SE ETC NOIDA
220 KV SUB STATION SECTOR-20 NOIDA
Fault rectification and upgradation (including supply of required software and hardware) of SCADA system installed at 132 kV substation Sector 115 Noida under ETD-I Noida
2020_UPTCL_423810_1
E-T-66/ETCN/2019-20
Open Tender
Electrical Works
Item Rate
60 days
NOIDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EE ETD NOIDA
₹6,500
19 Feb 2020
14 Jan 2020
13 Feb 2020
14 Jan 2020
12 Feb 2020
14 Jan 2020
Amount
For Fault rectification & Upgradation (including supply of required software and hardware) of existing Siemens make SCADA system installed at 132 kV substation Sector-115 Noida as per substation scheme :- • SCADA software along with IEC 61850 communication protocol. • Replacement of existing PC by latest PC having required configuration to install SCADA and store data for 3-5 years. • Required Input & Output Modules along with RTU, with flash memory for storing, EMC stability upto 5KV (IEC 60255), plug and play modules , temperature range is -40 to +70 degree centigrade , housed in a Marshalling box to be installed in Control Room, capable of communicating with SCADA system on a single Fiber Optics cable. • The system is capable to communicate with all type of numerical relays on IEC 61850 protocol / Modbus RTU protocol/ IEC 60870-5-101/104 protocol through FO (Fiber Optics) communication to transfer status information to SCADA system. • Capable to communicate with existing ENERGY METERS (SECURE) on MODBUS and transfer data to SCADA system. • SCADA Automation is capable to show SLD on SCADA system and can monitor and control all the breakers MAKE/BREAK from SCADA screens. • Fiber Optics (FO) armored cable six (6) core 3 pair with conduit. • Rugged com switch and LIU box as required for system • Any other work necssarry for completion of the said work
Fault rectification & Upgradation (including supply of required software and hardware) of existing Siemens make SCADA system -Erection and commissioning of the system :- • System Software development as per requirement. • Screen development for SCADA as per system requirement. • Communication of Numerical Relays and parameters display on SCADA screen. • Status of Event logging with time stamping. • Report generation hourly for voltage, current, pf, energy etc. • Operational sequence to be displayed on SCADA. • Energy data display on SCADA screen.(If required) • Any other work necessarry for completion of the job
Hytech Controls
SAICO AUTOMATION PRIVATE LIMITED
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .