5,580 ₹2,232 |
| 3.00 | PCC 1:2:4 mix using 20mm metal including cost and conveyance of all materials to site with all leads of pure water for curing and all labour charges and all other incidental charges etc complete | 0.1 | m3 | 7,188 ₹718.8 Lowest | 7,195 ₹719.5 |
| 4.00 | Brick work in CM 1:5 mix using country bricks including cost and conveyance of all materials to site with all leads of pure water for curing and all labour charges and all other incidental charges etc complete | 0.8 | m3 | 7,434 ₹5,947.2 Lowest | 7,440 ₹5,952 |
| 5.00 | Centering and shuttering for soffits of all RCC work including cost and conveyance of all materials to site and all labour charges and all other incidental charges etc complete - Footing | 1 | m2 | 489 ₹489 Lowest | 495 ₹495 |
| 6.00 | Slab | 4.8 | m2 | 1,085 ₹5,208 Lowest | 1,090 ₹5,232 |
| 7.00 | Columns | 2.4 | m2 | 1,085 ₹2,604 Lowest | 1,090 ₹2,616 |
| 8.00 | Supply and fabrication of steel including cost and conveyance of all materials to site and all labour charges and all other incidental charges etc complete | 138 | Kg | 92 ₹12,696 Lowest | 100 ₹13,800 |
| 9.00 | RCC1:1/2:3 mix using 20mm metal including cost and conveyance of all materials to site with all leads of pure water for curing and all labour charges and all other incidental charges etc complete | 1.1 | m3 | 8,322 ₹9,154.2 Lowest | 8,330 ₹9,163 |
| 10.00 | Special ceiling Plastering in Cement Mortor 1:3 Mix (one Cement, Three sand ) 10mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications | 2.3 | m2 | 334 ₹768.2 Lowest | 340 ₹782 |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
1 Jun 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer
Town Panchayat Veeravanallur
Providing Bore well with Mini OHT at ward no 7 Mutharamman kovil street
2026_DTP_677344_1
35/2026/A1
Open Tender
Civil Works
Works
Veeravanallur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,000
14 Jul 2026
18 May 2026
1 Jun 2026
18 May 2026
1 Jun 2026
18 May 2026
30 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all classes of soil such as hard stiff clay, light black cotton, shalles, muram except hard rock including all charges etc., complete as per SS20 B. | 2.5 | m3 | - | - |
| 2 | CC1:4:8 mix using 40mm metal including cost and conveyance of all materials to site with all leads of pure water for curing and all labour charges and all other incidental charges etc complete | 0.4 | m3 | - | - |
| 3 | PCC 1:2:4 mix using 20mm metal including cost and conveyance of all materials to site with all leads of pure water for curing and all labour charges and all other incidental charges etc complete | 0.1 | m3 | - | - |
| 4 | Brick work in CM 1:5 mix using country bricks including cost and conveyance of all materials to site with all leads of pure water for curing and all labour charges and all other incidental charges etc complete | 0.8 | m3 | - | - |
| 5 | Centering and shuttering for soffits of all RCC work including cost and conveyance of all materials to site and all labour charges and all other incidental charges etc complete - Footing | 1 | m2 | - | - |
| 6 | Slab | 4.8 | m2 | - | - |
| 7 | Columns | 2.4 | m2 | - | - |
| 8 | Supply and fabrication of steel including cost and conveyance of all materials to site and all labour charges and all other incidental charges etc complete | 138 | Kg | - | - |
| 9 | RCC1:1/2:3 mix using 20mm metal including cost and conveyance of all materials to site with all leads of pure water for curing and all labour charges and all other incidental charges etc complete | 1.1 | m3 | - | - |
| 10 | Special ceiling Plastering in Cement Mortor 1:3 Mix (one Cement, Three sand ) 10mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications | 2.3 | m2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_813868.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_813868.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .