Loading…
Loading…
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
9 Jul 2026, 4:00 pmDue tomorrow
Executive Engineer PWD (RnB) Division Doda
Executive Engineer PWD (RnB) Division Doda
As per NIT/SBD
2026_PWDJK_313954_3
e-NIT 14 of 2026-27
Open Tender
Civil Works
30 days
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Treasury Challan under MH 0059
₹20,000
Yes
30 Jun 2026
30 Jun 2026
10 Jul 2026
30 Jun 2026
9 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 218.92 | cum | 256.85 | ₹56,229.6 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 10.52 | cum | 5,202.9 | ₹54,734.51 |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse
sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah. | 111.14 | cum | 5,402.9 | ₹6,00,478.31 |
| 4 | Dry random rubble masonry with hard stone in foundation and plinth Without bond stone Nallah . | 51.95 | cum | 2,793.8 | ₹1,45,137.91 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but xcluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 5.74 | cum | 5,733.6 | ₹32,910.86 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns. | 19.12 | sqm | 286.35 | ₹5,475.01 |
| 7CARRIAGE OF MATERIALS By Mechanical Transport including loading, unloading and stacking | |||||
| 0.9 | Carriage of Stone avg. lead of 05.00km by MT | 163.09 | cum | 236.16 | ₹38,515.33 |
| 0.0 | Carriage of Sand avg. lead of 25.00 km by MT | 49.87 | cum | 465.14 | ₹23,196.53 |
| 0.9 | Carriage of bajiri (Below 40 mm) avg. lead of 25.00 km by MT | 5.11 | cum | 465.14 | ₹2,376.87 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_1016302.xls
BOQ • 0.38 MB
Extension.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid