Loading…
Loading…
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
6 Oct 2026, 3:30 pm
Shri MS Rathore
CHIEF CONSTRUCTION ENGINEER(RnD) NORTH DEVELOPMENT ENCLAVE RAO TULA RAM MARG BEHIND ARMY HQ CAMP DELHI CANTT
PROVISION OF RESURFACING OF ROAD AND ASSOCIATE WORKS FROM T JUNCTION TO DEVELOPMENT ENCLAVE MAIN GATE AT DELHI CANTT
2026_DRDO_926438_1
CCE(RnD)N/ROAD/DE/ENQ/2026-27
Open Tender
Civil Works - Roads
Percentage
90 days
DELHI CANTT
Open tender Enquiry amongst the agencies enlisted with DCWnE in composite Category Class-III and above civil Road-II and above and BIM-III and above enlisted with estate management enlistment ruole 2024
6 documents required · 6 mandatory
₹0
₹2.4 L
CCE_RnD_NORTH
16 Sept 2026
16 Sept 2026
7 Oct 2026
17 Sept 2026
6 Oct 2026
28 Sept 2026
24 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
(a) All kinds of soil. | 345 | cum | 182.83 | ₹63,076.35 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
(a) All kinds of soil. | 11 | cum | 268.11 | ₹2,949.21 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by amming and watering, lead up to 50 m and lift upto 1.5 m. | 5 | cum | 201.88 | ₹1,009.4 |
| 4 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. | 690 | sqm | 225.47 | ₹1,55,574.3 |
| 5 | Extra for compaction of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density). | 50 | cum | 25.6 | ₹1,280 |
| 6 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts,
spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineerin- Charge.
(a) With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25 | 138 | cum | 3,012.6 | ₹4,15,738.8 |
| 7 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge. | 138 | cum | 3,001.73 | ₹4,14,238.74 |
| 8 | Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge.
(a) 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. | 69 | cum | 11,463.44 | ₹7,90,977.36 |
| 9 | Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge.
(a) 40/50 mm compacted thickness with bitumen of grade VG-30 @ 5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. | 427.48 | cum | 12,489.99 | ₹53,39,220.93 |
| 10 | Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications :
(a) On bituminous surface @ 0.50 Kg / sqm | 8,549.5 | sqm | 49.65 | ₹4,24,482.68 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
ENQ.pdf
Tender Documents • 1.29 MB
BOQ_973562.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .