| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹216.7 CrAccepted-AOC | ₹216.7 Cr | L1 | Accepted-AOC DLOA issued |
| 2 | L2₹227.5 CrRejected-Finance CHOWGULE HOUSE CHOWGULE HOUSE MORMUGAO HARBOUR MORMUGAO HARBOUR MORMUGAO HARBOUR GOA 403803 | SOUTH GOA | GOA | 403803 | ₹227.5 Cr | L2 | Rejected-Finance quoted rates found on higher side |
| 3 | L3₹229.8 CrRejected-Finance | ₹229.8 Cr | L3 | Rejected-Finance quoted rates found on higher side |
| 4 | L4₹236.3 CrRejected-Finance | ₹236.3 Cr | L4 | Rejected-Finance quoted rates found on higher side |
| 5 | L5₹240.4 CrRejected-Finance | ₹240.4 Cr | L5 | Rejected-Finance quoted rates found on higher side |
Tender Value
Refer Docs
EMD Value
₹2.6 Cr
Closing Date
19 Jul 2021, 3:00 pmClosed
General Manager Contract
RSMML Corporate office , 4 Meera Marg Udaipur Rajasthan
Excavation and Removal of 162.50 Lac Bank Cubic Meter Rock from Central Pit (Part A and Part B) at Jhamarkotra Rock Phosphate Mine, Udaipur (Rajasthan)
2021_RSMML_227392_1
Contract 05
Open Tender
Mining
1825 days
Jhamarkotra Udaipur Rajasthan
as per tender document
13 documents required · 13 mandatory
₹4,720
RSMML
₹2.6 Cr
Yes
RSMML Corporate office Udaipur
13 Sept 2021
16 Jun 2021
20 Jul 2021
16 Jun 2021
19 Jul 2021
17 Jun 2021
1 Jul 2021
Amount
Mining of rock phosphate ORE including, drilling, digging, excavation, loading, transportation with all leads and lifts to Crushing Plant/s unloading at indicated places including all preparatory works connected with the work and as per the scope of the work described in the tender including dewatering. Central Pit Part A (2950E to 4300E) 4.50 Lac BCM & Central Pit Part B (4300E to 5900E) 5.00 Lac BCM
Excavation and removal of OVER BURDEN/WASTE ROCK including, drilling, digging, excavation, loading and transportation of Overburden/ waste rock/ to indicated dump yards with all leads and lifts and all other allied and preparatory works connected with the work as per the directions of Engineer in charge and as described in the scope of work of this tender including dewatering. Central Pit Part A (2950E to 4300E) 73.00 Lac BCM Central Pit Part B (4300E to 5900E) 80.00 Lac BCM
Rate for Form-8 , Sl no. 1 Transportation of over burden- waste rock over a lead beyond 5.0 Kms. (one side) for all lifts and stacking/disposal/ spreading of the same in the areas as indicated by the Engineer-In- Charge up to the formation levels as approved for filling work and including preparatory work and rehandling of rock for stacking at any designated site, as per the scope of the work described in the Tender & specifications of the contract for every additional distance of 1 Km or part thereof over a lead beyond 5.0 Kms. (one side) and up to a lead of maximum 10.0 Kms. (one side).
Rate for Form-8 , Sl no. 2 Operation and Maintenance of at least 05 nos. of tube wells in working conditions with all electrical connections etc; for supplying water for six months after expiry of contract. The water extracted from these tube wells is being discharged at Hydrants near MMO and E Block for use in mine & collected to GLR near HGO Crushing Plant and PHED-GLR near base camp colony through a network of pipelines
Chaitanya Energy Pvt Ltd
Chowgule And Company Private Limited
M/S SAIYYED AKHTAR ALI
Guru Naman Motors JV
M/S SHREE BALAJI CONSTRUCTION COMPANY
SKK INFRA SOLUTION PRIVATE LIMITED
HARI RAM GODARA JV
I.R. Construction Company (JV)
Sarvodaya Mining Services
k.k.gupta constructions pvt ltd
Kayden Infra Engineering Private Limited
ABHINAV CONSTRUCTIONS
S S AND Company
SPG INFRAPROJECTS PVT LTD
Ravi Infrabuild Projects Pvt. Ltd.
NAV BHARAT BUILDCON PRIVATE LIMITED
R K CONSTRUCTION AND EARTH MOVERS
NTC Ventures Private Limited
RMSCO
MYTHRI INFRASTRUCTURE AND MINING INDIA PRIVATE LIMITED
Rocktech Engineers
stage.html
html • 0.10 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid