Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Not Acceptable |
| 4 | Rejected-Technical 62 NOIDA UTTAR PRADESH | SANT KABEER NAGAR | UTTAR PRADESH | 272125 | Rejected-Technical Not Acceptable |
Tender Value
Refer Docs
EMD Value
₹12.5 L
Closing Date
1 Mar 2023, 3:00 pmClosed
Balakrishnan Rangaraju
TECHNIP ENERGIES INDIA LTD, CHENNAI
SUPPLY OF DISTRIBUTION TRANSFORMERS FOR NUMALIGARH REFINERY EXPANSION PROJECT
2023_NRL_734214_1
TP/082176C/NRL/PQ/049
Open Tender
Electrical Goods/Equipment
240 days
NUMALIGARH
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹12.5 L
Yes
19 May 2023
10 Jan 2023
2 Mar 2023
10 Jan 2023
1 Mar 2023
28 Jan 2023
6.6/0.433kV, 2MVA, DYN11, Z=8.5% WITHOUT -VE TOLERANCE,ONAN, WITH OCTC OF RANGE +/-5% IN STEPS OF 2.5% PER STEP ALONG WITH 2 NOS. OF NEUTRAL CTS (3200A/1A CLPS15VA, 3200/1A CL5P20 15VA) including condition monitoring as detailed in the specification TP-1ZZZA-EL-SPE-0017 and including supply of suitable double compression glands and lugs for power and control cables (Secondary side shall be suitable for bus duct connection)
6.6/0.433kV, 2MVA, DYN11, Z=8.5% WITHOUT -VE TOLERANCE,ONAN, WITH OCTC OF RANGE +/-5% IN STEPS OF 2.5% PER STEP ALONG WITH 2 NOS. OF NEUTRAL CTS (3200A/1A CLPS15VA, 3200/1A CL5P20 15VA) including condition monitoring as detailed in the specification TP-1ZZZA-EL-SPE-0017 and including supply of suitable double compression glands and lugs for power and control cables (Secondary side suitable for cable connection for the cable size mentioned in Technical Notes-7)
6.6/0.433kV, 2.5MVA, DYN11, Z=8.5% WITHOUT -VE TOLERANCE, ONAN WITH OCTC OF RANGE +/-5% IN STEPS OF 2.5% PER STEP ALONG WITH 2 NOS. OF NEUTRAL CTS (4000A/1A CLPS15VA, 4000/1A CL5P20 15VA) including condition monitoring as detailed in the specification TP-1ZZZA-EL-SPE-0017 and including supply of suitable double compression glands and lugs for power and control cables (Secondary side shall be suitable for bus duct connection)
6.6/0.433kV, 0.8MVA, DYN11, Z=5% WITHOUT -VE TOLERANCE, ONAN WITH OCTC OF RANGE +/-5% IN STEPS OF 2.5% PER STEP ALONG WITH 2 NOS. OF NEUTRAL CTS (1250A/1A CLPS15VA, 1250/1A CL5P20 15VA) including condition monitoring as detailed in the specification TP-1ZZZA-EL-SPE-0017 and including supply of suitable double compression glands and lugs for power and control cables (Secondary side suitable for cable connection for the cable size mentioned in Technical Notes-8)
6.6/0.433kV, 1.25MVA, DYN11, Z=5% WITHOUT -VE TOLERANCE, ONAN WITH OCTC OF RANGE +/-5% IN STEPS OF 2.5% PER STEP ALONG WITH 2 NOS. OF NEUTRAL CTS (2000A/1A CLPS15VA, 2000/1A CL5P20 15VA) including condition monitoring as detailed in the specification TP-1ZZZA-EL-SPE-0017 and including supply of suitable double compression glands and lugs for power and control cables (Secondary side shall be suitable for bus duct connection)
Mandatory spares as per Spare parts – Special tools and consumables philosophy Annexure-4 “TP-1ZZZA-PQ-PRC-0005” for Distribution Transformer (2.5MVA)
Mandatory spares as per Spare parts – Special tools and consumables philosophy Annexure-4 “TP-1ZZZA-PQ-PRC-0005” for Distribution Transformer (2MVA)
Mandatory spares as per Spare parts – Special tools and consumables philosophy Annexure-4 “TP-1ZZZA-PQ-PRC-0005” for Distribution Transformer (1.25MVA)
Mandatory spares as per Spare parts – Special tools and consumables philosophy Annexure-4 “TP-1ZZZA-PQ-PRC-0005” for Distribution Transformer (0.8MVA)
SPECIAL TOOLS AND TACKLES As per Manufacturer’s recommendation for the above Distribution Transformers
Pre-commissioning / Commissioning / Start-up spares As per Manufacturer’s recommendation for the above Distribution Transformers
Training to 10 Nos. of Owner personnel at NREP Site for 1 week for the entire package (Including condition monitoring).
Training to 2 Nos. of Owner personnel at OEM’s Factory for 1 week for the entire package (Including condition monitoring).
Bidder shall provide Per Diem Rate for Supervision services for Installation, testing and commissioning for the entire package including Commissioning / Support Engineer from OEM shall be stationed at NREP Site for the duration of 1 month from the date of commissioning & handover for the entire package
Cost for Additional Warranty period of "24 months after commissioning or 36 months after dispatch whichever is earlier” ( as per Note 17)
Kanohar Electricals Limited
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid