| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-AOC | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹12.1 L+₹51,336.59 (4.42%)Rejected-AOC 3 165 1A KAMARAJ NAGAR KANGAYAMPALAYAM SULUR COIMBATORE TAMIL NADU 641 401 | COIMBATORE | COIMBATORE | TAMIL NADU | 641401 | L2 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | Vishnu Infrastructures L2 | Vetri constructions L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all solid with initial lead lift etc., complete for drain | 192 | M3 | 226.6 ₹43,507.2 | 220 ₹42,240 Lowest |
| 2.00 | Cement concrete 1:4:8 mix (One cement four Sand and eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and completed ,etc., complete complaying with standard specification. | 28 | M3 | 6,141.87 ₹1,71,972.36 | 5,963 ₹1,66,964 Lowest |
| 3.00 | Centering with steel centering for revertment, drain and culvert upto 1.20m depth using MS sheet of size 0.9x0.6m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 x 0.05 three rows with support by casurina pulleys 0.075 cm at 0.45 m length including cost of nails etc., | 462 | M2 | 550.02 ₹2,54,109.24 | 534 ₹2,46,708 Lowest |
| 4.00 | Plain Cement concrete 1:3:6 (one cement, three sand and six aggregate) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 79 | M3 | 6,922.65 ₹5,46,889.35 | 6,721 ₹5,30,959 Lowest |
| 5.00 | Plastering with cement mortar 1:5 mix (one cement and five sand) 12mm thick in all floors complying with standard specifications. | 103 | M2 | 318.29 ₹32,783.87 | 309 ₹31,827 Lowest |
| 6.00 | centering with steel shutters including studding with sides and support etc., for drain as per the direction of departmental officers etc., complete | 17 | M2 | 1,216.43 ₹20,679.31 | 1,181 ₹20,077 Lowest |
| 7.00 | Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying as per the direction of departmental officers. | 4 | Qtl | 9,828.26 ₹39,313.04 | 9,542 ₹38,168 Lowest |
| 8.00 | Reinforced cement concrete of 1:1.5:3 mix (one cement , one and half of sand and three of aggreegate) using Machine crushed hard broken granite stone jelly 20mm for RCC works in all types of foundation footings columns, FLOOR beams, slabs of all shapes (excluding cost of providing centering and fabrication of reinforcements which shall be measured and paid under seperate items but including curing Etc. and including fixing fan clamps or hooks, after lying of electrical canduit pipes, junction boxes wherever required complete, complying with standard specifications as directed by the engineer. | 5 | M3 | 10,036.34 ₹50,181.7 | 9,744 ₹48,720 Lowest |
| 9.00 | Supply and fixing of Manhole Cover 900mm dia as per the direction of departmental officers | 2 | Nos | 3,341.32 ₹6,682.64 | 3,244 ₹6,488 Lowest |
| 10.00 | Plain Cement concrete 1:2:4 (one cement, two sand and four aggregate) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 2 | M3 | 7,484.01 ₹14,968.02 | 7,266 ₹14,532 Lowest |
Tender Value
₹14 L
EMD Value
₹14,000
Closing Date
16 Dec 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of strom water drain and Culvert at Gandhi Street and Kamarajar street main road in Ward No.11, North zone
2025_MAWS_629272_2
e58/2025
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
As per Tender Document
5 documents required · 5 mandatory
₹0
₹14,000
23 Mar 2026
5 Dec 2025
17 Dec 2025
5 Dec 2025
16 Dec 2025
5 Dec 2025
Amount
Earth work excavation in all solid with initial lead lift etc., complete for drain
Cement concrete 1:4:8 mix (One cement four Sand and eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and completed ,etc., complete complaying with standard specification.
Centering with steel centering for revertment, drain and culvert upto 1.20m depth using MS sheet of size 0.9x0.6m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 x 0.05 three rows with support by casurina pulleys 0.075 cm at 0.45 m length including cost of nails etc.,
Plain Cement concrete 1:3:6 (one cement, three sand and six aggregate) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
Plastering with cement mortar 1:5 mix (one cement and five sand) 12mm thick in all floors complying with standard specifications.
centering with steel shutters including studding with sides and support etc., for drain as per the direction of departmental officers etc., complete
Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying as per the direction of departmental officers.
Reinforced cement concrete of 1:1.5:3 mix (one cement , one and half of sand and three of aggreegate) using Machine crushed hard broken granite stone jelly 20mm for RCC works in all types of foundation footings columns, FLOOR beams, slabs of all shapes (excluding cost of providing centering and fabrication of reinforcements which shall be measured and paid under seperate items but including curing Etc. and including fixing fan clamps or hooks, after lying of electrical canduit pipes, junction boxes wherever required complete, complying with standard specifications as directed by the engineer.
Supply and fixing of Manhole Cover 900mm dia as per the direction of departmental officers
Plain Cement concrete 1:2:4 (one cement, two sand and four aggregate) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
Conveyance of excavated earth from the site 2Km lead including loading and unloading etc completed
Vishnu Infrastructures (BID ID -1535386)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Building.pdf
Tender Documents • 0.97 MB
BOQ_752615.xls
BOQ • 0.26 MB
ITB.pdf
Additional Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .