| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹84.4 LAccepted-AOC | ₹84.4 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹92.6 LRejected-Finance | ₹92.6 L | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹92.8 LRejected-Finance | ₹92.8 L | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹95.7 LRejected-Finance 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹95.7 L | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹1.0 CrRejected-Finance | ₹1.0 Cr | L-5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | MAA GOMTI CONSTRUCTION L2 | SUBHASH CHANDRA CONTRACTOR L3 | M/S CHAUDHARY ENTERPRISES L4 | M/S AWADH CONSTRUCTION L1 | PREM CHANDRA KUSHWAHA CONTRACTOR L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation of foundation in Mar, Rankar and kankar mixed soils including lift up to 1.5 meter and lead upto 30 meter including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 meter from the foundation trenches. Dry earth work in foundation. | 291.74 | CUM | 87.86 ₹25,632.45 | 88.02 ₹25,679.13 | 80 ₹23,339.36 | 74 ₹21,588.91 Lowest | 97.38 ₹28,409.84 |
| 2.00 | Supply and Filling local sand including Cost of all Material, labour and T&P etc required for proper completion of work. | 27.09 | CUM | 967.32 ₹26,208.57 Lowest | 969.11 ₹26,257.07 | 1,000 ₹27,094 | 1,332 ₹36,089.21 | 1,072.15 ₹29,048.83 |
| 3.00 | CC 1:3:6 with 20-40 mm gauge stone ballast including aal cost of material labour T&P etc | 74.17 | CUM | 3,801.24 ₹2,81,953.18 Lowest | 3,808.26 ₹2,82,473.88 | 4,000 ₹2,96,696 | 4,440 ₹3,29,332.56 | 4,213.2 ₹3,12,509.9 |
| 4.00 | Brick work in 1:4 C.M.including cost of all materia, labour and T&P etc. required for proper completion of work as per direction of Engineer in -charge | 223.06 | CUM | 4,890.06 ₹10,90,762.11 | 4,899.09 ₹10,92,776.32 | 5,800 ₹12,93,730.6 | 4,218 ₹9,40,854.43 Lowest | 5,420.02 ₹12,08,973.4 |
| 5.00 | Providing and laying of R.C.C. work in 1:1.5:3 with cement, coarse sand and 20 mm crushed stone grit including cost of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer in -charge. | 44.8 | CUM | 5,720.53 ₹2,56,302.63 Lowest | 5,731.1 ₹2,56,776.2 | 6,000 ₹2,68,824 | 6,660 ₹2,98,394.64 | 6,340.49 ₹2,84,079.31 |
| 6.00 | Supplying & Laying of steel reinforcement bar at work site including Cost of all Material, labour and T&P etc required for proper completion of work. | 29.12 | QTL. | 64,023.6 ₹18,64,495.28 | 64,141.87 ₹18,67,939.54 | 65,000 ₹18,92,930 | 6,808 ₹1,98,262.58 Lowest | 70,962.12 ₹20,66,558.86 |
| 7.00 | Centring and shuttering of R.C.C. work including cost of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer in -charge. | 193.01 | SQM | 464.87 ₹89,725.49 Lowest | 465.73 ₹89,891.48 | 500 ₹96,506 | 555 ₹1,07,121.66 | 515.25 ₹99,449.43 |
| 8.00 | Plaster of (1:4) cement mortar including Cost of all Material, labour and T&P etc required for proper completion of work. | 1,171.17 | SQM | 124.07 ₹1,45,307.06 Lowest | 124.29 ₹1,45,564.72 | 130 ₹1,52,252.1 | 148 ₹1,73,333.16 | 137.51 ₹1,61,047.59 |
| 9.00 | Providing and fixing T-iron frames for doors, windows and ventilators of mild steel Tee-sections, joints mitred and welded, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer. Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 1,611.77 | KG | 83.78 ₹1,35,034.09 Lowest | 83.94 ₹1,35,291.97 | 90 ₹1,45,059.3 | 88.8 ₹1,43,125.18 | 92.86 ₹1,49,668.96 |
| 10.00 | Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply
veneering with vertical grains or cross bands and face veneers on both faces of shutters 35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws | 8.19 | SQM | 1,414.63 ₹11,585.82 Lowest | 1,417.25 ₹11,607.28 | 1,500 ₹12,285 | 2,960 ₹24,242.4 | 1,567.94 ₹12,841.43 |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
23 Jun 2026, 2:30 pmClosed
Supertending Engineer
Irrigation Work Circle Banda
Renovation Work of VVIP IH at Nawab Tank in Banda district. (LOT-01)
2026_UPIDC_1160570_1
03/SE/2026-27 dt 08-06-2026
Open Tender
Civil Works
Item Wise
180 days
Banda
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹2.3 L
Irrigation Work Circle Banda
21 Aug 2026
17 Jun 2026
23 Jun 2026
17 Jun 2026
23 Jun 2026
17 Jun 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of foundation in Mar, Rankar and kankar mixed soils including lift up to 1.5 meter and lead upto 30 meter including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 meter from the foundation trenches. Dry earth work in foundation. | 0.8 | CUM | 108.2 | ₹86.56 |
| 2 | Supply and Filling local sand including Cost of all Material, labour and T&P etc required for proper completion of work. | - | CUM | 1,191.28 | - |
| 3 | CC 1:3:6 with 20-40 mm gauge stone ballast including aal cost of material labour T&P etc | 0.6 | CUM | 4,681.33 | ₹2,808.8 |
| 4 | Brick work in 1:4 C.M.including cost of all materia, labour and T&P etc. required for proper completion of work as per direction of Engineer in -charge | 0.8 | CUM | 6,022.24 | ₹4,811.77 |
| 5 | Providing and laying of R.C.C. work in 1:1.5:3 with cement, coarse sand and 20 mm crushed stone grit including cost of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer in -charge. | - | CUM | 7,044.99 | - |
| 6 | Supplying & Laying of steel reinforcement bar at work site including Cost of all Material, labour and T&P etc required for proper completion of work. | 1 | QTL. | 78,846.8 | ₹78,767.95 |
| 7 | Centring and shuttering of R.C.C. work including cost of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer in -charge. | 0.8 | SQM | 572.5 | ₹458 |
| 8 | Plaster of (1:4) cement mortar including Cost of all Material, labour and T&P etc required for proper completion of work. | - | SQM | 152.79 | - |
| 9 | Providing and fixing T-iron frames for doors, windows and ventilators of mild steel Tee-sections, joints mitred and welded, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer. Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 1 | KG | 103.18 | ₹103.08 |
| 10 | Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply
veneering with vertical grains or cross bands and face veneers on both faces of shutters 35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws | 1 | SQM | 1,742.16 | ₹1,740.42 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.69 MB
TD.pdf
Tender Documents • 2.39 MB
BOQ_2175103.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].