Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-Finance H NO 2287 SHOP NO 11 RAMALAYA BUILDING 1ST FLOOR CURCHOREM GOA | CURCHOREM | GOA | ₹11.6 L | L1 | Accepted-Finance Financially Rejected being 2nd lowest |
| 2 | L2₹11.6 L+₹220.29 (0.02%)Rejected-Finance NO 2249 DABAMOL CURCHOREM GOA | SOUTH GOA | GOA | 403103 | ₹11.6 L+₹220.29 (0.02%) | L2 | Rejected-Finance Financially Accepted being 1st lowest |
Tender Value
₹11.0 L
EMD Value
₹22,029
Closing Date
24 Jul 2026, 3:00 pmClosed
Harsha V. S. Kakodkar
O/o Executive Engineer, WD V, DDW, Sanguem, Goa
Maintenance of Salaulim Water supply schemeurgent protection and stabilisation to the 1422mm dia MS pipeline between ch.9200 mt. to 9980 mt. Shirvoi in Quepem constituency.
2026_DDW_30438_1
20/DDW-WD V-ASW/2026-27/05 L5
Open Tender
Civil Works - Water Works
Percentage
60 days
O/o Executive Engineer, WD V, DDW, Sanguem
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹22,029
4 Aug 2026
17 Jul 2026
27 Jul 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavator) in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m.; All kinds of soil. | 96.12 | cu.m | 291 | ₹27,970.92 |
| 2 | Laterite boulder masonry in mud mortar in foundation | 256.32 | m3 | 2,932 | ₹7,51,530.24 |
| 3 | Extra for laterite boulder masonry in superstructure | 160.2 | m3 | 426 | ₹68,245.2 |
| 4 | Dry stone pitching 22.5 cms thick using laterite stone of approved quality including supplying of stone and preparing surface etc. complete. | 296.24 | m2 | 596 | ₹1,76,559.04 |
| 5 | Supplying and stacking of good earth at site including royalty and carriage upto 1 km. (earth measured in stacks will be reduced by 20% for payment). | 133.47 | cu.m | 578 | ₹77,145.66 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Tendernotice_2.pdf
PDF • 0.85 MB
BOQ_30849.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .