| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAccepted-AOC NO 4 642 4G SWARANALAKSHMI APPARTMENT VETTAIKARANPUDUR ROAD PERIYAPATTY POST KONDICHETTIPATTI NAMAKKAL 637 002 | NAMAKKAL | TAMIL NADU | 637002 | ₹2.6 Cr Quoted ₹2.3 Cr | L1 | Accepted-AOC Accepted by TAC |
| 2 | L2₹2.3 Cr+₹4.2 L (1.84%)Rejected-Finance NO 5 KOTTAI NAICKEN STREET KALAPPA NAICKENPATTI NAMAKKAL 637404 | NAMAKKAL | TAMIL NADU | 637404 | ₹2.3 Cr+₹4.2 L (1.84%) | L2 | Rejected-Finance After accepting L1 Bidder L2 bidder will be rejected |
| Sl No | Description | Qty | Unit | Shree Shivane Construction L2 | VRS BUILDERS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 1,156.5 | Cum | 257 ₹2,97,220.5 | 237.3 ₹2,74,437.45 Lowest |
| 2.00 | Supplying and filling in foundation, basement, etc with filling M sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 206.1 | Cum | 1,850 ₹3,81,285 | 1,815.5 ₹3,74,174.55 Lowest |
| 3.00 | Supplying and filling of gravel by lorry in basement filling including conveyance loading and unloading charges and all other incidential charges filling laying watering and consolidation etc. | 700.5 | Cum | 650 ₹4,55,325 | 616.62 ₹4,31,942.31 Lowest |
| 4.00 | Cement Concrete 1:5:10 (One Cement, Five M sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 173.7 | Cum | 5,590 ₹9,70,983 | 5,576.3 ₹9,68,603.31 Lowest |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two M sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 14.2 | Cum | 7,300 ₹1,03,660 | 7,268 ₹1,03,205.6 Lowest |
| 6.00Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cementcontent of 325 kglms and maximum water cement ratio of 0.50, including admixture (plasticiser / superplasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m') 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., | |||||
| 6.01 | a). Foundation and Basement | 279.45 | Cum | 9,100 ₹25,42,995 | 9,058 ₹25,31,258.1 Lowest |
| 6.02 | b). For Ground Floor | 88.2 | Cum | 9,300 ₹8,20,260 | 9,200 ₹8,11,440 Lowest |
| 7.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 332.65 | Qtl | 9,900 ₹32,93,235 | 9,707 ₹32,29,033.55 Lowest |
| 8.00 | Vacum dewatering on freshly laid and thoroughly vibrated concrete surface to produce a homogeneous and smooth concrete surface .Suction matshall be spread over the levelled fresh concrete surface and shall be connected by the suction hose to the vaccum pump for dewatering of surplus water in the concrete . After dewatering is complete , the concrete surface is trawled with minimum two passes to achieve a wear resistance concrete surface | 425 | Sqm | 79 ₹33,575 | 71.28 ₹30,294 Lowest |
Tender Value
₹2.1 Cr
EMD Value
₹2.5 L
Closing Date
7 Aug 2025, 5:45 pmClosed
Executive Engineer
Tamil Nadu State Agricultural Marketing Board, CIPET Road, Thiru.Vi.Ka industrial estate, Guindy, Chennai-32
Construction of Transaction Shed Cum Office 418 M2 Framers Rest Shed 240M2 Toilet block and Borewell at G.Ariyur Subsidiary Market Thiyagadurgam Rmin Kallakurichi District.
2025_TAMBC_585959_1
TNSAMB-2025-16-03
Open Tender
Civil Works
Lump-sum
365 days
at G.Ariyur Subsidiary Market (Thiyagadurgam Rm)in
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹2.5 L
8 Nov 2025
26 Jul 2025
8 Aug 2025
26 Jul 2025
7 Aug 2025
26 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .