Tender Value
₹22.2 L
EMD Value
₹2.2 L
Closing Date
20 May 2026, 12:00 pmClosed
EE PD PWD SHAHJAHANPUR
EE PD PWD SHAHJAHANPUR
Construction work of a State-Funded Anganwadi Centre in Village Vaidapur under Development Block Nigohi in Distt. Shahjahanpur (Fin Year 2026-27)
2026_CEBLY_1143652_3
1684/12A Dt. 04-04-2026
Open Tender
Civil Works - Buildings
Percentage
180 days
SHAHJAHANPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹944
₹2.2 L
25 Jul 2026
14 May 2026
20 May 2026
14 May 2026
20 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation for dtructure as per drawing and technical specification including setting out, construction shoring and bracing removal of atumps and other deleterious and disposal upto lead of 50m dressing of sides and bottam and backfilling in trenches with excavated with excavated suitable material | - | Cum. | - | - |
| - | Filing of Earth in plinth including supply of necessary quantity of sand from a distance not exceeding 15.0 km. from the site of work and including watering, ramming, dressing etc rate to include cost of all materials, labour and T & P etc required for proper completion of the work. | - | Cum. | - | - |
| - | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | - | Cum. | - | - |
| - | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km. (5 miles) from the site of work and including watering, ramming, dressing etc rate to include cost of all materials, labour and T & P etc required for proper completion of the work. | - | Cum. | - | - |
| - | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in Footing foundation excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item. | - | Cum. | - | - |
| - | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in Plinth Beam excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item | - | Cum. | - | - |
| - | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in Column excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item | - | Cum. | - | - |
| - | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in Lintel excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item | - | Cum. | - | - |
| - | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in Beam excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item | - | Cum. | - | - |
| - | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in Slab excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item | - | Cum. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_2148980.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .