Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.9 L
EMD Value
₹4,900
Closing Date
24 Feb 2026, 3:00 pmClosed
Block Development Officer(BP), Sathankulam
Block Development Office, Sathankulam
Renovation of Panchayat office building at Thirupaniputhantharuvai Village in Thirupaniputhantharuvai Panchayat
2026_RDTN_661226_1
A2/212/2026/THIRUP/PTSOFFICE
Open Tender
Civil Works
Block Development Office, Sathankulam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,900
Yes
24 Feb 2026
19 Feb 2026
24 Feb 2026
19 Feb 2026
24 Feb 2026
19 Feb 2026
Renovation of Panchayat office building at Thirupaniputhantharuvai Village in Thirupaniputhantharuvai Panchayat
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothly with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (water proof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers.( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (water proof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coats of putty, scrapping the putty area to level the surface smooth, etc.,complete. The putty should be got approved by the Executive Engineer before use on work
Damp Proof Course in Cement Mortar(1:3) 20mm Thick using 5% Crude Oil etc., Complete complying with standard specification and as directed by the Departmental Officers.
Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm of approved quality laid in CM 1:3, 12mm thick. With water proofing compound confirming to IS by 2% by weight of cement used & the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar, Red oxide etc., complete complying with standard specifications. Rate for 10m2
Painting two coats with approved Colour distemper Paint over one priming coat of cement plastered wall surface and ceiling including cleaning preparing the surface and curing etc, complete
Painting two coats with approved Exterior Emulsion Paint over one priming coat of cement plastered wall surface and ceiling including cleaning preparing the surface and curing etc, complete
Painting new iron works for doors, windows and Ventilators, Iron bars, Weldmesh, wiremesh, screen, steel bars, flats and other similar works etc., with Two coats of approved first quality of synthetic enamel paint over the existing red oxide primer in all floors. The rate is inclusive of cost of all materials and labour, brushes and scaffolding charges etc., complete complying with standard specification.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.09 MB
TechnicalBid9PTSOffice.pdf
Tender Documents • 0.68 MB
BOQ_793604.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid